索塔 的英文怎麼說

中文拼音 [suǒ]
索塔 英文
cable bent tower
  • : Ⅰ名詞1 (大繩子; 大鏈子) a large rope 2 (姓氏) a surname Ⅱ動詞1 (搜尋; 尋找) search 2 (要; ...
  1. St andrews university researchers studying in sarasota bay off florida ' s west coast florida discovered bottlenose dolphi used names rather than sound to identify each other

    英國聖安德魯大學的研究人員們在位於佛羅里達西海岸的薩拉索塔灣進行了此項研究,發現寬吻海豚並非通過嗓音,而是通過「名字」 (叫聲的內容)來識別對方。
  2. St andrews university researchers studying in sarasota bay off florida ' s west coast florida discovered bottlenose dolphins used names rather than sound to identify each other

    英國聖安德魯大學的研究人員們在位於佛羅里達西海岸的薩拉索塔灣進行了此項研究,發現寬吻海豚並非通過嗓音,而是通過「名字」 (叫聲的內容)來識別對方。
  3. St andrews university researchers studying in sarasota bay off florida ' s west coast florida discovered bottlenose dolphins used names rather than sound to identify each other. the three - year - study was funded by the royal society of london

    英國聖安德魯大學的研究人員們在位於佛羅里達西海岸的薩拉索塔灣進行了此項研究,發現寬吻海豚並非通過嗓音,而是通過「名字」叫聲的內容來識別對方。
  4. There are two main results in the thesis. firstly, the influences of bridge tower upon stable type suspension bridge static and kinetic analysis are made

    本文的成果有兩點:一是通過計算得到了索塔對穩定橋的靜力和動力分析的影響。
  5. The suspension bridge consists of the following parts : bridge tower, main cable, hanger rod, stiffened girder and anchor bank. in the past, analytic method based on the suspension mechanics was mostly adopted in stress analysis of suspension bridge

    過去對懸橋的受力分析多採用基於懸力學的解析法,將主纜、加勁梁以及索塔各部分化整為零,對各部分的受力情況單獨考慮,並且分別計算各自的內力。
  6. Sowing the seeds of truth in sarasota

    在莎拉索塔撒播真理的種子
  7. No back - stays & inclined pylon cable - stayed bridge is a new one. she has very prominent mechanical characters that it substitutes the deadweight of inclined pylon for the back stays force to counteract the girder deadweight of main - span

    無背斜拉橋結構體系新穎,其最大的受力特點是利用傾斜索塔的自重來平衡主跨主樑上的恆載和活載,而省去了背及其力。
  8. The curve of arch rib, rib section bending, splice of rib sections, seperator of tube, bracing plates, bracing system, meeting of arch, concrete pumping, hangers, tie - rods, the tower of the cable crane and the guy ropes, technical specifications of cfst arch bridge are discussed

    對鋼管混凝土拱橋的拱軸線選用、鋼管節段彎制、節段拼接、管內分隔倉、綴板設計、聯結繫系統、合龍設計及其細節、管內混凝土的泵送、吊桿、系桿、纜吊機與扣索塔架、技術規范等12個問題進行了探討。
  9. The says only about one - third of the school districts in florida may answer a call for proposals by october first

    薩拉索塔先驅論壇報說佛羅里達只有大約1 / 3的教學區會在10月1日前做出回應作為申請。
  10. The shantou bay suspension bridge is the first mordern suspension bridge in china its substructures are mainly towers and anchorages this paper presents some of the key techniques of the substructures construction , including the cable anchorage system setup , the hydrated heat control in the anchorage , construction of the foundation and bearing plate of the tower in the ocean , the control of tower construction , etc

    汕頭海灣大橋是我國第一座現代懸橋下部結構主要包括索塔和錨碇本文介紹了該橋下部結構施工的一些關鍵技術環節,包括主纜錨碇錨固系統的安裝,大體積混凝土的溫控防裂,主基礎和承臺的海上施工,柱滑模施工控制等
  11. In order to satisfy the demands of the main pylon measure benchmark stakingout and the cable anchor - pipe positioning for cable - stayed bridge, a new georobot relative datum 3d polar coordinate method is presented

    摘要結合斜拉橋索塔基準放樣及斜拉預埋鋼管的精密定位的需要,提出了一種新的基於測量機器人的三維相對基準放樣方法,並成功用於灌河特大橋斜拉橋主橋的施工放樣。
  12. The theme get the integration between design of the large highway bridge in anqing and theory studying, carry out an research in emulating calculation of steel box beam cable - stay bridge. the theme used the transfer - matrix in solving computing of cable - stay bridge structure, got a improving in computing of cable and the load and landed of cable strength

    針對鋼箱粱斜拉橋的特性,論文確定了以控制箱粱梁端位移與拉內力為調整目標,利用循環的正裝過程對斜拉橋的模擬進行計算,並對索塔頂位移進行了良好的控制。
  13. On sunday, october 14, 2001, florida initiates attended the 6th annual vegetarian festival, sponsored by sarasota in defense of animals, a local non - profit organization dedicated to defending animal rights and welfare and supporting habitat protection

    2001年10月14日星期日,佛羅里達的同修們叄與了第六屆的素食節,這是一個由莎拉索塔動物保護協會所發起的活動,該協會是一個地方性的非營利組織,致力於保護動物的權利福祉和棲息地。
  14. Model of a passenger aerial ropeway is established after conducting structural analysis of the cable, supporting mast and basket, and stress analysis is respectively performed under passengers or wind loads, providing a method of overall static strength design of passenger aerial ropeways

    摘要針對客運道系統中懸架、吊籃等特定結構,著重解決了道系統分析中的整體有限元建模問題,並提出了客運道系統在自重或風力作用下的應力分析方法, ?客運道系統靜強度設計提供了整體性計算方案。
  15. A team of researchers led by vincent janik of the university of st

    為了找到答案,科學家們研究了生活在美國佛羅里達州薩拉索塔海灣的一些海豚。
  16. Stress response of the tower wall at the least favorable section of all of the single section on the cable tower anchor segments of the cable - stayed bridge was studied under the annular pre - stress with cable force and tensile force by comparing the experiment results of the full - scale model of segment with the results of the finite element simulation analysis according to the forced status of the cable tower under practical conditions

    摘要通過索塔錨固區節段足尺模型試驗結果和有限元模擬分析比較,結合索塔受力的實際工況,對異型截面斜拉橋索塔錨固區節段最不利斷面在環向預應力與力共同作用下壁的應力響應進行了研究。
  17. The shows during the big - top era were a logistical miracle, moving around 700 animals and about 1500 workers and performers each day from town to town by railroad

    美國佛羅里達州薩拉索塔約翰和梅波潤格林藝術博物館的提波茲學習中心,主要展覽十九世紀末至二十世紀初馬戲篷表演的豐富歷史。
  18. The tibbals learning center at the john and mable ringling museum of art in sarasota, florida, focuses on the rich history of the big - top shows of the late 19th and early 20th century

    美國佛羅里達州薩拉索塔約翰和梅波潤格林藝術博物館的提波茲學習中心,主要展覽十九世紀末至二十世紀初馬戲篷表演的豐富歷史。
  19. It has also pounded the keys, devices, disposition of surveyed spots, measure method and procedures, data gathering and process ( relation with construction workmanship ), error analysis and adjustment, control precision and rules, mechanism and method of control, tables of records, results and discussion. after completion, the bridge has good behaviors in dead loads state, cable forces, shape style of main beam, stress and strain of concerned sections, displacements of the tower top, which assure the reasonable state of cables, main girder and towers, and safe under running, demonstrate supervision

    通過課題研究與實橋運用,荊州長江公路大橋斜拉橋施工過程各狀態和成橋恆載狀態下,斜拉力、主梁線形、主梁關鍵截面應變、索塔頂水平偏位等關鍵項目的施工控制結果均滿足設計期望值的要求,滿足橋梁施工范圍的要求,大橋主梁線形流暢,斜拉、主梁和索塔三大體系的受力狀態合理,橋梁結構安全可靠,大橋的監測監控取得了圓滿成功,並為該橋營運階段的長期監測監控奠定了良好的基礎。
  20. Firstly, the domestic researches, which have been reported, are introduced. then the characteristic of the system in estimation of prestressing losses is analyzed by theoretical method, and the reasons that the elimination of tendon is large and test results are not consistent are pointed. using fem software ansys, anchorage zone of pylon are analyzed

    論文首先介紹了國內現階段對該問題的一些研究成果,然後從理論上分析了小半徑大噸位環向預應力體系在計算預應力損失方面的特點和造成張拉伸長量偏大且實測的數據離散性較大的原因,並採用國際權威的有限元分析軟體? ? ansys從理論上進行分析和索塔錨固區最不利節段的足尺寸模型試驗進行校驗。
分享友人