終渣 的英文怎麼說

中文拼音 [zhōngzhā]
終渣 英文
final slag
  • : Ⅰ名詞1 (最後; 末了) end; ending; finish 2 (指人死) death; end 3 (姓氏) a surname Ⅱ形容詞(...
  • : 名詞1 (渣滓) dregs; residue; sediment:煤渣coal cinder; 殘渣 dregs; 豆腐渣 soya bean residue; 豬...
  1. Static models include terminal control model, oxygen - supplying model, slagging model and bottom blowing model ; dynamic models include decarbonization speed model, molten steel warming model and the model for the amount of refrigerant

    靜態模型包括點控制模型、供氧模型、造模型、底吹模型;動態模型包括脫碳速度模型、鋼水升溫模型和冷卻劑加入量模型。
  2. Dilute acid leaching with stirring scrubbing is the most optimum method, which can get three productions, dilute acid leaching solution, residue mixture and final product aluminum foil and copper foil

    而稀酸浸出? ?攪拌擦洗法能很好的達到分離目的,獲得三種產物:稀酸浸出液、混合黑和最產品鋁箔、銅箔。
  3. The moderate supersonic carbon added to the mold flux for ultra - low carbon steel is used to stay the melting speed as skeleton. then the mold flux coils have the good adiabatic, insulation and even flow property. at the same time it cause the carbon increase in the steel slabs and the operation of the ultra - low carbon is affected at last

    超低碳鋼連鑄結晶器用保護中,外加中超碳黑作為骨架降低熔化速度,使保護具有良好的絕熱保溫性、均勻流動的潤滑性,但同時卻會引起鋼鑄坯的碳增量,最影響超低碳鋼的成功操作。
  4. But some problems are occurred, such as low bath temperature, difficulty in lime melting, slag overflow at vessel mouth, increase of metal consumption, difficulty in dephosphorization and low hitting rate at the final

    在生產中出現熔池溫度低、廢鋼和石灰不易熔化、爐口溢、金屬消耗增加、脫磷困難、點命中率低等問題。
  5. Meanwhile it retains evenness on lift force to prevent leakage of residue that is caused by installation clearance error or changes in welding criteria, flow off molten iron as well as break - over welding, so that the ideal fosion depth and finishment have been fulfilled

    在需原動力的條件下,該機利用彈性夾角變化,隨著筒體轉動,使墊層焊劑始緊貼筒體外側環向焊接區,並保持托力均勻防止因裝配間隙誤差或焊接規范變化而引起漏,鐵水下淌及焊穿現象,達到理想的熔深度和光潔度。
  6. These results show that since the existent defects of combustion device structure and its hypothetical circle of contact, these make a poor primary and secondary wind rigidity in operation and a too big actual circle of contact. in addition, the coal used is extreme prone to burn and reside in boiler. under such a condition, the coal powder ignites earlier in a short time and short distance when it leave the jet - combustioning device, and splashes the water cooler, eventually this results in a burned coal residue in boiler

    針對宏偉熱電廠410t / h燃煤鍋爐嚴重結問題,對燃煤的結性、爐內溫度工況及空氣動力工況等進行實驗研究,由於燃燒器結構和假想切圓選擇的缺陷,使得鍋爐在正常運行時,一、二次風剛性較差,實際切圓過大,加上目前燃用煤質屬于極易燃、易結煤質,致使煤粉在離開噴燃器很短的時間、較短的距離內開始著火,並沖刷水冷壁,最造成爐膛結
  7. Take the kcr east rail to sha tin station. leave the station through the northern exit and head towards the direction of pai tau village. then take green minibus ( travel route no. 69k ). the ride lasts for some 20 minutes and terminates next to the villa de jardin

    交通:乘九廣東鐵抵達沙田站,從北面閘口出閘,往排頭村方向走,然後乘搭綠色專線小巴69k路線,到沙田甸山花園站,車程需時約20分鐘。
  8. The flow of the molten slag pool determines the temperature distribution and the pool profiles in the electroslag casting process, which finally impact on the quality of ingot casting

    摘要電熔鑄過程中熔的流動決定了熔鑄體系溫度場的分佈以及金屬熔池的形狀,最影響熔鑄鋼錠的質量。
  9. This scene was as silent as if all the figures had been shadows and the firelit apartment a picture : so hushed was it, i could hear the cinders fall from the grate, the clock tick in its obscure corner ; and i even fancied i could distinguish the click - click of the woman s knitting - needles. when, therefore, a voice broke the strange stillness at last, it was audible enough to me

    這兒那麼靜謐,我能聽到煤從爐柵上落下的聲音,昏暗的角落時鐘的嘀嗒聲,我甚至想象我能分辨出那女人嚓嚓嚓嚓的編織聲,因而當一個嗓音于打破奇怪的寧靜時,我足以聽得分明。
  10. Aiming at high design requirement and great technical difficulties, construction methods such as blasting control, excavating and mucking in the tunnel and grout injection in the holes with anchor have been improved on so as to advance construction efficiency, quicken construction schedule and increase economical benefits finally

    針對此工程設計要求高、技術難度大等特點,對爆破控制、洞室開挖出、錨桿注漿等施工方法進行了改進,提高了施工工效,加快了施工進度,最提高了經濟效益。
分享友人