結構開洞 的英文怎麼說

中文拼音 [jiēgòukāidòng]
結構開洞 英文
structural opening
  • : 結動詞(長出果實或種子) bear (fruit); form (seed)
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  • 結構 : 1 (各組成部分的搭配形式) structure; composition; construction; formation; constitution; fabric;...
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧圍巖應力、變形的影響。
  2. The current travel the main contents of culture stanzas to include the building mountain district exquisite article the resources to display, the literature performance wait the activity. the building mountain that rites part is solemn is cultured, and perform the part of and happiness and crazy, outstanding suburb color, mold the clear suburb topic of to emerge with the consciousness with the the new atmosphere to travel the area of big area, culture. the current travels the culture stanza with the happy suburb, sahuan building mountain " for the topic, travel the culture stanza the opening ceremony and saint mountain the scenery to spend a holiday the area to start practice the celebration ceremony the rites, building mountain the economic trade to talk over the meeting with the tenth building mountain, continuously the fire of the human civilization the motherland is good, the capital city is beautiful " three corpus activities of activities of publicity educations are with the stanza of white grass cookhouse ground sahuan son ", ten cross river the light stanza, celebrate the 7 1 " hall the whole image for ascending folk king of country whip performing, cloud residing the the series the activity, the spending the hole, silver the fox the hole, fairy the the hole, cloud the water hole " fourth holes look foring the competing and go to the countrying is a farmering, cut in lining " experience personallying a day swiming sixth items prop upping the activity to main contents, molding the root in peking the, hole the kingdom " ; release the north line of building mountain to travel the hallway, and adjust the mountain area the environment of economic construction, ecosystem, and promote the farmer to increase to accept, quickly the building mountain travel a developments step, and go on a tour for whole municipal and periphery visitor, recreational, the amusement invest with chinese and foreign businessman to start a business the offering is more, more ideal choice. attraction the more people travel the building the mountain, investment into the building mountain, and further push that area to completely develop

    儀式部分莊重典雅,表演部分歡樂狂野,突出郊野色彩,塑造鮮明的郊野主題和親和意識,展現房山旅遊大區文化名區的新氣象。本屆旅遊文化節以「 happy郊野撒歡房山」為主題,以第十屆房山旅遊文化節幕式暨聖蓮山風景度假區業慶典儀式房山經貿洽談會續燃人類文明之火「祖國好京城美」宣傳教育活動三項主體活動和白草畔野營地「撒歡兒節」十渡河燈節慶「七一」堂上鄉村民俗霸王鞭表演雲居寺祈福迎祥系列活動「石花銀狐仙棲雲水」四尋寶比賽及下鄉務農「插隊」體驗一日游六項支撐活動為主要內容,塑造「北京根祖,溶王國」的整體形象推出房山北線旅遊走廊,調整山區經濟,優化生態環境,促進農民增收,加快房山旅遊黃金圈建設步伐,為全市及周邊遊客出遊休閑娛樂和中外客商投資創業提供更多更理想的選擇。吸引更多的人旅遊到房山投資進房山,進一步推動該區全面發展。
  3. This paper analyses the stress and deformation of the two lining structure types of the surge shaft surrounded with crush rock under the action of high water pressure by using fem, compares the two lining types ' s merits and demerits in stress, deformation, fracture state, the combining bearing of surrounding rock and lining structure, the safety and economics

    本文針對圍巖條件比較破碎,裂隙發育的調壓井,就兩種襯砌型式分別進行了高水頭作用下的有限元數值模擬,從調壓井襯砌選型角度分析對比了兩種襯砌型式在圍巖及襯砌應力與變形、襯砌鋼筋混凝土裂、圍巖與襯砌聯合承載、安全儲備、經濟等方面的優劣。
  4. However, along with the increasing of construction quantity of the infrastructure of irrigation works, traffic, communication etc., newer and higher requirement of geotechnical anchoring are made in slope, major dam, bridge, tunnel, deep foundation ditch engineering and the construction engineering such as anti - capsize, anti - float, anti - slippage engineering of the buildings. for example, self - intension of rock and soil is required to exploit better ; carrying capacity of anchor increase according to anchoring length ; anchor should be sufficiently lasting and should not influence the exploitation of adjoining stratum

    但另一方面,隨著我國水利、交通、通訊等基礎設施建設力度的加大,邊坡、大壩、橋梁、隧、深基坑以及建築物的抗傾倒、抗浮力、抗滑移等建設工程將對巖土錨固提出一些新的和更高的要求:如要求進一步調用巖土體的自身強度,錨桿應具有足夠的耐久性,錨桿的使用應不影響周邊地層的發等。
  5. Too much embankment of filled soil will result the destroy of road surface or instability of high - stack soil ; soil pressure at the top of culvert is the key parameter of culvert structure design, more or less of the parameter will result in economic waste or failure of structure

    堤頂沉降過大,輕者破壞路面,重者路堤失穩,涵頂部土壓力是涵設計的控制指標,計算過大導致經濟浪費,過小導致涵裂,影響其使用壽命。
  6. According to the special surface structure and actualities that the city is extending along the transportation line and river region because of the restriction caused by the mountains in the two sides of every cities in qingyang. the author thinks it is not good to squeeze out the existence of cave dwellings during the course of urban construction, and it is necessary to emphasize the symbiosis between urban and cave dwellings. the author conceives that it is feasible to develop group - dwellings in the steep - sides of mountain and especially to adapt to constructing " climb - slope cave dwellings which are covered with earth "

    根據慶陽特殊的地表和城鎮發展受兩側山體限制而沿交通線與川區無限蔓延的現狀,筆者認為在慶陽城鎮建設中不應完全排擠窯居的存在,而是要強調城鎮與窯居的共生,並設想充分利用兩側陡坡地帶發展居住組團模式,建設新型「爬坡式覆土窯」建築群落,這種「城鎮型窯」可作為城鎮建設空間橫向的延續和拓展,防止城鎮呈線狀無限蔓延的畸形發展態勢;提倡運用現代科學技術對傳統窯民居進行改造與創新,要加快新式窯居的試點建設;建議積極發慶陽窯旅遊資源,並提出了「窯地產」和「綠色窯產業」的全新概念。
  7. Associated with a project of the planned xuefengshan tunnel with 7. 6 km long during the construction of shaoyang to huaihua expressway in hunan province of shanghai to ruili national trunk highway, this paper firstly makes an introduction of the frequently - used analysis & computation methods for tunnel supporting structure. then, based on the analysis of the basic theory about the interaction mechanism of surrounding rock and support structure, a spatial computation model is made, a coupling numerical computation method with 3 - d elastic - plastic finite element and infinite element is proposed, and a comprehensive analysis has been made to the effects of the overall stability and safety of the surrounding rocks of different characteristics, different classes and under different construction methods. and thus the problem of 3 - d infinite region to which applying the general finite ca n ' t do has been resolved

    6公里的雪峰山隧道工程,首先介紹了隧道支護的常用分析計算方法;然後通過對隧道施工過程中,室穩定性與支護相互作用機理的深入分析,建立了隧道施工過程的空間計算模型,提出了採用三維彈塑性有限元-無限元耦合的數值計算方法,綜合分析了隧道在不同圍巖特性和圍巖類別條件下,以及不同施工挖方案等對隧道圍巖整體穩定和安全性的影響,從而解決了通用有限元方法難以解決的隧道三維無限域問題;其可充分發揮有限元法在分析非線性方面的有效性和成熟性,以及無限元法在分析處理無限域和半無限域方面的精確性和簡便性,為隧道施工過程中圍巖的穩定性分析辟了一條新的途徑。
  8. Mitigate the risk of exposing web services vulnerabilities in a heterogeneous service - oriented architecture and reduce the chances of adversely impacting the service - level agreement guarantee for uptime availability

    降低在異的面向服務體系( service - oriented architecture , soa )中公web服務漏的風險,以及減少對利用服務品質協議保證正常運行時間可用性產生不利影響的可能。
  9. Abstract : in order to provide the reasonable parameters in the reliability analysis of tunnel structure and the criterion in the quality control of tunnel engineering, in this paper, the over - under - excavated values of the real - state outline of tunnel excavation are obtained by the near - field photographic method. by using mathematical statistic method, the figure features and probability distributions of the over - under - excavated values of the surrounding rock, including deferent positions of same cross section, are analyzed

    文摘:採用近景攝影的方法,從隧道挖毛中獲取圍巖超欠挖數據,通過數理統計的方法,分析各類圍巖超欠挖的數字特徵及概率分佈,同時得出各類圍巖超欠挖在隧道斷面不同部位的分佈規律,為隧道的可靠度研究提供可靠參數,也為隧道工程質量控制提供基準
  10. Based on the simplified structure of rock mass, three - dimensional finite element numerical modeling technique is used to analyze systematically the distribution features of filed, strain field and plastic zone in the surrounding rock mass of the underground cavities after the excavation

    在巖體模型概化的基礎上,采有三維有限元數值分析方法,系統研究了大跨度、高邊墻地下室群挖完成後圍巖的二次應力場、變形場和塑性破壞區的變化特徵。
  11. A freak wormhole opened up in the fabric of the space - time continuum

    一個奇異的空間蟲了時空閉聯集的
  12. Secondly, grounded on the study of the distribution of the high external waterpressure and high geostress and the characteristic of the rock in engineering area, the paper built the elastoplastic fem numerical simulation model, and think over the procedure in tunnels excavation and the history of work of water load, and then get the relations between the different tunnels diameter, different permeability coefficient and depth of the grouting rock and the deformation, stress distribution and plastic range of the surrounding rock and support structure. finally, according to the modern design theory of tunnels construction, the particular design of country rock reinforcement and support structure are researched and presented for diversion tunnels

    接著,本文在深入研究工程區高外水壓力及高地應力分佈規律及巖體特性的基礎上,建立起高地應力、高外水壓力作用下隧圍巖非線性有限元模擬計算模型,然後考慮隧挖過程、水荷載的作用歷史,通過計算分析得出了不同徑、不同的灌漿圈滲透系數和不同的灌漿圈深度以及不同挖過程與圍巖及支護的應力、位移和塑性區的關系。
  13. Aiming at the structure characteristics of the pipeline system of the existing boiler combustion equipment, the paper work out the new - style air speed measure components via the theory analysis of the existing measure components of all kind of forms and measure theory. and then the paper designs and builds the wind tunnel test - bed to process the test and research of the air speed measure components in order to realize it ' s structure and each characteristic parameter

    針對現有的鍋爐燃燒設備管路系統的特點,論文通過對現有的各種形式、測量原理的流量測量裝置的理論分析,設計出新型的風速測量元件,並且設計、建立滿足試驗所需的風試驗臺,對風速測量元件的及各項特性指標進行試驗研究,完成一次元件的發工作。
  14. Using the finite element method ( fem ), the simulation and analysis on this construction process were carried on, and the different stress state of soil at different construction period was rendered. and the influence of different stress paths ( foundation excavation - unloading & excavation filling - reloading ) on the stress and the displacement was also reflected and researched. the law of non - linear constitutes of soil was presented in the simulation and analysis

    模擬分析再現了土體的非線性本關系,得到了基坑挖時土體變形和應力變化的一般規律;在基坑及上覆土體回填時,通過分層填築的有限元模擬和地基、涵、土體三者相互作用的有限元分析,得到施工束太原理工大學碩士學位論文時的位移場和應力場,同時求得涵內力。
  15. Based on the simplified structure of rock mass, flac ( superscript 3d ) numerical modeling technique is used to systematically analyze the distribution features of the secondary stress field, strain field and plastic zones in the surrounding rock mass of the underground cavities after the excavation

    摘要在巖體模型概化的基礎上,採用flac (上標3d )數值分析方法,系統研究了瀾滄江某大型水電站大跨度、高邊墻地下室群挖完成後圍巖的二次應力場、變形場和塑性破壞區的變化特徵。
  16. Usually long span roofs can be categorized as closed and open type regarding whether their inner surface suffers from wind directly or not. according to these different types, different ways of wind runnel test are given to obtain the wind pressures on long span roofs. and the characteristic of wind pressure distribution on each type of long span roofs is discussed with regard to the roof shapes

    首先,對于大跨度屋蓋的表面風壓,本文提供了一套具體的分析思路,分四周封閉體型和整體敞體型對大跨度屋蓋進行風試驗方法和風壓分佈規律的分析,並討論了大跨度屋蓋的干擾效應和抑風措施。
  17. Frame supported short pier shear wall structure with transition floors is a useful structure pattern with good ability in resisting seismic load. the lower part is frame with large opening column - grid while the upper part uses short pier shear wall with wide openings. so this structure decreases the difference between stiffnesses of lower part and upper part

    帶梁式轉換層的短肢剪力墻,其下部為大間的柱網框架,上部採用較大的短肢剪力墻,有效地降低了轉換層上下之間的剛度差異,因而是一種抗震性能較好的型式。
  18. The numerical simulation of displacement of an underground cave was presented to verify the model in comparison with the results obtained by goodman joint element - based fe analysis, and good accordance could be observed

    將巖體和節理按兩種材料考慮,對地下節理巖體進行有限元分析,並與採用復合本關系的計算進行了比對,得到了令人滿意的果。
  19. Soon after einstein published his general theory of relativity in the beginning of 20th century, karl schwarzschild found a mathematical solution of the theory to describe the spacetime structure of such object with spherical symmetry. that was the prelude to the study of black holes

    愛因斯坦在二十世紀初發表了廣義相對論后不久,史瓦西便利用廣義相對論方程求得一個描述球對稱天體附近時空的解,為黑的研究展了序幕。
  20. In this paper, based on simulation modeling laws of geometry, constitutive relations, stress conditions and construction, a simulative calculation model has been proposed by considering the mechanical problems during the underground tunnel ' s construction and adopting constitutive models of enveloping type which can consider elasto - plastic materials and their cracking. the model can describe rock multi - media characteristic consider the interrelation of shoring structure and stratum reflect some influencing factors, for example : faultage interlayer joints, construction process and so on

    本文合地下隧工程施工過程中的力學問題,基於幾何、本、應力狀態和施工過程等四方面模擬建模的原則,採用可以考慮材料彈塑性和裂的包絡型本模型,建立能描述巖體多介質的特點和能考慮隧支護與地層的相互作用,同時能反映斷層、夾層、節理裂隙以及施工全過程等影響的巖體模擬計算模型。
分享友人