絕熱過程 的英文怎麼說

中文拼音 [juéguòchéng]
絕熱過程 英文
adiabatic operation
  • : Ⅰ動詞(斷絕) cut off; sever Ⅱ形容詞1 (完全沒有了; 窮盡; 凈盡) exhausted; used up; finished 2 ...
  • : 過Ⅰ動詞[口語] (超越) go beyond the limit; undue; excessiveⅡ名詞(姓氏) a surname
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 過程 : process; procedure; transversion; plication; course
  1. The remainder of the power stroke is an adiabatic expansion.

    動力沖的後段是膨脹
  2. In an adiabatic process no heat is allowed to enter or leave the system.

    絕熱過程中,不容許量進入或離開系統。
  3. The flow of heat requires finite time, so any process performed quickly enough will be practically adiabatic.

    因為流需一定的時間,所以足夠快速進行的任一實際上都是的。
  4. It follows that every reversible adiabatic process is one of constant entropy, and may be described as isentropic.

    可見可逆絕熱過程都是熵不變的,可以把這種叫做等熵
  5. This article introduces briefly the process of design and characteristic of structure of db930 tube and discusses the main problems of technology and technique which was met during the manufacture and the measures having been adopted are emphatically. it discusses the solve measures in following six aspects : the filament current is too large, carbon deposits during the carbonizing of cathode, the capacitance between the first grid and the second grid is too large, transpiring happens inside the tube, the insulation resistance between the electrodes is too lower when the filament is on and the ability of bearing high voltage is too lower

    本文簡略地介紹了db930的設計及其結構特點,重點論述了在試制中遇到的主要工藝技術問題及解決問題的措施,圍繞解決燈絲電流大、陰極碳化時積碳、一柵和二柵之間的電容大、管內蒸散、態時極間緣低、耐高壓的能力差等六個方面的問題進行了論述。
  6. For a ball domain and a constant angular velocity, both existence theorem and non - existence theorem are also obtained by using the time - maping method, depending on the adiabatic gas constant r

    其中,在球形區域中有以下一些結果:我們通打靶法得到了,當角速度是常數時,方組( 0 . 1 )解的存在性和非存在性。而且該解依賴于常數。
  7. The control system of furnace " s temperature has been widely used in every walk of life, as an important link of repair and manufacture of the electrical equipment such as electromotor transformer etc., soaking lacquer drying craft has some especial requests on drying crafto this article starts with the analysis of drying chamber " s configuration, analyzed its configuration limitation and control function limitation according to the factory " s situation and advances the conception of heated air drying circulation, in addition, this article adopts an intellectualize a / d module, a development sampling tuning - voltage circuit, and presents the method to measure online the insulation resistance of products in order to improve constantly products quality

    而浸漆乾燥工藝作為電機、變壓器等電氣設備的修理、製造中的重要環節之一,對乾燥的質量要求有一定的特殊性。該文從乾燥爐的結構分析入手,聯繫到工廠的實際情況分析了結構功能缺陷和控制功能缺陷,提出了風循環乾燥的概念,同時,選擇了較為先進的a d板卡、電阻信號調理板等專業化智能卡,運用數字pid控制技術,構成了一個較有特色的計算機控制系統。此外,該文還從保證乾燥品質量的角度,採用智能化交流模塊和自製采樣調壓電路的方法,提出了在線檢測產修品的緣電阻的方法和手段,以確保企業產品質量不斷提高。
  8. Two temperature on the kelvin scale are to each other as the heats trasnferred between the same two reversible adiabatic surfaces at these two temperatures

    上式說明凱式溫度的定義是與在等溫面上一等溫由一可逆面轉換至令一個可逆面所吸收之量有關。由此定義的凱式溫標與物質的特性無關。
  9. The factors that probably leads to cracks are put forward based on the analysis, which in turn are : the deformation of surrounding rock and the deformation of concrete volume and the pelter of air temperature and thermal insulation temperature rise and the thickness of liner and cooling pipe

    分析得出了導致裂縫的幾種可能原因依次為:混凝土的圍巖變形、自生體積變形、氣溫驟降、溫升、襯砌厚度和冷卻水管等,為今後類似工提供理論依據。
  10. In the program, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress are considered. and such temperature control measurement as water pipe cooling, heat preservation of the dam surface, the pouring temperature control, the overflow across the dam top during flood season can also be simulated by numerical method

    序在編制中考慮了混凝土分層澆築、施工間歇、彈模變化、溫升、環境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度場及溫度應力場的影響,同時也考慮了水管冷卻、壩體表面保溫、控制澆築溫度、施工汛期壩頂面水等各種溫控措施的數值模擬。
  11. In this article, according to heat conduction theory, elastic creep theory and finite element theory, the temperature field and creep stress field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method, and the distribution law of the temperature field and creep stress field in the arch dam during construction and operation are systematically studied, and according to the construction process of concrete arch dam, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress in the arch dam are also considered

    論文根據傳導理論、彈性徐變理論及有限元理論,用三維有限元浮動網格法對拱壩施工期和運行期溫度場、徐變應力場進行了全模擬分析,較為系統的研究了混凝土拱壩施工期和運行期溫度場、徐變應力場的分佈規律,在分析中按照混凝土拱壩施工,考慮了混凝土分層澆築、施工間隙時間、彈模變化、溫升、環境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度應力的影響。
  12. The most efficient heat engine cycle is the carnot cycle, consisting of two isothermal processes and two adiabatic processes

    最有效的力循環是卡諾循環,由兩個等溫和兩個絕熱過程
  13. For many years, the drying furnace has been adopted with sealed structure and electrical heated, dial instruments are used to control the temperature of the drying furnace and to keep it invariable. parameter setting is inputted by manual method, heating time is completely controlled by operators ’ experiences or their moods, meanwhile, its control function is singular, not only having no automatic heating time and insulating monitoring, having no drying process monitoring, but also having no function of automatic recording and report printing, the workers ’ labor intensity is bigger. thus two abnormal situations are always come forth, one is the insulating performance and intensity of works cannot be guaranteed reliably, it perhaps need to be dried repeatedly, the other is always to extend the drying time in order to ensure the drying quality

    多年來乾燥爐一直採用悶罐式結構和電加方式,溫度控制採用指針式溫度控制儀表來實現爐溫的恆定,其參數設定由人工輸入,時間控制則完全憑操作者的經驗、情緒來掌握,其控制功能單一,沒有時間控制、緣自動監測功能,也沒有乾燥監視功能,更沒有多要素記憶、列印存檔功能,工人的勞動強度較大,所以就經常出現兩種異常結果:一是工件的緣性能和強度得不到可靠保證,需要反復乾燥;另一種是為保證乾燥質量,往往要延長乾燥時間。
  14. Abstract : there are offered many ways how to improve work of a spark plug. but one of the m ost important problems has not been solved yet. this is a thermal mode operation of a spark plug. the ideal spark plug should be instantly heated at the moment of occurrence of a spark and instantly cooled down in expectation of the foll owing electrical pulse. thus it balances between preservation of heat for self ? c leaning from scale and its removal in avoidance self ? ignition. in this article a uthor managed for this time to offer a spark plug with capability “ self ? regula tion ” of heat flux removed from a zone of ignition. essence of the offer is a t ip , which is transparent for heat flux. it is produced from single crystal of sap phire

    文摘:在如何提高火花塞的工作質量方面有多種方法,但是其中最重要的一個問題還沒有得到解決,那就是火花塞工作的學模型問題.理想的火花塞應該能在點火的瞬間被立刻加,並且在接下來的電脈沖中迅速冷卻,由此在量的存儲與散發之間取得平衡,以避免自點火.本文力圖展示一種具有自動調節源於點火區域流能力的火花塞,其技術的關鍵是頂部緣體材料,它是由藍寶石單晶製作,而非傳統的氧化鋁陶瓷
  15. Test results indicated : with the hoist of altitude, the increase of ice amount and the rise of pollutant, the average flashover voltage reduced. the character exponent generally depends on the insulator profile, ice amount, ice state and pollution severity etc. by means of a high - speed camera, a data acquisition system and high voltage test facilities, a series of the flashover processes on ice surfaces were record. the experimental results form this study and the subsequent theoretical analyses suggested : the thermal ionization of the air in front of an arc root resulted in arc movement ; the electrostatic force had an auxiliary effect of impelling arc propagation ; the electrical

    對攝像機、數據採集系統及高壓試驗裝置記錄覆冰緣子表面閃絡電弧的發展的試驗結果進行理論分析得出:弧根周圍空氣的電離導致了電弧的發展,靜電場力對電弧的發展起到了加速作用,電擊穿僅發生在閃絡最終的跳躍階段;通測量閃絡中的放電電壓、泄漏電流、閃絡時間、覆冰水電導率、電弧長度及電弧半徑等參數,得到了不同階段電弧(電弧起弧階段、電弧發展階段及完全閃絡)的發展速度、臨界電弧長度均隨覆冰水電導率的增加而減小。
  16. On awaking in the morning, in the inner chamber, in quiet meditation, in the expression in prayer of our ardent longings and desires, in the course of our daily work, in all our striving after obedience and holiness, in all our struggles against sin and self - will ? in everything there should be a waiting upon god to receive what he will bestow, to see what he will do, to allow him to be the almighty god

    在早晨醒起時,在內室里,在安靜的默想里,在我們切的願望和愛慕禱告的發表裡,以及在我們每天工作的里,在我們追求順服和聖潔里,在我們拒罪惡和己意里? ?在每件事上都要等候神? ?等候接受他所要賜給的,等候著看他要作什麼事,等候他來作我們全能的神。
  17. Adiabatic throttling process of gas is not isoenthalpic

    氣體的節流不是等焓
  18. The penetration process can be treated as adiabatic process, but the heat effect is not notable

    侵徹可視為絕熱過程,但溫升不顯著,材料依然表現為強化。
  19. Through using the data of numerical simulation by mm5 model, and introducing density temperature, cape ' s calculation accroding to the reversible saturated moist adiabatic process which correspond with the actual atmosphere course more was emphatically discussed. thirdly, based on this, the dcape is introduced farther. dcape has close relationship with convective downdraft and convective storms developme nt. fourthly, the using of hourly model - generated soundings is introduced in this paper

    本文通對2003年7月4日南京站的大暴雨的mm5數值模擬,引入密度溫度t _ ,重點討論了根據大氣可逆飽和濕絕熱過程進行cape的。第三步,在cape模式資料實現的基礎上,進一步討論新近提出的與對流風暴發展密切相關的下沉對流有效位能。
  20. This original presents the universal insulation materials and the general testing and evaluating method for pipelines " insulation of the thermodynamics power generating plant ; performs the insulation testing and evaluating of the high temperature steam pipelines of longfeng heat and power plant ; takes composite structural research on the high temperature steam pipelines, and establishes the relevant optimizing physical and mathematical model of the insulation layer, confirms the constraint and boundary condition, carries on optimizing design for the thickness of insulating layer ; in order to more systematically analyzing the present situation of insulation of the installation and pipelines of longfeng heat and power plant, develops a suit of software namely " the information associated decisive system for the insulation project ", taking advantage of this software can achieve. the design, evaluation and direction to building for the insulation project, examine the criterion of design and building, the perform ance and manufacture data of different insulation material, which is convenient to the selection of insulation material

    在進行保溫結構優化的中,主要是針對高溫蒸汽管道進行復合結構研究,並建立相應的物理及數學模型,找出其約束條件和邊界條件。同時為了更加系統地對龍鳳電廠設備及管道的保溫現狀進行分析,開發了一套「信息決策系統」軟體,利用該軟體可以實現的設計、評估及施工指導,並可以查閱設計及施工標準、各種材料性能和生產廠家的資料,便於材料的選擇。該套軟體的設計填補了國內空白,避免了改造、設計及施工中的無序現象,規范了熟工市場,從而為我國的選材、設計、施工及管理提供科學依據。
分享友人