網路控制階段 的英文怎麼說

中文拼音 [wǎngkòngzhìjiēduàn]
網路控制階段 英文
network control phase
  • : Ⅰ名詞1 (捕魚捉鳥的器具) net 2 (像網的東西) thing which looks like a net 3 (像網一樣的組織或...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : 名詞1. (臺階) steps; stairs 2. (等級) rank 3. [醫學] (耳蝸的三個螺旋管的任一個) scala 4. [數學] order 5. [地質學] stage
  • : Ⅰ量詞(部分) section; segment; part; paragraph; passage Ⅱ名詞(姓氏) a surname
  • 網路 : 1. [電學] network; electric network2. (網) meshwork; system; graph (指一維復形); mesh
  • 控制 : control; dominate; regulate; govern; manage; check; cybernate; manipulate; encraty; rule; rein; c...
  • 階段 : stage; phase; period; gradation; bench
  1. This scheme integrates universual data accesss technology of microsoft, which plays a more and more important role in three - lay c / s ( client / server ) and uses the technology of ado ( active data access ), adopts the asp script language in display the results and uses stored procedure of sql server in databases design. in the system of b / s, client realizes a high efficient access to the server database through displaying diversified active controls in browser and using ado to access the data source. the disposing of data accures under the database not in the font of this system. this kind of scheme cannot only bring the system a higher real time response, but also decrease data runoff of the networks, lower the possibility that web server becomes bottleneck of the system and make the system more transplantable

    當前的web數據庫訪問技術正處于發展,針對這種情況,本文通過分析當前各種流行的web數據庫訪問方案的優缺點,結合在三層次的c / s系統中扮演越來越重要的角色的中間件技術,採用了microsoft公司所提出的一致數據訪問技術,利用ado項,結合當前的asp語言,底層數據庫採用了sqlserver7 . 0的存儲過程技術,設計了一種自己的web數據庫訪問方案,即在browser / server系統當中,客戶端通過顯示在瀏覽器中的各種activex項,通過了ado連接數據庫,數據的處理利用了存儲在數據庫內部執行,實現對後端數據庫的高效訪問,並且這種方案在給系統帶來較高的實時響應性能的同時,減少了數據流量,降低了web服務器成為系統瓶頸的可能性,也增強了系統的可移植性。
  2. The author proposes that gater map and net map be used to control project process ; risk chain theory and period control theory are used to analyze risk in erp, pdca method and stoppage tree to control risk during implementation. at the end of this paper, the developping strategy of erp system in our country has been produced

    論文提出運用甘特圖和圖的方法對項目實施進度進行;運用風險鏈理論和理論,對erp項目中的風險進行分析;運用pdca法和故障樹法對可能發生的風險進行
  3. The research results is briefed as follow. ( 1 ) a new communication and decision - making method is presented, which integrated several new tools as well as some old ones ; ( 2 ) a new concept of " virtual communicating place shared in real time by multi - user " is brought forward, and a new technology based on event - driving and message - transferring mechanism is designed to realize graphic data shared by multi - user and displayed synchronously under net environment, which is the basis of the whole system. ( 3 ) a new mechanism for team members to share data efficiently is devised, which supports collaborative working in progress, maintains the consistency of data, records the history of design and etc. by defining a new type of the design data attributes and the privilege of team member to access to data in different time, using a new method of data manipulating, the team data sharing is realized

    本文的主要研究成果為: ( 1 )在研究國內外決策交流方式方法的基礎上,綜合多種方法的優點,提出了一種新的決策交流方式,採用了多種手和工具,完善了決策交流的機; ( 2 )提出了多用戶共享的可視化虛擬交流空間的概念,並對其實現技術進行仔細的分析,針對目前存在的技術難點,提出了可行的解決方案,設計了一種新型的基於事件驅動和消息傳遞機的多用戶實時共享圖形數據的解決方案,並採用了跨平臺的java技術實現了環境下圖形數據的實時交流和顯示; ( 3 )針對團隊協同的cad系統的特點和要求,提出了一種新的團隊數據共享機,通過對產品數據的基本屬性、歷史屬性、共享狀態屬性和關聯屬性的定義,結合對團隊成員在不同設計的權限,採用新型的對共享數據庫的數據操作方法,動態地維護團隊數據的共享、設計的變更、設計進程的同步、關連數據的一致性、以及多個團隊之間的數據交流。
  4. A study on modeling, scheduling and optimal control problems for a class of hybrid manufacturing systems is investigated. in this framework, the discrete entities have a state characterized by a temporal component whose evolution is described by event - driven dynamics and a physical component whose evolution is described by continuous time - driven dynamics, thus it is a typical hybrid system. not only the optimal control for manufacturing process like that discussed in many references but also the optimal machining sequence are considered in this paper. the whole problem is solved by a two - level optimization method : at the inner loop, for any given machining sequence of the jobs, the optimal control for manufacturing process is considered ; while at the outer level, an improved genetic algorithm is used to decide the optimal machining sequence of a batch of jobs to be processed. finally, some examples are given to illustrate the validity of the algorithm

    研究了一類單混合製造系統的建模、分析與調度問題,這類系統既包含離散事件動態,也包含連續時間動態,前者用排隊描述,後者用微分方程描述.不僅考慮了a這類系統的最優問題,而且考慮了工件進入生產線的最優時間,並用一個復雜的優化模型描述,同時給出了一個兩層優化方法,內層給出對給定工件序列的最優,而外層用一改進的遺傳演算法求解工件進入生產線的最優時間序列.若干模擬實例說明了演算法的有效性
  5. For the reasonable planning and construction of the highway network in medium - sized cities, at first, the thesis has compared the condition of china with one of foreign in the construction of highway network and presented the existing problems. in the foundation of the theory and methods of the planning of highway network, a series of principle and methods has been advanced, such as the method linked the method of gross control into 4 - step - forecast method. the thesis has discussed the data the od survey needed and the theory and methods of traffic demand forecast

    本論文從中小城市公建設合理規劃的角度出發,首先將中國的公建設情況與國外進行對比,指出了我國目前在公規劃中所存在的問題,隨后在研究公規劃的理論與方法的基礎上,提出了一系列的原則與方法,如總量與四法相結合的方法等,探討了進行交通調查所需要的數據信息、需求預測的理論與方法以及相關的影響因素。
  6. In this text, control is not argued in general terms, but limited to construction stage only, so, this text has distinct pertinence. and then, the former progress plan is not adjusted from complicated network optimum angle, but control methods are summarized, which are often used in the present construction, so, this text has stronger serviceability and greater actual meanings

    本文不是從一般的泛泛而談,而是僅限於施工的進度,這使得本文具有鮮明的針對性;本文也不是從復雜的優化的角度對原進度計劃進行調整,而是總結了目前施工中用得較多的方法,這又使得本論題具有較強的可操作性,具有較大的實際意義。
  7. According to the problems existed in present pharmaceutical sale system and realize the following aims : ( 1 ) realizing the share of information and timely exchange between enterprises and customers, and shortening commodities provision cycle ; ( 2 ) optimizing enterprises " business process, increasing enterprises " working efficiency and reducing workers " labor load ; ( 3 ) establishing enterprises " efficient information network and making decision - makers master enterprises " operation timely and control it efficiently ; ( 4 ) providing strong auxiliary support for enterprises " operation analysis and decision and making enterprises " decision quick, scientific and effective ; ( 5 ) reasonable classifying customer management, shortening response time, increasing service quality and reducing enterprises " operation cost

    該文章根據目前醫藥銷售系統存在的問題,採用delphi作為技術平臺,開發出適合現醫藥企業的客戶管理系統,實現了以下幾個目標: ( 1 )實現企業與客戶之間信息的共享和及時交換,縮短商品供貨周期。 ( 2 )對企業的業務流程進行全面優化,提高企業辦公效率,降低工作人員的勞動負荷。 ( 3 )建立企業有效的信息,使決策者能夠及時掌握企業的運營,進行有效的
  8. Besides these factors, mere are other factors who can put impression on project investment, such as policy nature disaster, and so on. in order to supply a reasonable theoretical method for construction project investment, it ' s meaningful to study the risks and control model. in this paper, firstly, the writer discusses the measurement guideline and the mam factors during the different project period ; secondly, by studying investment deviation, the writer builds a mathematic model ( neutral networks analytic hierarchy process model ) to control investment risk, at the same time, proves its accuracy by a realistic project ; finally, according to the writer ' s work experience, some common problems during the project are presented

    本文首先探討了建設項目投資的衡量指標,並就不同建設投資的主要因素進行了論述;其次對投資風險進行了研究和分類,提出建設項目需要進行風險識辨和風險偏差分析,通過對偏差類型和偏差原因的探討,以模糊數學神經理論中的層次分析法為基礎,建立了投資風險預測模型,並根據工程實例對建立的投資風險模型進行了驗證,分析表明該模型可以用於實際建設項目投資風險的分析;最後根據作者房地產項目開發投資實踐操作經驗,對投資中容易出現的一些問題進行了探討。
  9. A cac scheme for vbr traffic based on the rate - modified model is presented. in this scheme, the source model is obtained from the source traffic descriptor ( pcr, scr, mbs ) declared by the users at connection setup time and the direct effect of the relative values of the burst length and the buffer space on the cell loss performance is taken into account, which make our scheme be consistent with the standards and improve the resource utilization

    提出了一種基於速率改進模型的vbr業務連接允許,該機所採用的業務模型依賴于用產在呼叫連接建立所提交的業務源流量描述符( pcr , scr , mbs ) , n博士學位論文: atm連接允許的研究並且直接體現了業務突發長度與緩沖區容量之間相對關系對信元丟失性能的影響,從而保持了與現有標準的兼容,並提高了資源利用率。
  10. The method ' s nature is to combine the construction experience with the net work program and in the priority of construction starting and make the alternatives that are possible to influence the finish time, providing a flexible technical preparation for adjusting errors actively later, which will supply a new measurement and insure both the rate of production and timing target accomplishment

    該方法的實質是將施工經驗與技術相結合,對可能影響工期的工程,做出盡可能多的施工方案和計劃,在施工方案的編為以後的方案調整、動態監和調整偏差提供了行之有效的技術準備,為動態施工計劃應用在土建工程中,確保進度、工期目標的實現提供新的手與方法。
分享友人