線隧 的英文怎麼說

中文拼音 [xiànsuì]
線隧 英文
threaded list
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東穿黃洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對洞圍巖應力、變形的影響。
  2. Production line for eyedrops - drying tunnel

    滴眼劑聯動.道烘乾機
  3. Impacts on the locally rare lesser club - footed bat and short - nosed fruit bat have not been fully addressed either. wbased on the above, we find the subject eia report failing to meet the requirements of the eiao tm and respectfully request the director of environmental protection to consider disapproving the captioned eia report

    基於以上各點,世界自然基金會認為上水至落馬洲支線隧道高架橋方案環境影響評估報告未能符合環境影響評估程序的技術備忘錄的要求,故懇請環境保護署署長否決該申請。
  4. Study on blasting seismic dynamic effect for tunnels with close interval in bedded rock mass

    層狀巖體中近鄰雙線隧道爆破的振動響應研究
  5. Wwf hong kong is greatly disappointed by the decision of the environmental protection department to approve the kcrc s sheung shui to lok ma chau spur line environmental impact assessment report. we found the adverse impacts incurred by the spur line project to be environmentally unacceptable, and the eia report failing to meet the requirements of the technical memorandum for the eia process under the eia ordinance because of the following reasons

    世界自然香港基金會簡稱世界自然基金會對環保署批準九廣鐵路的上水至落馬洲支線隧道高架橋方案環境影響評估報告下稱環評報告深表失望,認為支工程會造成不可接受的環境影響,而且環評報告亦未能符合環境影響評估程序的技術備忘錄的要求,因為:
  6. Since the shallow depth excavation is the main factor to cause ground settlement in shenzhen subway tunnel, this paper discusses some corresponding countermeasures including the improvement of ground property, appropriate draining of groundwater, scheduled excavation depth and width, etc, to control strata distortion and surface settlement, and argues that these measures are expected to effectively control surface settlement while constructing city subway in soft ground excavation

    摘要針對深圳地鐵淺埋暗挖道施工中影響地表下降及地層變形的因素,提出了遵循「十八字」原則、改善土體特性、適度排放地下水、根據地層條件選擇施工方法、增大左右線隧道開挖面的距離、合理確定開挖進尺、提高施工效率、加強初期支護、及時施作二次襯砌等對策。
  7. In this article, according to the execution example on arch ring lining crack defect at some certain single - track railway mountain tunnel, a brief introduction is given to the cause of formation, disposal technique and construction points for attention on this kind of defect

    摘要根據某鐵路山嶺單線隧道拱圈襯砌裂縫病害整治施工實例,簡單介紹了病害成因、整治技術及施工注意事項。
  8. The stone falling disease in chengkun railway and its renovation measure by both bridge and tunnel specialties are recommended

    摘要介紹了成昆線隧工點的落石病害以及橋梁與道兩個專業協同設計完成病害整治的情況。
  9. Objection to the kcrc s eia - tunnel viaduct option

    反對上水至落馬洲支線隧道高架橋方案環評報告
  10. A brief description of tunnel defects on wangan line and its treatment

    淺議皖贛線隧道病害及其整治
  11. The change of energy in wall rock is tracked in the whole process and the amount of energy transferred to linings is also evaluated. 5 ) based on the principal of energy invariance and the energy properties of sfrc, a practical design equation that related the thickness of projecting sfrc to the energy related properties of tunnel is given in the end. this equation is then used to design a single - track railway tunnel in iii grade rock condition

    並進一步推導了不同形式的構件間的能量耗散關系,為將標準試驗的能量統計結果運用於實際結構中打下了基礎; 4 )利用有限元軟體對道開挖過程進行了三維模擬,得到了道圍巖在開挖掘進過程中的能量轉化趨勢和規律,得到了鋼纖維噴射混凝土襯砌在支護過程中的能量變化; 5 )利用能量守恆原理和已經推導出的構件能量耗散關系,建立了鋼纖維噴射混凝土襯砌厚度與圍巖開挖能量變化間的關系,並運用此方法對級圍巖條件中的鐵路單線隧道的鋼纖維噴射混凝土襯砌進行了設計計算;
  12. Production line for filling oral liquid - tunnel type sterilizing dryer

    口服液瓶灌裝聯動.道式滅菌乾燥機
  13. We could offer the automatic dust - free painting production line for manufacture, tunnel drying oven line, paint coating production line for metalwork, paint coating production line for glass - work, paint coating production line for woodwork, powder coatingproducte line for metalwork, whole series of painting cabinet, all classes of drying oven, uv light drying, fresh air supply sy - stem, static dust removal equipment, emission 、 waste water control system and net printingproduction equipment, conveying equipment, electronic production equiment etc

    公司專業提供塑膠製品自動無塵塗裝道式烤爐流水,金屬製品噴油生產,玻璃製品噴油生產,木製品噴油生產,金屬製品噴粉生產,全系列噴漆櫃、噴粉房,各類?爐、烘爐, uv光固化機,鮮風供給系統,靜電除塵設備,廢氣、廢水處理系統及絲印生產設備,物流輸送設備,電子生產設備等。
  14. The paper introduces the progress and the statue quo of tunnel portal construction, discusses the condition to employ full face method, bench cut method, single side heading method and double sides heading method of portal construction, points out advantages and disadvantages of these methods. the order to adopt these methods of single track, double track and tri - track tunnel in shallow - depth, uneven pressure and incompact ground is also advised after compare

    討論了全斷面法、臺階法、單側壁導坑法和雙側壁導坑法在道洞口段施工中的使用條件和優缺點,對這四種施工方法從各個方面進行了比選,提出了單、雙和三線隧道的洞口段處于淺埋、偏壓、鬆散的地層中時各種施工方法選擇的先後順序。
  15. Hong kong government route 3 tunnel,

    三號干線隧
  16. Citic pent - ox metropolis business hotel shanghai is a 3 - star standard hotel located on pudong avenue, the heart of lujiazui finance trade zone. the hotel enjoys good transportation link, where there is only 3 minutes from the yan an road tunnel and about 20 minutes walk to the oriental pearl tower

    中信五牛城酒店式公寓是中信集團公司屬下的三星標準涉外酒店,座落於陸家嘴金融貿易中心區域,六快二慢浦東大道上,東西各距延安路雙線隧道和楊浦大橋5分鐘車程,交通快捷便利。
  17. This thesis gets forecasting ground settlement of sk3 + 355 section of shenzhen metro da ~ ke running tunnel after it is completed 6 months, also gets forecasting ground settlement of sk3 + 395 section after it is completed 15 months. finally, the model test data are compared with the site measurement data

    本論文通過多個模型試驗的研究,得到了深圳地鐵大~科區間里程sk3 + 355斷面在道竣工后6個月內地表固結沉降的預測值,也得到了sk3 + 395斷面三孔三線隧道施工引起的沉降和道竣工后15個月內地表固結沉降的預測值。
  18. The gtm admiralty car park is an underground parking facility located below harcourt garden in queensway, admiralty, opposite pacific place. it has two entrances, one at rodney street and one at harcourt road, as well as a single exit onto harcourt road

    Gtm金鐘停車場位於太古廣場對面的夏愨花園下,分樂禮街及夏愨道兩座,以兩線隧道連接,共有520個車位, 24小時運作。
  19. Effect of blast in double line tunnel on existing tunnel

    線隧道施工爆破對既有道的影響分析
  20. On top of that, the mtr island line tunnel and other infrastructural facilities are already underground. therefore, it is impossible to build the bypass on existing land

    但由於現時中環大廈林立,地底已有地鐵港島線隧道及其他基建設施,中環灣仔繞道不可能在現有的土地上興建。
分享友人