緩沖故障 的英文怎麼說

中文拼音 [huǎnchōngzhàng]
緩沖故障 英文
buffer spring
  • : Ⅰ形容詞1 (遲; 慢) slow; unhurried 2 (緩和; 不緊張) not tense; relaxed Ⅱ動詞1 (延緩; 推遲) d...
  • : Ⅰ名詞1 (事故) event; incident; happening; accident 2 (原因) cause; reason 3 (朋友; 友情) fr...
  • : Ⅰ動詞(阻隔; 遮擋) block; hinder; obstruct Ⅱ名詞(遮擋物) barrier; block; obstacle
  • 故障 : hitch; breakdown; stoppage; fault; faulting; accident; blunder; bug; conk; failure; impairment; i...
  1. If the car comes off the track because the driver has misjudged a braking point or is struggling with a technical fault, the run - off zone acts as a sort of emergency brake

    如果一輛賽車因為車手錯誤判斷了剎車點或者遭遇了技術上的出了賽道,區就扮演了類似緊急剎車的作用。
  2. When the data of logistics in current process are used for input of simulating logistics in future 100 % continuous casting process, supply of hot metal from iron - making process may not satisfy the needs of 100 % continuous casting on raw materials. because planning scheme in continuous casting process depends greatly on smelting scheme in convertor vessel, it is important for operator to balance raw materials supply, smelting and casting in order to realize the scheme of 100 % continuous casting. when some equipment are work abnormally, mixer of hot metal and lf furnace can be used for logistics buffer

    用攀鋼煉鋼生產數據對模擬軟體系統進行的測試和模擬研究結果表明:模擬系統的隨機數發生演算法可以實現對作業時間的依分佈隨機抽取;在相似的輸入條件下,模擬結果與實際生產物流的時間分佈規律基本吻合,達到了模擬軟體設計的預期目標;若以攀鋼提釩煉鋼廠現工藝的鐵水輸入作為全連鑄后的輸入條件,則現工藝的物料供應能力可能難以滿足全連鑄生產的要求;連鑄機的連澆計劃對轉爐爐次計劃的編制有很高的要求,合理安排來料、煉鋼與澆鑄三者間的物流平衡關系將是保證全連鑄作業的重要條件;當出現設備異常情況時,可以利用混鐵爐與lf爐站前等待作為物流池,通過延長系統的平均物流時間來解因設備檢修和等擾動所造成的影響,確保生產的順利進行。
  3. We can ration analyze and estimate hardware configure chosen in design such as machine tool, the capacity of buffer, the route of transport system etc, and personnel deployment of product line. we can forecast the produce cycle of product, analyze and forecast produce capacity of work - flow, simulate all kinds of predictable or random malfunction, finding bottleneck of system etc. we can also forecast the capability of work - flow under different scheduling strategy

    通過對流水線的模擬,我們可以對各種設計方案進行評估,可以定量分析與評價設計中所確定的硬體配置(如機床、庫容量、運輸系統路徑等)及生產線人員配備情況,預測產品生產周期,分析與預測生產線的生產能力,模擬各種可預見的或隨機的,發現系統瓶頸等。
分享友人