總裝線 的英文怎麼說

中文拼音 [zǒngzhuāngxiàn]
總裝線 英文
final assembly line
  • : Ⅰ動詞(總括; 匯集) assemble; gather; put together; sum up Ⅱ形容詞1 (全部的; 全面的) general; o...
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  1. Each also spends time performing routine tasks on an assembly line.

    每個人還花一定時間在總裝線上從事常規作業。
  2. There was the episode during the 1970 recession when takahashi shifted assembly-line workers to door-to-door selling to bring down inventory and cut costs.

    在1970年經濟蕭條時期,有一個小插曲:為了減少庫存和降低成本,高橋把總裝線的工人調去挨門挨戶地搞銷售工作。
  3. The company has intact technology in making production, such as mould making, mould plastic, spray - paint, glassmaking, extractive manufacture, and assemble and owns many patent rights

    主要生產設備注塑機和塗流水,具備完整的制模注塑噴漆制玻璃精工製造等生產工藝,擁有多項產品專利權。
  4. You might wonder if the surge protector installed at the service entrance would also protect equipment within the facility

    你可能想知道安端的電涌保護器是否也會保護建築內的設備。
  5. The entire rotating assembly shall be designed with sufficient rigidity and balanced to provide for a maximum shaft deflection at the lower seal of 0. 002 " under all operating points between plus or minus 40 % of the flow at best efficiency point ( bef ) on the pump ' s performance curve

    整個旋轉都應該具有足夠的硬度,在泵性能曲最好性能的正負40 %的范圍內,在所有工作點,最大的軸偏差限制在0 . 002英寸內。
  6. The wages of assembly - line workers and machine operators are included in this cost classification

    總裝線上的工人工資和機器操作人員的工資包括在內。
  7. Solve product quality problems in assembly / coating production line

    及時解決噴塑流水生產中的產品質量問題。
  8. Shipment to be effected by american president line

    被美國的招致的船。
  9. On installation of residual current operated protective devices at the general incoming line of residence

    住宅處漏電斷路器的
  10. The detailed examples are also given to illustrate the flow of single kanban system between packaging line and warehouse and dual kanban system between final assembly line and feeder line. finally, the kanban rules and comparison between single kanban and dual kanban are discussed from the practical point of view the calculation of number of kanban is presented quantitatively

    分析在生產輔助各工序之間的物流和單、雙向看板;並通過詳盡的事例及圖解闡述打包和倉庫之間的單向看板流程和總裝線與生產輔助之間的雙向看板系統;最後,從實際觀點出發來討論單向及雙向看板之間的規則和比較。
  11. The planning and development of quality control system of automobile assembly

    轎車總裝線質量檢測系統的規劃與開發
  12. With the refrigeration equipment industry as the background, xi " an qingan refrigeration equipment co. ltd as the research object, lean production management as the fundamental theory, this article is to analyze the current conditions and problems in the organizational pattern of assembly line, ways of purchasing materials, storage and production management information system in xi " an qingan refrigeration equipment co. ltd, to discuss the adaptability, feasibility and applied condition of lean production management, to compare the production, purchase, storage and production management information system before and after lean production management is adopted and the different effects, to pose efficient methods of purchase, production and storage which have been proved effective and feasible, to research method and experience attained during the application of lean production management, to offer proposition and assumption to apply lean production management, and to reach the conclusion that to enhance competitive ability the application of lean production management is the inevitable choice of the xi ' an qingan refrigeration equipment co. ltd

    本文以空調製冷和壓縮機行業為研究背景,以「慶安製冷」公司為研究對象,運用精細生產管理的基本理論,對「慶安製冷」公司空調壓縮機多品種中小批量的流水生產組織模式、采購模式、庫存模式和生產管理信息系統中的管理現狀及存在問題進行了分析,探討了精細生產管理模式在「慶安製冷」公司應用的適應性、可行性和應用條件,對比分析了公司開展精細生產管理前後生產組織、采購、庫存、生產管理信息系統取得的成效,提出了公司的采購過程模型,零部件最優庫存控制模型,並經實踐驗證有效可行。文章研究分析了公司車間開展精細生產管理的思路、方法和經驗,並對公司未來運用精細生產管理方式提出了改進建議和設想。文章得出的結論是:應用精細生產管理方式是「慶安製冷」公司提升競爭力的必然選擇。
  13. Research on dynamic planning amp; simulation optimization of mixed model general automobile assembly lines

    混流轎車的動態規劃與模擬優化研究
  14. Gaobazhou water conservancy project is the most downstream hydropower station in the 3 cascade development qingjiang mainstream, total installed capacity 252mw, total reservoir capacity 430 million - m3, maximum dam height 57m, length of dam axis 439. 5m, total static investment rmb 623. 48 million ( 1998 price )

    高壩洲水利樞紐是清江流域三級水電站的最下游一級水電站,電站機容量252mw ,庫容4 . 3億m ~ 3 ,最大壩高57m ,壩軸長439 . 5m ,靜態投資( 1988年價格) 62348萬元。
  15. In some cases, it refers to the total installed capacity ( rather than lines in service )

    在某些情況下,它指的是機容量(而不是開通數) 。
  16. Embraer takes a shareholding of 51 % of registered capital and chinese party takes a shareholding of 49 % of registered capital ; its place of business is at no. 1 general section, yantai road, high tech development zone, pingfang district, harbin, china, factory building covers an area of 24000 square meters ; scope of business is to manufacture world famous 30 to 50 seats regional jet airplane erj145 family in china, including final assembly, selling to domestic markets and provide all - round customer support and after - sales service

    巴航占注冊資本的51 % ,中方占注冊資本的49 % ;地址設在哈爾濱市平房經濟技術開發區煙臺路集中區1號,廠房佔地面積24000平方米;經營范圍是在中國生產目前暢銷世界的30至50座支噴氣客機erj145系列,包括該系列飛機的,向國內市場的銷售,並提供全方位的用戶支援及售後服務。
  17. In the automobile type and logistics information publication system, information of automobile type and parts to be assembled can be displayed on terminals set on each station, which enables ship - fitters know the car flow on the assembly line and make preparations for assembly work. the system also allows workers to send out material requirement message so that logistics department could response to the message and deliver the material to right place in proper time and by proper amount, which converts the traditional " push " mode material supply method to demand drive " pull " mode

    本文研究的車型及物流信息發布系統可以在工位實時、動態地顯示總裝線上各工位的車型信息和零件選信息,使配人員及時了解總裝線車流情況,提前做好配準備;允許配人員通過鍵盤提交物料需求信息;物料供應部門可以實時響應配工位的物料請求,將物料及時、適量地送到合適的位置。
  18. The washer always installs wiring a jiao

    洗衣機總裝線一角
  19. Airbus said an initial feasibility study had identified the northern port city of tianjin for the assembly line , which would be aimed exclusively at the chinese market

    空客表示,一項初步的可行性研究已確定,將總裝線放在中國北方的港口城市天津,專門面向中國市場。
  20. Workman on fab supplement a new product which was puiled from upriver supply station fill in taken product, the upriver supply station pull a new product from furthermore upriver supply station

    總裝線上的人員從上游的供給站補充一個新產品,來填補取走的產品空缺,上游的供給站向更上一級供給站拉出新的產品,狗屎。
分享友人