考迭爾 的英文怎麼說

中文拼音 [kǎodiěěr]
考迭爾 英文
caudiel
  • : Ⅰ動詞1 (考試; 考問) examine; give [take] an examination test or quiz 2 (檢查) check; inspect3...
  • : Ⅰ動詞(輪流; 替換) alternate; change Ⅱ副詞1 (屢次) repeatedly; again and again 2 (及) in tim...
  • : [書面語]Ⅰ代詞1 (你) you 2 (如此; 這樣) like that; so 3 (那;這) that Ⅱ[形容詞后綴: 率爾而對 ...
  1. Consequently, on the basis of non - winkler foundation model, a finite - element method that utilizes foundation flexibility matrix into iterative calculation is proposed in this paper originated from the item " the optimal design theory and research of pile capping beam " sponsored by natural science fund of hunan province, which the continuity of soil mass can be accounted for under various boundary conditions, different loadings and irregular beam characters

    本文結合湖南省自然科學基金項目「樁基承臺梁優化設計理論與方法研究」 ,針對非文克地基(半空間、線性變形層或單向壓縮層地基模型等)上的樁基承臺梁,提出一種利用地基柔度矩陣來進行代的有限單元法,可充分慮梁下土體的連續性,並對基礎與土體脫開、承臺梁截面變化、梁體邊界條件復雜、上部荷載類型變化以及梁下基樁承載力差異等情況進行分析計算。
  2. Combining with the performances of danshan bridge, discussing the methods on the construction controlling and calculation of cable - stayed bridge, this paper raises an efficient construction controlling system, and realizes collecting construction data of the real bridge and technical information. by analyzing on the difference of theoretical calculation and real construction state, the author determines to take self - adapting construction controlling method which uses kalman filter method to identify and adjust construction parameters. by getting rational construction state from forward iteration method, this paper, taking concrete creep effect in consideration, raises a rational scheme to pre - remain deformation and adjust cable force

    結合丹山橋的結構特點,通過對斜拉橋施工控制及結構計算方法的探討,提出了有效的施工控制系統,實現了對實橋施工數據和技術信息的採集;通過分析理論計算與實際施工狀態的差異,確定了以卡曼濾波法作為施工參數識別與調整的自適應施工控制方法;通過正裝代法確定其合理施工狀態,並慮混凝土的徐變效應,提出了合理的預留拱度和索力調整方案。
分享友人