耐高溫模型 的英文怎麼說

中文拼音 [nàigāowēnxíng]
耐高溫模型 英文
refractory cast
  • : 動詞(受得住; 禁得起) be able to bear or endure
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : Ⅰ形容詞(不冷不熱) warm; lukewarm; hot; gentle; mild Ⅱ名詞1 (溫度) temperature 2 (瘟) acute ...
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • 高溫 : high temperature; elevated temperature; hyperthermia; megatemperature; inferno
  • 模型 : 1 (仿製實物) model; pattern 2 (制砂型的工具) mould; pattern3 (模子) model set; mould patter...
  1. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用壓水流沖毛技術,大大提了施工工效,減少了倉面污染;板工程大量採用定板施工技術,提了壩體混凝土成質量和工程進度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採用永久性免拆金屬板網作為一期混凝土板;鋼筋連接改進傳統的電焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提了接頭強度和鋼筋連接速度,施工安全性大大加強,質量穩定性有效提,經濟成本大大降低;三峽二期工程持續強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土控綜合技術的應用,有效降低了壩體混凝土度的產生;混凝土表面處理及裂縫處理技術的應用,提了建築物的整體性和久性。
  2. New five - stage cyclone pre - heater system, high efficiency air girder grate cooler, multi - passage pulverized coal burner, davison heat temperature fan, luqi bs930 electrical dust collector, as well as chain - board elevator, chain conveyor adopted in this production line can ensure that the technology is advanced compared to other production lines with the same scale

    如新五級旋風預熱預分解系統、效空氣梁篦冷機,節能多通道噴煤管,戴維森風機,魯奇最新技術生產的電收塵( bs930 )等,輸送設備採用了用、節電的板鏈提升機、鏈式輸送機,將使本工程的裝備在同規生產線中處于領先水平。
  3. Research on constitutive model of elastic creep damage of heat resistant steel under the condition of high temperature and high pressure

    壓用熱鋼彈性蠕變損傷本構研究
  4. Through the investigation research on practical damaged element, considering the effect of corrosion, high temperature, wet environment, damage ( crack ) on structural durability, bearing capacity. this paper established the reliability analysis method of large - scale industrial factory, and applied the fuzzy mathematics to establish the factor set and weight coefficient set on the basis of expert experience. an analyzed method for fuzzy evaluation of structural element and bent frame structure system reliability is put forward

    通過對實際結構破損構件的調查,考慮腐蝕,,環境潮濕,破損(裂縫)等因素對結構久性、承載力的影響,論文建立了大工業廠房可靠度的計算方法,利用專家經驗和糊數學方法建立了糊評價的因素集和權重集,對鋼筋砼結構構件和廠房排架結構體系進行了糊評價。
  5. Methods of test for dense shaped refractory products - determination of modulus of rupture at elevated temperatures

    密實火製品的試驗方法.下斷裂數的測定
  6. Aerospace series. connectors, electrical, circular, coupled by threaded ring, fire - resistant or non fire - resistant, operating temperatures 175 degrees celsius continuous, 200 degrees celsius continuous, 260 degrees celsius peak. part 011 : dummy receptacle. product standard

    航空航天系列.連續使用度175 200最達260用螺紋環連接火或非火的圓形電連接器。 011部分:插座.產品標準
  7. Chamber is made by glass fiber reinforced plastic with whole mould, it is resistant to corrosion, high temperature and collision, easy to clean

    內外玻璃鋼整體壓成酸堿腐蝕,碰撞,易清洗。
  8. Methods of test for dense shaped refractory products. part 7 : determination of modulus of rupture at elevated temperatures

    緻密異火產品的試驗方法.第7部分:時破裂數的測定
分享友人