耳軸 的英文怎麼說

中文拼音 [ěrzhóu]
耳軸 英文
trunnion
  • : Ⅰ名詞1 (耳朵) ear 2 (形狀象耳朵的東西) any ear like thing; ear of a utensil 3 (位置在兩旁的...
  • : 軸Ⅰ名詞1. (圓柱形的零件) axle; shaft 2. (對稱部分的直線) axis 3. (圓柱形的纏繞器物) roller; spool Ⅱ量詞(用於纏在軸上的線以及裝裱帶軸子的字畫)
  1. Pressure-compensated air bearings are used on both ends of the trunnion axis.

    耳軸兩端各用一壓力補償空氣承。
  2. The trunnion assembly is supported by air bearings at the end of each arm and is held in position by brake shoes at each bearings.

    耳軸組件的支承是每根臂末端的空氣承,承上的閘瓦起定位作用。
  3. Rolling stock. articulations with gudgeon. inner and outer steel rings types aeg, lag

    鐵路車輛.耳軸聯接. aeg , lag型鋼制內環和外環
  4. Rolling stock. articulations with clevis and tenon and with gudgeon. inner steel rings type as, ag

    鐵路車輛.帶u形環和榫的耳軸聯接. ,型鋼制內環
  5. The trunnion sprocket has come off the pinion, but don ' t worry - we ' ll soon but that right

    耳軸鏈齒脫離齒輪,不過不要緊? ?我們馬上可以修好。
  6. The setting up on gun position uses double row showing, and up row is the direction of fire and angle of fire that terminal set has provided, down row is the angle that coder on the undercarriage has measured when gun layer attached to the trunnions while operating, when double row data consistent, stop operation and finish supervise and control

    在炮位上的設置採用雙排顯示,上排即為終端機提供的射角和射向,下排則為瞄準手操作過程中固定於耳軸、下架基部位的編碼器所測得的獲得角。當兩排數據一致時停止操作,完成監控。
  7. The company produces two kinds of repairing materials for converter lining. one is gunning material for converter crown, trunnion and slag line and the other is repairing materials for two large working faces in the converter. they are the best gunning materials for converter ' s maintenance and repairing

    本公司生產二種轉爐爐襯用修補料,一種是用於爐帽、耳軸、渣線的噴補料,一種是用於兩個大面的修補料,是轉爐維護和投補用的最佳材料。
  8. After gained the key data on cant of trunnions etc, gun terminal set will finish the count automatically on loading data and transmitting to the showing system of the gun position

    在獲得耳軸傾斜角等關鍵數據后,火炮終端機將自動完成裝定諸元的計算並傳送到炮位顯示系統。
  9. And we analyzed the effect of the big gun erect axis incline trunnion axis is out of the vertical of the erect axis and the big gun axis is out of the vertical of the erect axis to measuring accuracy

    對矢量轉公式進行了推導,並利用它計算出了火炮豎傾斜、炮耳軸與豎不垂直、炮膛線和炮耳軸不垂直三種誤差對測量精度的影響。
  10. Repairing technical requirement for special equipment of cutter suction dredgers part 2 : trunnion of suction ladder

    絞吸挖泥船專用設備修理技術要求第2部分:絞刀架耳軸
  11. Shipbuilding and marine structures ; trunnion pieces for span bearings and lead block bearings ; identical with iso 8314, edition 1987

    造船和海上結構.跨架承和導向支承承的耳軸
  12. The particular signals of different type of bearings are also decided for the experimental research. 3 ) at last, the evaluating method of bearings ’ remain service life is put forward towards converter trunnion bearing and the slewing bearing of rotary column. the result accords with fact basically

    3 )在以上研究基礎上,提出了對轉爐耳軸徑向承和鋼包旋轉塔回轉支承這兩類低速重載滾動承的剩餘壽命評估基本方法,結果較符合實際。
  13. The working process of the bearing with low speed and high load ( converter trunnion bearing ) is monitored through vibration method and lots of field data are obtained. a industrial micro computer diagnosing system has been constructed for the detection of the defects of trunnion bearings

    本文敘述了轉爐耳軸承故障診斷的必要性,對低速重載承故障的類型和特性進行了分析,採用振動監測法對一種低速重載承- -轉爐耳軸承的運行進行監測。
  14. Mobile waste containers - containers with 4 wheels with capacity up to 1 300 l with flat lid, for trunnion and or comb lifting devices - dimensions and design

    移動式廢品箱.耳軸式和或梳形提升裝置用容積為1300升及以下的帶平蓋的4輪廢品箱.尺寸和設計
  15. Mobile waste containers - containers with 4 wheels with capacity up to 1 300 l with dome lid, for trunnion and or comb lifting devices - dimensions and design

    移動式廢品箱.耳軸式和或梳形提升裝置用容積為1300升及以下的帶圓頂蓋的4輪廢品箱.尺寸和設計
  16. Mobile waste containers - part 2 : containers with 4 wheels with a capacity up to 1300 l with flat lid, for trunnion and or comb lifting devices - dimensions and design

    移動式廢料箱.第2部分:耳軸式和或梳形提升裝置用容積為1300l及以下帶平頂蓋的四輪箱.尺寸和設計
  17. Mobile waste containers - part 3 : containers with 4 wheels with a capacity up to 1300 l with dome lid, for trunnion and or comb lifting devices - dimensions and design

    移動式廢料箱.第3部分:耳軸式和或梳形提升裝置用容積為1300l及以下帶圓頂蓋的四輪箱.尺寸和設計
  18. Mobile waste containers - containers with 4 wheels with capacity up to 1 700 l with flat lid, for wide trunnion or bg - and or wide comb lifting devices - dimensions and design

    移動式廢品箱.寬耳軸式或bg和或寬梳形提升裝置用容積為1700升及以下的帶平蓋的4輪廢品箱.尺寸和設計
  19. Railway transport equipment. clevis and tenon joints. rotating pins type ts and adjusting ring type a

    鐵路運輸設備.頸和外殼的聯接.旋磚耳軸ts型和調節環a型
  20. Lifting devices for refuse collection. part 2 : technical specifications and safety requirements concerning trunnion lifting devices used for mobile waste containers with capacities from 500 l to 1 300 l

    垃圾收集用提升設備.第2部分:容量500 - 1300升的移動廢料容器用耳軸式提升設備的技術規范和安全要求
分享友人