自動變電所 的英文怎麼說
中文拼音 [zìdòngbiàndiànsuǒ]
自動變電所
英文
automatic substation-
Aiming at the problem that existence in the monitoring of simulate disk in local power grid, to enhance the level and efficiency of the electricity dispatch, to improve operation procedures, to change the troublesome work about 6kv line simulation disk, 35kv transformer substation and 6kv substation host cording diagram revision and maintenance from man - power, manual promotion to direct - viewing, real - time and work flow high automation level
針對地方電網「模擬盤」監視中存在的問題,為提高電力調度工作水平和效率,完善操作規程,把煩瑣的6kv線路模擬盤、 35kv變電所和6kv配電所主結線圖的修改和維護工作從人工、手動提升到直觀、實時和工作流程高度自動化水平,實現電力調度日報、月報及日常管理實現規范化、自動化。According to the features of local substation, such as large - scale network and points, scatter distribution, old - fashioned equipment, much information and complex communication network, it has great economic benefit to search for a kind of comprehensive automation equipment which has less investment, higher efficient and convenient and reliable character, at the same time, the equipment should adapt to the environment of local substation
根據小區變電所網點多、布局分散、設備陳舊、信息量大、通信網路復雜的特點,尋求一種投資少、見效快、方便可靠的適合小區變電所的綜合自動化設備就具有十分巨大的經濟效益。本文介紹了「配電變電站自動化及其裝置? ?網路儀表」的設計方案。Practice of traction substation combined automation system of shanghai metro line no
淺議上海軌道交通9號線牽引降壓變電所綜合自動化系統的實現及其主要功能Standard communication delivery time performance requirements for electric power substation automation
電力變電所自動化用標準通訊傳輸時間性能要求Fuzzy pid control algorithm is applied to its controller, the reference parameters that mcu needs during operation are gotten by matlab simulation, then automatic current - transformation method is adopted to intelligently charge accumulators
控制器的控制演算法採用了模糊pid技術,通過matlab模擬得出單片機運行所需要的參考參數,再通過自動變流法對蓄電池進行智能充電。Abstract : this chapter discusses the main problems of the cd - ni battery operating in substation , and introduces the technique project of microcomputer auto - charge and discharge , and illuminates its applying foreground
文摘:本文討論了變電所中鎘鎳電池在運行中存在的主要問題,介紹了採用微電腦自動充放電技術方案,說明了該技術的推廣前景。Vacuum breaker with adequate quality and long maintenance intervals are selected. further more, integrative automation of substation is the key factor in substation without watch - keeper. in the secondary design, we adopt layered and distributed configuration, install relay equipment with microcomputer, df1700 intelligent remote control equipment and other automatic equipment, and realize integrative automation of substation
本變電所的二次系統設計中採用分層分散式系統結構,利用南瑞繼保電氣公司的微機型繼電保護裝置及df1700分散式電站自動化系統,經過功能組合和優化設計,對變電所執行自動監視、測量、控制和協調。In the experiment system, the embedded real - time system is used to realize the communication management device
在實驗系統中,牽引變電所綜合自動化系統內的通信管理裝置利用嵌入式實時系統編程實現。Secondly, the communication information between ias and psmis is discussed. and the different purposes of these information are discussed
其次,本文對牽引變電所綜合自動化系統與牽引供電運營管理信息系統的交換信息內容進行了討論並對各類信息的交換目的進行了闡述。Finally, some program and experiments are carried out for an experiment system consisted of two sets of ias and one set of communication sub - system in psmis
最後,本文對一個由兩套牽引變電所綜合自動化系統和一套牽引供電運營管理信息系統的通信子系統組成的實驗系統完成了編程並進行了實驗。So, the demand and the structure of the communication network in ias are discussed firstly. then the channel and the structure of the network from ias to psmis are analyzed
因此,本文首先討論了牽引變電所綜合自動化系統的通信網路要求和網路結構以及綜合自動化系統與管理信息系統信息交換的通信通道和網路結構。More than two years of application of the designed system has shown that the apparatus has stable performance, satisfies site requirements and facilitates better automatic management and on - line equipment maintenance in traction substations
兩年多的運行情況表明,該裝置工作性能穩定,滿足現場生產要求,為牽引變電所電氣設備實施狀態檢修和管理自動化創造了必要條件。Previously, all information of substation automation system was sent to the control center. the control center only cares daily operation and handles fault, but does n ' t do the work such as equipment diagnoses and protective operation analysis
以前,牽引變電所自動化系統將保護信息和錄波信息全部送往調度中心,但調度中心只關心日常操作和事故處理,而不用錄波數據和其它信息進行保護動作行為分析和設備診斷之類的工作。Setting calculation of auto - input equipment of reserve power supply in 66 kv xinyang substation
新陽變電所備用電源自動投入裝置的整定計算Dc control power system, which plays an important role of traction power substation, is expected to be with the characters of higher reliability, automation, precision, smaller figure and maintenance - free while the technique and management of electric railway develop rapidly
直流控制電源系統是牽引變電所的重要組成部分,隨著鐵道電氣化技術及運營管理的發展,對直流控制電源系統提出了更高的要求,具備高可靠、小型化、自動化、高精度、免維護等特徵的直流電源已倍受關注和期待。The combined substation whose technology is more mature gradually has replaced the substation of residential area and commercial service system. the combined substation has received the affirmation from users for its advantage of little occupancy, quick installation, convenient movement and little investment. so its automation level reflects distribution automation level directly
居民小區和商服系統的變電所,已逐步被技術更成熟的箱式變電站所代替,它以其佔地少、安裝迅速、移動方便、投資少等優點受到社會的肯定,因此箱式變電站的自動化程度的高低,直接反映了配電自動化的水平。Foldershare keeps important files at your fingertips - anywhere. all file changes are automatically synchronized between linked computers, so you always access the latest files
重要的文件自動變化與電腦同步連接,所以你可以總是獲取最新的檔案。With the development of electric power industry, the complexity of electric network and the rank of voltage have been increasing constantly. thus, the integrated automation and unmanned operation have become the directions of further development
隨著電力工業的發展,電網復雜程度和電壓等級不斷提高,變電所實現綜合自動化和無人值班已成為電力系統自動化的發展方向。Our design is an intelligent produce which uses electric remote equipment, it can take the place of some relay protection and is used in the substation below 35kv, it correct the trouble which is caused by compact model structure
本論文設計的電力調度自動化系統採用的電力遠動裝置是一種計算機智能化產品,對35kv以下的變電所可以取代部分繼電保護的功能。This paper analyzed the principle of voltage and reactive power automatic control and presented the strategy of automatic voltage control
本文分析變電所電壓無功自動控制的原理,給出了以保證母線電壓和提高功率因數為目標的電壓無功自動控制策略。分享友人