荷載當量 的英文怎麼說

中文拼音 [zǎidāngliáng]
荷載當量 英文
load equivalent
  • : 荷名詞(蓮) lotus
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 當Ⅰ形容詞(相稱) equal Ⅱ動詞1 (擔任; 充當) work as; serve as; be 2 (承當; 承受) bear; accept...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  1. 3 flexible liposome constituted with pc + dona were exhibited under transmission electron microscopy. 4 pfg - nmr analysis indicated that the use of 25 : 1 of tween - 20 : ( - ) c, most of it ( > 90 % ) has been incorporated in the tween - 20 micelle structures

    4 、以pnnmr分析了膠束體帥)結構對卜幾類物質的,發現t een一20使用為兒茶素卜)的50倍時,絕大部分卜) c ( 90以上)己嵌禾在tween 20形成的膠束體( 。
  2. The paper is based on innumerable practical heavy - load road data, deliberate heavy - load standard in detail through theoretical arithmetic, and bring heavy - load standard about cement concrete pavement and asphalt concrete pavement separately ; in the meantime, through a large quantity of cement concrete pavement stress calculation, the paper puts forward relation expression between load on concrete board and stress level under board ; meanwhile, the paper puts forward traffic classification about cement concrete pavement and asphalt concrete pavement ; through bearing board testing on each structure sheaf the paper finds the material modulus gets modified ; through comparing position equivalent rebound modulus to theoretical equivalent rebound modulus, the paper points out limitation of nomograph in course of cement concrete pavement design, whereby, puts forward modifier formulas about theoretical equivalent modulus

    本文以大的重道路資料為主,從實際出發,結合理論計算,對重標準進行了詳細的討論,分別給出了水泥混凝土路面與瀝青混凝土路面的重標準了;同時,通過大的水泥混凝土板底應力計算,推導出了混凝土面板與板底應力水平的關系式;給出了水泥混凝土路面與瀝青混凝土路面的交通分級;通過對試驗路各結構層進行承板測試,發現現有材料模較以前有了明顯的提高;對比現場實測的回彈模與理論回彈模,指出現有水泥路面設計中的諾謨圖不能完全符合現有道路材料,從而提出了對理論模的修正公式。
  3. 2 ) the structure elements should be laid out symmetrically and uniformly when designing steeve - arch structure, what ' s more, the reasonable selection of section geometric size near the arch foots of first beams is paid attention to and the arrangement difficulties of steel bar due to the big eccentric pressures 2, the analyses of anti - seismic features on transverse direction of the aqueduct l ) the method of adjusting the elements " mass can be harnessed in order to even the layout of seismic loads

    2 )設計吊桿式拱架支承結構時,各部分構件應均勻對稱布置。另外,還應注意頭道梁拱腳附近截面的尺寸擬定,克服地震內力造成的大偏心受壓狀態給結構配筋設計增加的困難。 2 、橫槽向抗震性能分析1 )可利用調整構件質的方法,使得結構的某些構件的地震分佈均勻一些。
  4. But during the 1994 northridge earthquke and 1995 hyogoken - nanbu earthquke, many steel beani - to - column connections were damaged which indicated that cognition on the capacity of this type of joints was rather inadequate. in order to avoid similar damages in the future, analysis on response of beam - to - column connections under cyclic loads is not only significant from the theoretical aspect, but also important in practice

    然而, 1994年美國northridge地震和1995年日本的阪神地震中,大鋼框架樑柱連接發生破壞,顯示出人們對于剛性樑柱連接的受力性能和破壞機理認識還相不足。為了避免人員傷亡和經濟損失,對鋼框架樑柱連接研究其在循環作用下的反應,不僅具有重要的理論意義,更具有重大的工程實用價值。
  5. The explosive charge carried in the warhead of a missile

    導彈有效導彈彈頭所帶的炸藥
  6. In chapter 3, the subgrid eddy - viscosity model for large eddy simulation is applied to calculate the three dimensions unsteady periodic turbulent flow in yantan francis turbine. the pulsating characteristics of some main physical parameters in flow field are found. the calculated axial water thrust of hydraulic turbine agrees with the model - test value

    第三章採用大渦模擬亞格子渦粘模型,對巖灘混流式水輪機的流場進行三維非定常湍流分析,得到了流場中各物理的脈動特性,計算出ms的軸向水推力與模型試驗值大小相;同時論證了對于下機架承重的混流式水輪發電機組可採用其推力軸承負作為水電站廠房振動的最大垂直激振
  7. Using the complex potential method in the plane theory of elasticity of an anisotropic body, a series solution to the stress field of a finite plate containing multiple cracks subjected to arbitrary loads is obtained by means of the faber series expansion, and the stress intensity factors at the crack tips are calculated based on the theories of fracture mechanics. equivalence yield stress is introduced in order to consider the effects of the plastic zones, with which the strip yield criteria is developed in the article so that the effects of structural size and the crack interactions on the stress distribution can be considered accurately. the effects of plate size, crack size and crack distributions on the stress intensity factors as well as the residual strength of the plate are studied detailedly

    採用各向異性體平面彈性理論中的復勢方法,以faber級數為工具,得到了含多裂紋有限大板在任意作用下應力場的級數解,並應用斷裂力學方法確定裂紋尖端的應力強度因子;引入屈服應力考慮裂尖塑性區的影響,提出基於帶屈服準則的剩餘強度分析模型,能夠充分考慮結構尺寸和裂紋之間相互作用對應力場的影響;通過數值計算詳細討論了結構尺寸和裂紋之間位置關系對應力強度因子和結構剩餘強度的影響規律,得到了一系列對工程應用具有實用價值的結論。
  8. When the transportation load is long - term evenly distributed, the influences of each relevant factor, i. e. pipeline depth, diameter, deformation module of foundation, poisson ratio of soil and tyre pressure of vehicles, toward mises stress and vertical displacement of pipelines are discussed. when the transportation load is movable and invariable, the changing rules of mises stress and vertical displacement during the vehicle ' s movement are calculated and analyzed, and effects of vehicle velocity and tyre pressure toward these two mechanical characteristics are discussed. when the transportation load is stable and simple harmonic, the changing rules of mises stress and vertical displacement during the time of load function are calculated and analyzed, and effects of vehicle velocity and tyre pressure toward these two mechanical characteristics are also discussed. in three - dimensional analysis, mises stress and vertical displacement of pipelines under three kinds of transportation loads are calculated, and the analysis and discussion of correlative factors are also made

    交通為長期均布時,討論了各相關因素,包括管道埋深、管徑、地基變形模、地基泊松比和車輛輪壓大小分別對管道mises應力和豎向位移的影響;交通為移動恆時,計算並分析了車輛行駛過程中管道mises應力和豎向位移的變化規律,討論了車速和車輛輪壓對這兩個管道力學性狀的影響;交通為穩態簡諧時,計算並分析了作用時間內管道mises應力和豎向位移的變化規律,討論了車速和車輛輪壓對管道力學性狀的影響。
  9. As a result of the simplified torsion moment of inertia, integral stability coefficients based on the gb50017 code increase relatively 5 % or 0. 01 ~ 0. 04 absolutely, only for hn behind hn400 150, whose calculation length goes beyond the limit of 8 meters, taking account of any load condition and any yield - point

    Gb50017梁的整體穩定系數公式的誤差是由扭轉慣性矩的簡化造成。任何情況和鋼號,規格大於hn400 150的hn型鋼,計算長度大於8米時,整體穩定系數偏高約5 ,絕對偏高在0 . 01 0 . 04范圍。
  10. ( 3 ) the equivalent stress, which is from the coefficients for the spectrum - loads and miner linear accumulated damage rule, an approach for material probabilistic fatigue strength for spectrum loads is suggested. this approach are established by the composed of p - c - s - n curves for extreme maximum model

    ( 3 )根據譜系數和miner線性累積損傷準則得到的譜下的應力的關系,與極大值模型的p - c - s - n曲線相結合,提出了譜下材料概率疲勞強度的表達式。
  11. Liquefaction of saturated sands is a greatly complicated phenomenon. its generation, development and dissipation are restricted by physical property, stresscondition and boundary condition of soils. in addition, there are a lot of influencing factors such as density, structure property , clay content, degree of saturation, gradation, hydraulic conductivity, initial stress condition and dynamic load character and so on

    砂土液化是一種相復雜的現象,它的產生、發展和消散主要由土的物理性質、受力狀態和邊界條件所制約,存在許多影響因素,例如土的密度、土的結構性、粘粒含、飽和度、級配、透水性能以及初始應力狀態和動特徵等。
  12. In this paper, the traffic surveys and analysis of typical heavy - load road were performed firstly ; also the characteristics of traffic, load and distribution of axle load were studied. the deficiencies in the calculation method of surface equivalent modulus of foundation in present specification of cement concrete pavements design for highway were analyzed. based on the elastic multi - layer theory and principles of displacement equivalence, and a great amount of computing data, a calculation method was established

    本文首先從典型重交通道路的交通調查與分析入手,研究了重交通道路的交通、軸分佈及特徵,針對現行設計規范中關于基層頂面回彈模值計算公式存在的不足,利用彈性層狀體系理論,按照彎沉等效原則,通過大的計算分析,回歸出了精度較高、適用范圍更廣的基層頂面回彈模計算公式。
  13. At last distribution functions of load modes in life service are presented. based on the resisting force model and load model, the limit state equations of rc bridge are formulated. according to the resisting force is time - dependent and vehicle load is the non - gaussian distribution, jc method is applied to calculate the time - dependent reliability index of rc bridge

    在抗力衰減模型及橋梁模型的基礎上,將可靠度理論引入橋梁結構的評定中,推導出了橋梁結構耐久性極限狀態方程,並根據耐久性極限狀態方程中抗力是時間的函數,以及車輛為非正態分佈的特點,應用正態法( jc法)編制相應的程序計算橋梁構件的時變可靠度指標。
  14. In this paper the friction piles are used in zipingpu multi - purpose dam construction project, the spillway in the side slope is covered with overburden, the horizontal area is from sp. 0 + 200m to sp. 0 + 280m, the elevation is about from el. 810m to el. 950m, there is hard and integral rock under the overburden, which provides enough anchor ability, and it ' s requirement to set the friction pile at the appropriate place ; in order to improve the slope stability that suitable excavation or weeding off the disadvantage load on the landslide are good measures, for the scarp it ' s better to reduce the slope

    摘要紫坪鋪水利樞紐工程溢洪道樁號0 + 200 ~ 0 + 280 、高程810 ~ 950m范圍的內側邊坡為覆蓋層邊坡,坡體下部有較為完整堅硬的巖石,具備提供足夠錨固力的條件,在適的位置可以考慮設置抗滑樁,再通過適的開挖提高邊坡穩定性,或將滑坡體上部不利於穩定的挖除,對于陡坡的坡面可以將坡削緩,則效果會更好。
  15. But the double arch bridges have demerits, for the design lever and the load criterions on the low side then, and the steel is scarce in the structure. when the bridges are loaded heavily, and in heavy traffic for long time, most of them are damage

    但是限於時設計水平和標準偏低,結構鋼材用少,雙曲拱橋存在著先天不足,特別是在長期重、大交通的運營情況下,大部分雙曲拱橋都出現了不同程度的病害,許多已成為危橋。
  16. First, based on the analysis to the development condition of computer and property of the input data of bridge, this paper, taking convenience and practicability as principle, develops the multi passages data - in system made up with human - computer interactive interface and excel import model. second, after comparing and analyzing to the calculation theories and methods of creep and shrinkage, clearing up the key steps of creep and shrinkage analysis, the paper takes incremental method to establish program to analyze secondary inner force caused by creep and shrinkage. third, the paper puts some optimal or simplified treatment to the contents of pre - stress and develops relative program ; in addition, through analysis to the different methods used to calculate the secondary inner force caused by pre - stress, the paper combines equivalent load method with finite element, carries out some simplified treatments, and establishes program to calculate secondary inner force caused by pre - stress

    首先,在分析前計算機的發展狀況及橋梁結構輸入數據特點的基礎上,以方便、實用為原則,採用人機交互界面和excel輸入方式聯合的多通道數據輸入系統;其次,通過比較分析徐變收縮計算的各種理論及方法,澄清了徐變收縮分析的關鍵過程,並採用增法編製程序,實現徐變收縮次內力分析;再次,對預應力的相關計算內容進行適優化或簡化處理,並編制相應程序;另外,本文還在比較預應力次內力各種計算方法的基礎上,將等效法結合有限元進行一些簡化處理,編製程序實現預應力次內力的計算;最後以三個算例來校核計算方法及程序運行結果的可靠性,取得了預期效果。
  17. In order to make clear the influence of two kinds of stress to the total stress, equivalellt thermal stress of lpg vessel under only tempertae load and its equlvalent mechanical stress under only inner wall stress are calculated and analyzed, then its equivalent total stress is calculated, analyzed and compared

    為了弄清這兩種應力分別對總壓力的影響的大小,首先單獨對液化氣壓力容器僅受溫度時的瞬態熱應力以及僅受內壁壓力時的瞬態機械應力進行了計算分析,然後計算了液化氣容器的總應力並對其進行了分析比較。
  18. Dynamic equivalent axial load

    軸向
  19. Dynamic equivalent radial load

    徑向
  20. For three - short - pier shear wall under vertical loads, the results remain the same, and transfer beam at this moment will work with the middle pier, constituting a t - shape beam to sustain the moment and axial tensions together. 4. under the horizontal loads, the inner stress distribution in the frame supported short - pier shear wall shows similarities with that of the short - pier shear wall underneath the fastened supports

    4 、水平作用下,框支短肢剪力墻墻肢內的應力分佈形式接近於下部固支的短肢剪力墻的應力分佈;轉換梁承受上部墻肢傳遞的拉力、剪力和彎矩,短肢剪力墻墻肢數較多時,轉換樑上、下邊緣拉、壓應力交替出現,剪應力的最大值處于洞口下方的轉換梁體內。
分享友人