補償水流 的英文怎麼說

中文拼音 [chángshuǐliú]
補償水流 英文
compensating flow
  • : Ⅰ動詞1 (修理; 修補) repair; mend; patch 2 (補充; 補足;填補) fill up; add supplement; supply; ...
  • : 動詞1. (歸還; 抵補) repay; compensate for 2. (滿足) meet; fulfil
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • 補償 : compensate; make up; make up for; make it up to sb. ; make sth. good; compensation; offset
  • 水流 : 1. (江河) rivers; streams; waters2. (流動的水) current; water flow; fluent; flow; [水文] stream current
  1. The recovery process necessitates waste stream segregation if water and chemical reuse are to offset capital and operational costs.

    假如和化學品回用可使投資和操作費得到,則回收過程需要將廢液分開。
  2. Low pressure trickle irrigation is popular with farmers. currently, the study direction of drip system is to develop low pressure emitters

    當今,研製大量的壓力式灌器是低壓滴灌研究的方向。
  3. Function of compensation lead cable which used for thermocouple is to prolong cold end of thermocouple, and composing system for measuring temperature by connecting with temperature meter. adopting high - quality import teflon insulation and sheath advanced technologic production chain, makes products owning good performance of resistance to high low temperature acidproof anticorrosive antiaging long - term using in oil, etc. normal working temperature is - 40 275

    熱電偶用導線電纜的作用是來延伸熱電偶的冷端,與測溫儀連接構成測溫系統,產品選用進口優質聚四氟乙烯絕緣和護套,並採用先進擠出設備新工藝生產線,具有耐高溫低溫,耐酸堿,防腐,耐老化等優異性能,可浸入油中長期使用,正常工作溫度- 40 275 。
  4. ( 3 ) according to compensation benefit formation cause and scientific, rational, impartial, equitable distribution principle, put forward distribution project of water supply and generation electricity compensation benefit in the main stream of the yellow river

    ( 3 )根據效益成因分析及科學、合理、公平、公正的分配原則,提出黃河幹梯級電站效益中的供和發電效益的初步分配方案。
  5. On the basis of fuzzy matter - element analysis, a fuzzy matter - element model for evaluation of compensation benefits of cascade reservoirs on the mainstream of the yellow river was established by combination with the concept of euclid approach degree

    摘要在模糊物元分析的基礎上,結合歐氏貼近度的概念,建立了基於歐氏貼近度的黃河幹梯級效益方案評價的模糊物元模型,採用主客觀賦權法計算評價指標的權重。
  6. Aiming at the compensation benefits calculation combined with development layout of the yellow river mainstream cascades is now taken into account the dynamic characteristic of different level years, the compensation benefit simulation model of the yellow river mainstream cascade reservoirs is adopted to calculate the power generation compensation benefits of the yellow river upstream run - of - river power stations in three level years of 2000, 2010 and 2020

    摘要針對以往效益的研究都是靜態計算而言,本文結合不同平年黃河幹梯級的滾動開發規劃,考慮不同年代效益的動態特性,採用黃河幹梯級效益的模擬模型,計算了2000 、 2010以及2020三個平年黃河上游徑式梯級電站的發電效益。
  7. Built up the optimal compensation regulation model of cascade hydropower stations for water resources system in the main stream of the yellow river, adopted poa method to solve optimal model in order to analysis water supply and generation electricity compensation benefits, discussed its distribution project and implementation countermeasures

    本論文主要針對黃河幹資源系統建立幹梯級庫、電站調節優化模型,採用逐步優化演算法( poa )求解模型,定量分析計算了黃河幹量以及電量效益,探討了黃河幹效益的分配方案和實施對策。
  8. Children of the member that partial hobo children learns to proofread worker of ab extra wu is avoided receive education to compensate gold, get great welcome, but hobo children school also is existing pay of insecurity of persons qualified to teach, teacher standard of persons qualified to teach of not tall, whole is wronger wait for a problem

    部分動人口子弟學校對外來務工人員子弟免收教育金,受到極大歡迎,但動人口子弟學校也存在著師資緊張、教師待遇不高、整體師資平較差等問題。
  9. The corresponding local loss of water in the bark has to be compensated by an inward flux of water inside the latex cells, and their surounding tissues

    樹皮內相應地方分損失由環繞著組織的乳膠細胞內的提供
  10. The tension force, shear forces ( including pushing force, cutting force and friction force ), impulse force, hydrodynamic drag on the suction pipes, and the force resulted from the pressure difference, etc, are the main forces for detail discussion in this paper

    詳細討論了主要作用力:在波浪器作用下的纜繩拉力、耙頭與海床間的土壤剪切力、作用在耙吸管上的阻力及由於壓力差在耙頭處產生的推動力等。
  11. The major advisory services completed in recent 3 years are as follows ( 1 ) " study on comprehensive benefits of the three gorge project " ( main participator ), which was the key project ofthe seventh five - year plan of the state and won the first - grade prize for outstanding achievemetn in scence and technolog awarded by the state science and technology committee ; ( 2 ) " cause analysis and countermeasure study about investment over - estimation of water project ; ( 3 ) " research on modermization of water conservancy " ( 4 ) " investigation of water price system of yellow river basin / ; ( 2 ) - ( 4 ) are the key projects of the ministr of water resources p. r. c. person in charge ( 5 ) " assets evaluation and compensation investment calculation for 41 inundated enterprises in the theree gorge reservoir area " ( 6 ) ' proitive analysis of regional economic developetn and port construction of jiansu province " ; ( 7 ) " surpervision for resettlement adn rehabilitation of dahe reservoir in guangdong province " ( person in charge ) and so on

    近三年業主要從事的重大咨詢業務有: 1 .作為主要參加者承擔完成國家『七五』重點攻關項目「三峽工程綜合效益研究」 ,獲國家科委科技進步獎一等獎;主持完成利部重點項目: 2 . 「電工程投資超概算成因分析及對策研究」 、 3 . 「現代化利研究」和4 . 「黃河價制度研究」 ;作為技術及外業負責人先後完成了: 5 . 「三峽庫區受淹企業資產評估及投資計算」 、 6 . 「江蘇省區域經濟發展與港口開發的實證分析」與7 . 「廣東省大河庫移民遷移安置監理」等咨詢業務。
  12. Theoretical model for water pollution compensation in rivers in china

    污染損失模型研究
  13. Then the paper uses the same typical four network operating conditions as the primary given conditions and when adding one set of the parallel capacitor bank, changing the 330 / 220kv transformer tap changer position step by step to change the transformer ration, through this study methods this paper found out all the optimized combination of the tap changer position and the amount of input reactive power, also obtained four sets of the 330kv, 220kv and hokv s / s bus voltage and the active and reactive power losses changing curves. through analyzing the optimized combination control curve and the network power flow, the paper generalizes the rules as following : the chief measure of coordinative control is inputting shunt reactor in chengxian s / s in winter time both in the planning year of 2010 & 2005 ; in summer time in planning year of 2010 the chief measure is to input proper shunt capacitor

    本研究通過分析所獲得的最優綜合控制組合曲線及電網潮,總結出了如下規則:隴南電網在2005年及2010年冬大、以及2005年夏小運行方式下,綜合控制應以成縣變投入適量並聯電抗器作為主要措施;在2010年夏小運行方式下則投入適量並聯電容器作為主要措施,再輔助以選擇合適的主變有載調壓分接頭來調節,達到控制網內無功潮分佈合理、各變電站母線電壓在理想的范圍內時電網有功損耗最小,從而也提高了電網安全運行平及供電質量。
  14. In this paper we use the water sources in the eastern route of south - to - north water transfer project to discuss the ecological compensation for interbasin water transfer, and give the advice to set up the protection area of water sources in the eastern route of south - to - north water transfer project according to the several methods

    本文以南北調東線源地生態功能保護區建設為例,探討了跨域調所涉及的生態問題,並根據多種計算方法的加和,提出了建立南北調源地生態功能保護區建設城生態機制的思路和建議。
  15. In the meantime, the increasing of quality and quantity of water resources has the realistic significance in raising the quality of agricultural products, developing green industry and promoting the economy the second booming of heilongjiang province. the thesis is based on the mechanism of water resources in the developed country. the thesis analyzes the representative theories ; puts forward the price mechanism including the water resources fee, water resources price ; market mechanism ; integrated management of water and organizational structure ; legal mechanism according to the status quo and the questions of heilongjiang province

    本文在對國外先進國家資源機制研究的基礎上,比較分析了資源價值的代表理論,結合黑龍江省資源機制的現狀和存在的問題,提山了以資源費、價為核心的價格機制;以權分配為核心的權交易市場的建立:根據資源的特點,提出了資源域統一管理機制及新型管理組織機構,以及保障以上機制順利運作的法律機制。
  16. At the same time, the method of disposal phase shift of ct by compensation is introduced. then the analysis and statistic of electrical power quality, the control scheme and compensating amount of capacitor for reactive power compensation are analyzed respectively. and in the paper, the control with a / y and the switch with ac contactor and solid state switch is valid measure not only for improving operate level economically and amending electrical power quality but also for avoiding of replacing switch frequently and decrease economic loss

    然後對現有的演算法進行了詳細的分析、比較,篩選出既能滿足硬體要求又可降低投資、保證精度、簡化軟體的方案,確定了準同步采樣的方案,並通過對準同步采樣誤差的分析,提出了一種從45開始采樣,從而提高精度的采樣數據處理辦法,同時,對于電互感器相位漂移提出了一種辦法,接著對裝置中電能質量分析與統計以及無功中電容器的量、投切原則也作了相應分析,其中對于無功採用y混合接線,並利用交接觸器和固態開關共同投切電容,不但提高了經濟運行平、改善了電能質量,而且有效的避免了頻繁更換開關,減少了經濟損失;最後,設計了裝置的硬體電路並繪制了相應的軟體程圖。
  17. The company mainly produces high - tension and low - tension electric equipment, thyristors electrical machinery soft starter, automatic regulating silicon piles etc. it developed the technology with own patent adopting sun shape heat tube radiators with steam and water separated, and developed the integrated power module unit including thyristors and rectifiers with the technology. the products organization is novel, and it conducts heat rapidly and has solved the difficult problems of heat dissipation in generator excitation and exchange power

    公司主要生產高低壓成套電器低壓動態無功裝置晶閘管電機軟啟動自動調壓硅堆等產品。研製開發出了「日」字形汽分離式熱管散熱,並利用該技術開發了晶閘管整管一體化功率組件,結構新穎,傳熱迅速,為發電機勵磁交調功等領域解決了器件散熱難題,產品的各項性能均處于國內外領先平。
  18. ( 2 ) in term of two cases that being upstream long - liu regulation or not, solved optimal model to obtained compensation results of water supply and generation electricity. the ning - meng system increased water 17. 08 * 10a8 m3, the downstream system increased 7. 13 * 10a8 m3 ; the runoff power stations increased generation 8. 93 * 10a8 kw - h, the san - xiao increased 9. 10 * 10a8 kw - h

    ( 2 )按照「無」龍劉調節和「有」龍劉調節兩種情況,分別進行模型求解計算,對比分析得到黃河上游電站為中下游提供的量以及電量調節結果:多年平均上游電站為寧蒙灌區增加有效供17 . 08億m ~ 3 ,為下游省市增加有效供7 . 13億m ~ 3 ;為上游徑式電站增加電量8 . 93億kw ? h ,為三小增加電量9 . 10億kw ? h 。
  19. Breaking off at wuwei on the hai - jin liens, after " ti " mode joined into wuwei 330kv transformer substation, it may bring some problems, such as fundamental frequency excessive voltage, resonance excessive vohage, stability, undercurrent, reactive power compensation, etc. these problem be analyzed. it provides the schemes of design and build wuwei transformer substation and reform the transmission line of hai - jin - jia

    在海金線武威開斷, 「 」入武威330kv變電站后可能帶來的如:工頻過電壓、諧振過電壓、穩定平、潛供電、無功等問題進行分析,對武威變電站的設計、建設及海金嘉線路改進提供方案。
  20. It is inevitable that the water resource distribution is inefficient in the water transfer project with no such institution of profit compensation

    摘要在跨域調工程中,由於對調區域缺乏利益機制,必然會造成資源的無效配配置。
分享友人