裝貨區域 的英文怎麼說

中文拼音 [zhuānghuò]
裝貨區域 英文
cargo area
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : Ⅰ名詞1. (貨幣; 錢) money 2. (貨物; 商品) goods; commodity 3. (指人, 罵人的話) 4. 動詞[書面語] (出賣) sell
  • : 區名詞(姓氏) a surname
  • : 名詞(在一定疆界內的地方; 疆域) land within certain boundaries; territory; region
  1. Dock operations ( e. g., capacity of preparation areas, loading bays, limits of loading and unloading, rules of freight capacity, schedule of dispatch handling ) are optimized, using scheduled window times and carrier on - time performance is tracked

    卸操作(例如,準備,極限的的容量,物容量的規則,分派處理的計劃)優化,使用計劃時間表,跟蹤準時運輸情況。
  2. With the introduction of the liquid chemical loading and discharging system and how operating in zhenhai district, combining the recent statistics date of the port, the chapter analyzes the berth throughout, use - rate of berth, need of the storage area and point out the main problem now existing. chapter three combining the new project of the district analyzes the handling system layout entirely, meanwhile it builds four series of liquid chemical transfer - lines projects which fit the need of the future

    第二章主要對化工的發展現狀進行了分析,在簡單的介紹了散液體化工品的卸工藝和化工液化卸工藝的布局形式和運作方式的基礎上,結合港現有的各類統計資料,通過對泊位通過能力,泊位利用率和運量等資料的分析研究,指出了目前化工液化工藝布局中存在的主要問題,並提出了解決目前存在問題的基本思路。
  3. Please do not leave vehicles unattended in the white loading zone

    請不要將空車停在的白色
  4. Are there lights in the loading area

    裝貨區域是否有照明燈?
  5. Monitor the visual merchandizing and goods display for all retail stores, working closely with relevant parties to solve problems

    檢查所負責店鋪的品陳列,店鋪形象,修等,並與相關部門合作改善存在的問題。
  6. The automat i c mon i tor i ng on the i oad i ng s i tuat i on of mov i ng f re i ght tra i ns should be implemented to ensure the operation security of railway fre i ght. the paper presents a new algorithm for freight train image segmentation with the aim of minimizing missing gauge - exceeding detection rate based on the image segmentation theory. the prof i le of the freight train and cargoes on the image is obtained with the arithmetic and whether cargoes exceeding the gauge or not is concluded by the location of the freight train and cargoes on the image

    本文以數字圖像處理原理中圖像分割理論為基礎,結合載狀態監測的實際情況和載狀態監測系統對圖像分割的要求,以保證超限漏檢率最小為目標,給出了車圖像自動分割的演算法,獲得車及其所物的分佈,再根據該分佈,得出載狀態是否超限的結論,從而實現對運行中車的載情況的自動監測。
  7. This ship is built of steel, all - welded, double engines, double propellers, double rudders and single deck, aft engine. the ship is built of double bottom in way of cargo space and double skins structure

    本船為全焊接鋼質雙機雙槳雙舵單甲板艉機型散苯乙烯液運輸船,液為雙底雙殼結構。
  8. Is the parking area for private vehicles separate from the shipping, loading, and cargo areas

    私家車停放是否和出庫、物儲藏分開?
  9. Next we will use the linear regression and the module to forecast the throughput of the dalian port in the next five years. finally we put forward the strategic plan and the corresponding tactics for dalian port to become the regional shipping centers

    接著又運用線性回歸和二次曲線回歸模型,對今後五年大連港的物吞吐量、大連港及北方周邊主要港口集箱吞吐量進行了預測,在綜合分析預測結果的基礎上,提出了大連港建立國際航運中心的戰略發展目標,並制定了相應的發展對策。
分享友人