計量斷面 的英文怎麼說

中文拼音 [liángduànmiàn]
計量斷面 英文
ruling section
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : Ⅰ動詞1 (分成段) break; snap 2 (斷絕;隔斷) break off; cut off; stop 3 (戒除) give up; abstai...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • 計量 : calculate; estimate; meterage; metering; batching; measure
  • 斷面 : section; fracture surface; plane of fracture
  1. The report takes account into the influence of foreshore and shallow foreshore, roughness, slope, berm, wave attack angle, vertical wall and so on

    報告給出了復雜上波浪爬高和越浪算公式,算中考慮了前灘、邊坡糙率、邊坡坡度、平臺、波浪入射角以及豎墻等因素的影響。
  2. This meter consists of a conduct having an enlarged section.

    這種流包括一個具有擴張的導管。
  3. And keeping on road of profession, extensity, modernization, and globalization, astra offers excellent products and great care to our customers and make efforts to play an active role in the instruments business and measuring and testing field at home and abroad

    願與國內外從事金相理化檢驗和測試工作的同仁協作,不將適用於各行各業檢測需要的新產品、新技術推廣給各界用戶,為廣大客戶奉獻全、優質、高效、專業的服務。
  4. This unevenly location of fdi and it ' s fluctuate trend affected the balanceable development of regional economy profoundly. based on the international capital flows and the economic facts of fdi flowing into china, this paper establishes an analytic framework with international economics and regional economics, then analyzes the effect of fdi on regional economic growth and in the end put forward the regional policy advice which would stimulate foreign investments inflowing into china

    本文以經濟全球化趨勢下的國際資本流動和改革開放的經濟現實為背景,借鑒新制度經濟學和新古典經濟學分析方法,建立了國際經濟學、區域經濟學和發展經濟學的分析框架,理論分析與實證研究相結合,重點運用數理統方法和經濟模型,利用時間序列和橫數據對fdi對我國區域經濟增長的影響進行了全分析,並提出了引進外資的區域政策建議。
  5. This paper researches on the water and suspension in zhujiang ( pearl ) river and her three branches, sampling in makou hydrological gorge station of xijiang river, hekou hydrological gorge station of beijiang river and boluo hydrological gorge station of dongjiang river. the author calculated the riverine carbon flux and measured the content of different carbon forms and carbon isotope composition. furthermore, the author also studied drainage basin erosion and the influence of vegetation distribution on erosion

    本文以珠江水體、懸浮物為研究對象,通過對西江馬口、北江河口、東江博羅水體取樣,分析水體中不同形態碳含,測定碳同位素值,並算了河流碳通值;還對珠江流域的侵蝕狀況及植被分佈對流域侵蝕的影響進行了探討。
  6. It was specially pointed out that, when the tail water is constant maximum tide, the computed flood surface is higher than that of nonsteady current, so there is some safety superelevation. underestimation of the roughness will make downward bias to compute along - river surface and bring hidden trouble for flood control. to improve the section can decrease the water level or offset the water rise for increase of floodplains " roughness, but it need much engineering works

    特別提出,按照恆定流算出來的設水位比非恆定水位具有一定的安全儲備;而對于灘地糙率的低估又會造成設水位的偏低,給防洪工作帶來隱患;如果利用改進形式來降低水位或彌補糙率增加帶來的水位抬高,需要較大的工程,所以平時應注意灘的減糙管理工作。
  7. The impacts of both the velocity head and momentum distribution in the t - junction of a tailrace surge tank on the critical stable sectional area of the tank were analyzed by using gardel ' s empirical equations for t - junction flow. based on thoma ' s theory, a formula of the critical stable sectional area is derived. 5

    基於gardel關於三通管水頭損失的經驗公式,研究分析了連接管處的速度水頭以及進出調壓室水體與尾水隧洞水體之間的動交換,對有連接管的尾水調壓室穩定積的影響,並在托馬( thoma )假定基礎上,推導出相應的調壓室穩定算公式; 5
  8. First, according to measured data and literature, the river channel evolution rule and its reasons in the southern branch of the yangtze river are discussed from the perspectives of historic evolution, recent evolution and the tendency prediction of river channel evolution. besides, the local reservoir has been studied from the changes in thalweg and section as well as the calculation of local erosion and deposit. consequently, the stability and feasibility of reservoir construction in the river section are approved

    首先根據大實測資料及文獻資料,就歷史變遷、近期演變、河演趨勢預測等方,初步探討了長江口南支河段河道演變規律及原因,並具體就深泓線的變化、主槽變化、局部沖淤算等方對擬建水庫局部區域進行了分析,論證了工程河段建設水庫的穩定性及可行性。
  9. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方具體分析研究了的應力與位移分佈規律: ( 1 )在各種不同狀態下的主應力矢圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設和工程施工提供參考依據。
  10. Third, some methods of evaluating water quality and computing water capacity, which are often used in water quality management, are studied and an example of estimating dong jiang cross - section is given

    針對水質管理的具體要求,探討了多種水質評價方法和水容算方法,並給出東江水質評價的實例分析。
  11. In the positive analysis, the paper, firstly using the 1978 and 2001 data in ( time order ) and analyzing the total consumption and its structural characters of rural residents in liaoning province, including the basic tendency and structural change of rural their consumption, came to the conclusion that since the reform and opening up, the total consumption level of rural residents has been promoted and their consumption structure has been improved in liaoning ; secondly, using 2001 sectional data, econometrically analyzed the peasants " consumption structure by employing the by which in the analysis the author makes the assumptions as follows : all the consumers have the identical marginal budget share or the identical marginal propensity to consume when consuming certain goods

    本論文首先利用1978 ? ? 2001年的時序資料分析了遼寧省農民消費的總狀況和結構特徵,包括農民消費的基本走勢及農民消費結構的變遷。得出:改革開放以來,遼寧省農民總體消費水平有了一定程度的提高,農民消費結構不改善;其次選擇2001年截資料對遼寧省農民消費結構進行了分析,在這部分分析中,選用的模型是擴展的線性支出系統模型(簡稱eles模型) ,但採用擴展的線性支出系統模型進行分析和預測消費傾向中,暗含著如下假定: 「對某類消費品的邊際預算份額或邊際消費傾向,所有消費者都是相同的。 」
  12. Di - on electric one of the beijing hi - new - tech enterprise develop and manufacture lots of equipment like sf6 dewpoint meter dp100, cable fault location system cfl6000 and more. di - on electric supply the most advanced technology and equipment on such as gis surge arrestor on line monitoring, resistance measuring, ac dc metrology, thermal - temperature bridge, power transformer diagnostic and testing, cable diagnostic and fault location, sf6and oil moisture measuring, oil treatment and testing, optic fiber temperature monitoring, circuit breaker testing, relay testing and more

    迪揚電氣在gis和避雷器的帶電測試與故障診分析,電力電纜的故障定位與局放檢測,變壓器電抗器的各種測試診與溫度監測, sf6的水分測與回收,絕緣油的測試分析與濾油處理,紅外測溫與光纖在線測溫,以及各種電阻測試與,溫度與電能等方擁有世界一流的技術與成熟的儀器設備。
  13. To solve the inaccuracy problem caused by the two existing methods ( average end - area method and prismoidal method ) used for the calculation of roadway earthwork volume, this paper puts forward a new concept of the 3 - dimensional algorithm that takes all the roadway geometric design procedures as a kind of geometrical operation between the ground model ( original terrain model ) and the roadway model ( designed model ) under certain constraints, and then presents a complete 3 - dimensional algorithm of roadway earthwork volume as well as its executable computer program. the algorithm benefits from the re - triangulation technique of constrained delaunay triangulation ( cdt ), which can yield a true volume value theoretically. through a number of practical tests covering varied intervals between adjacent cross sections, it is proven to possess a higher accuracy compared with that of traditional methods. all the work involved in this paper indicates that the 3 - dimensional calculation of roadway earthwork volume is feasible, more accurate and should have further application in practice

    針對目前廣泛使用的道路土方算方法平均法和稜柱體法算不準確的缺點,提出了三維土方算演算法的概念.該演算法以帶約束的狄羅尼三角化( cdt )為技術核心,認為所有道路幾何設過程都是地模型和道路(設)模型進行幾何運算的結果.基於此,本文設出相應的演算法步驟,同時完成了相應的軟體開發,使得該三維演算法能和傳統的方法進行對比.此外,結合工程實例,採用了不同的道路橫間距對三維算方法和傳統方法的誤差進行比較、分析.結果證明三維演算法具有更好的精度,該演算法可用於道路、場地平整等工程土方
  14. In this paper, we study the most serious damming section of the east - one main canal, which is from the entrance of the hao wan flume ( chainage12 + 123. 6 ) to the exit of shang tian yuan tunnel ( chainage24 + 091. 1 ). the main content is analyzing the flow characteristic of the canal, setting up mathematical model of the discharge condition of the east - one main canal, according to the survey section and actual roughness factors, building, bend and so on, we divided the canal into more than loocaculation segments. each segment is calculated by microsoft excel electrical table through computer as permanent transition flow of non - prismatic channel

    本論文研究的渠段為陸渾灌區東一乾渠壅水最為嚴重的渠段,從郝灣渡槽進口(樁號12 + 123 . 6 )至上天院隧洞出口(樁號24 + 091 . 1 ) ,其主要內容是,分析渠道水流特徵,建立東一乾渠輸水狀況的數學模型,根據測及實際糙率、建築物、彎道等因素的不同,將渠道劃分成120多個算段,每段按非稜柱體恆定漸變流,運用microsoftexcel電子表格進行編程算。
  15. So far as the aqueduct with large discharge and lower head is concerned, the non - uniform flow will occur in the aqueduct, when the discharge is enlarged after the water - carrying section being determined based on the design discharge and the given head ; for which the flow condition must be presumed, so as to determine the water surface profile

    摘要大流低水頭渡槽根據設和給定水頭確定過水后,通過加大流時,渡槽內就會發生非均勻流,需對這種水流情況進行推算,以確定渡槽在通過加大流時的水線。
  16. There are some scholars who continuously pointed out the limitations of the calculation of tecc and its branches. the corresponding response is : on the one hand, the calculation methods of tecc are constantly improved ; on the other, researchers in west countries directly study how to control the problems of tecc, instead of the calculation, thus some theories ( such as lac ) appears

    有學者指出旅遊環境容方法的局限,由此引發的回應是:一方,旅遊環境容方法得到不改進;另一方,在西方學界,旅遊容已被多數學者放棄,轉而直接探討如何控制旅遊活動帶來的環境容問題,由此在西方形成了諸如lac等理論。
  17. Secondly, the finite - element analysis on the typical slope section is performed with establishment of geology model, definition of boundary condition and proper selection of mechanical parameters. the result shows that the slope is of integral stability, and the failure mode mainly comprises infrequent block drop and wedge body breakage. considering the two failure modes of plane failure and wedge body breakage, and stability calculation under different work conditions, the slope stability is discussed and the sensibility ana lysis on its fraction angel and cohesion force is made

    然後通過建立地質模型、確定邊界條件、選擇合理的力學參數,取典型對邊坡進行數值分析,分析結果表明斜坡整體是穩定的,破壞類型以零星掉塊和楔體失穩下滑為主;為了定算邊坡的穩定性,對邊坡兩種破壞類型:單滑下滑和雙滑楔形體下滑,考慮不同工況進行穩定性算,並對摩擦角和粘聚力進行穩定的敏感性分析。
  18. Abstract : in order to provide the reasonable parameters in the reliability analysis of tunnel structure and the criterion in the quality control of tunnel engineering, in this paper, the over - under - excavated values of the real - state outline of tunnel excavation are obtained by the near - field photographic method. by using mathematical statistic method, the figure features and probability distributions of the over - under - excavated values of the surrounding rock, including deferent positions of same cross section, are analyzed

    文摘:採用近景攝影的方法,從隧道開挖毛洞中獲取圍巖超欠挖數據,通過數理統的方法,分析各類圍巖超欠挖的數字特徵及概率分佈,同時得出各類圍巖超欠挖在隧道不同部位的分佈規律,為隧道結構的可靠度研究提供可靠參數,也為隧道工程質控制提供基準
  19. Ningmeng, longsan reaches and its lower reach are studied as well ; from which the suitable and the minimum eco - environmental water demands for 10 important hydrographic sections of the main stream of the yellow river are put forward at last

    對寧蒙(下河沿頭道拐) 、龍三(龍門三門峽)和下游3個重要河段的河道生態需水、環境需水算方法及生態需水、環境需水耦合等問題進行了研究,提出了黃河幹流10個重要水文的適宜生態環境水和最小生態環境水
  20. Based on the cross - sectional velocity distribution of flow in natural river, computation expression for correction coefficient of kinetic energy is derived

    然後根據天然河流橫流速分佈公式,推導了能方程中動能修正系數的算公式。
分享友人