試洞 的英文怎麼說

中文拼音 [shìdòng]
試洞 英文
test adit
  • : 名詞(古代占卜用的器具) astrolabe
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  1. Ambulance workers, including a helicopter crew, were called to the scene after the man poured petrol down the hole and then lit a match in an attempt to kill the offending arachnid

    他將汽油澆到里,然後點了根火柴,圖將這只不懷好意的蜘蛛燒死。之後,救護人員被召集到出事現場,其中包括一支直升機救護隊。
  2. The damping derivatives can only be determined experimentally in the wind tunnel or ballistic range.

    阻尼導數只能用風或彈道驗來確定。
  3. It tries to terminate and deletes the w32. blaster worm process

    也使用到這漏。它會嘗暫停和刪除w32
  4. The advantage and disadvantage of measurement of propeller - induced pressure by using different equipment is discussed. the method to obtain self - propulsion point for full scale in depressurized towing tank is studied. the measurements of pressure of two propeller models are carried out, the results of the measurement agree with those obtained by cavitation tunnel very well, which proves this measurement is successful, and the theoretical prediction is verified too

    比較了不同測設備用於螺旋槳脈動壓力測的優缺點,探討了在減壓拖曳水池中實現實船自航點的方法,並進行了兩只螺旋槳模型的脈動壓力測,經與空泡水中脈動壓力的測結果進行比較,說明該項測是成功的,同時也對脈動壓力的理論預報結果做了驗證。
  5. While dissertating the functions of ngos, the author attempts to discard traditional approaches discussing in general functions of ngos ’, but tries to make further expansion, clarify the functions of ngos different fields during the transformation period, and discuss mainly it ’ s two major functions in accelerating social development and the reform of the government ; meanwhile, this article also points out the main problems of ngos in the transformation period : the indeterminate circumscription between ngos and government organizations, misplaced the organization goals, undivided functions of community and politics ; the lapsus in management and difficulties in operation caused by double management system ; the low level of ngos ’ internal management, weak survival ability, and the limited ability in mobilizing resources ; deficient management evaluation mechanism in ngos ’ ; low level of legalized management of ngos ’

    在論述非政府組織的作用時,圖拋開過去泛泛而談其作用的做法,做了進一步的拓展,釐清轉型期非政府組織在不同領域的作用,將其主要定位在對促進政府改革的作用和在社會發展中的作用兩大方面。同時,本文也指出了轉型期非政府組織存在的主要問題:非政府組織與政府組織的界限不明確,組織目標錯位,政社不分;雙重管理體製造成管理體制的漏和運作上的困難;非政府組織內部管理水平低,生存能力較弱,資源動員能力有限;非政府組織內部管理評估機制匱乏;非政府組織管理的法制化程度低等。
  6. Compressibility effects are investigated with highspeed models in high-speed tunnels.

    壓縮性影響需用高速模型在高速風驗。
  7. This text studied the mutually interference influences to the aerodynamic force of irregular shape base on analysis using wind force and wind pressure data of super high buildings model obtained by wind tunnel tests, and provided reference to designer and expurgator on building code

    本文以超高層建築剛性模型的高頻天平測力風驗數據和表面測壓風驗數據為依據,研究了復雜外形建築的風力和高層建築相互干擾對風力影響,供設計者及規范修訂時參考。
  8. According to the test and observation indicated that mostly fish goes upstream and far away the sluiceway when fish migration, so fishway designed by us was arranged in the right bank of reservoir area and far away from the electricity generation hole intake upstream about 280 meters in order to induce the fish entering the fishway

    根據驗和觀察表明,魚類洄遊時大都沿岸上溯,同時應遠離泄水道,故我們的魚道進出口是布置在庫區右岸,離發電進口上游約280米處,以利誘導魚類進入魚道。
  9. A few balances mounted above the tunnel support the model in an inverted position for "normal" running.

    有少數天平安裝在風上面,把模型支在倒裝位置上進行「正常」的驗。
  10. The jet engine requires a huge scavenging system sometimes using half as much power as the tunnel itself in order to keep contamination low.

    噴氣發動機驗要求龐大的排氣清除系統,以減輕污染,該系統有時要耗去風本身功率一半之多。
  11. This paper adopts linear interpolation to deal with data of wind tunnel experiment for sample uav and realizes modeling and simulation of the sample uav with c language in common aerodynamics and moment coefficient

    本文採用線性插值處理樣例無人機風驗數據,採用正常情況下的氣動力及力矩系數數學模型,並用c語言實現樣例無人機建模與模擬。
  12. The contents of guidebook include : the terms and definitions of night piece illuminating ; basic principle and request ; programming and design ; the night pieces of various illuminating of city facilities and views, such as the building, construction, square, road, the marking of advertisement, park, leisure facilities, dissolve hole and view of water ; the devices of night piece illuminating, equipments with high newly technical application ; power supply and control ; construction and check before acceptance ; the test and the evaluation of the result ; maintenance and management ; environmental protection and the economy energy, etc.,

    指南的內容包括:夜景照明術語與定義基本原則與要求規劃與設計各種城市設施與景觀的夜景照明,如建築構築物廣場道路廣告標志園林與休閑設施溶及水景等夜景照明器材設備與高新技術的應用供電與控制施工與驗收效果的測與評價維護與管理環保與節能等等,並提出了需要注意的問題與解決的辦法。
  13. A recommend value of appropriate roadbed height is put forward according to the sand dune type and the highway grade, make investigation to the sand harm and other problems of built highways in desert areas gathering the related materials of present day highways, and then make comprehensive and systematic statistics to related data and racious factors which affect the roadbed height ; analy the suitable roadbed height for the windblown sand drift passes through smoothly according to the open country windblown sand field test ; test and verify the outcome according to indoor wind tunnel test ; finally a appropriate recommend roadbed height value will be put forward for different grade highways in different areas, which is according to the analysis of roadbed stability the roadbed height economic analysis and different use requirement to different grade highways

    收集現有沙漠公路的有關資料,對全國已建沙漠公路進行沙害及其他病害調查,對相關數據和影響沙漠公路路基高度的各種因素進行綜合系統地統計分析;通過野外風沙流場測定,分析適宜風沙流順利通過的路基高度;通過室內風驗進行驗證;結合路基穩定性分析、路基高度的經濟性分析,考慮不同等級公路的使用要求,最終提出不同地區不同等級沙漠公路路基填土高度的合理高度建議值。
  14. The research test of this discussion as follows : making investigation and research to overseas related materials ; make investigation to built highways in desert areas, dozens of routes and nearly 100 road sections have been surveyed, among them two highways have been taken as the chief investigation objects, they are " 210 national highways - first grade highways from bao tou to dong sheng " and " the section of nei meng a la shan meng s307 from shang de to meng gen " ; the relationship between windblown sand drift and the roadred height wind tunnel test ; make investigation to the tested road sections and subengineerings then make statistics and study according to the test outcome ; the stability analysis of different roadbed height ; the analysis of roadbed economy

    本課題的研究工作包括:對國外相關資料的調研分析;對已建沙漠地區公路進行調查、觀測了十余條線路,近百段路段,以『 210國道包頭至東勝一級公路』 、 『內蒙阿拉善盟s307尚德至孟根段』為主要調查對象;風沙流路基高度的關系、風驗;對調查路段及依託工程調查、觀測結果統計研究;不同高度下路基穩定性分析;路基經濟性分析;按照沙丘類型及公路等級提出路基合理高度推薦值。
  15. Hypersonic propulsion test facility is important for the scramjet ground tests

    摘要高超聲速推進風是進行超燃沖壓發動機模型地面模擬的重要驗設備。
  16. As part of this effort, an integrated scramjet model is about to begin testing at up to mach 5. 6 in a new wind tunnel in beijing

    作為該項工作的一部分,一個可達5 . 6馬赫的綜合沖壓模型即將在北京的一個新的風內開始測
  17. At the same time we study, analysis and discuss the action that non - linearity - stickiness - springiness and crazing damage of the pmma sample under creep though making us of the knowledge about the high molecule physics the damage theory of material of rheology of bodies with defects. through the study and theory analysis of single - axes stretching experiment in pmma sample under creep, take the surface crazing damage density of pmma sample as an variable, to look for a commonly rule that the crazing damage of pmma, and to offer a feasible damage model for the sake of study that of pmma ' s remoteness damage

    同時運用高分子物理、含缺陷流變性物體的材料破壞理論等知識,對無孔pmma件和有孔pmma件蠕變條件下非線性粘彈性行為及其銀紋損傷現象進行了研究、分析與探討,通過對蠕變條件下的pmma件的單軸拉伸實驗研究和理論分析,以pmma件的銀紋損傷面密度值為損傷變量,來嘗尋求pmma銀紋損傷的一般規律,為研究pmma的細觀損傷提供了一種可行的損傷模型。
  18. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次樁施工工藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測工作;驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  19. Wind tunnel testing for stonecutters bridge tower

    昂船洲大橋橋塔的風
  20. Stress tests of surrounding rock mass in substratum cavity

    地下室圍巖三維應力測實例
分享友人