試驗場地 的英文怎麼說

中文拼音 [shìyànchǎngde]
試驗場地 英文
proving ground
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  • 試驗 : trial; experiment; test
  • 場地 : area; yard; space; place; site; court; field
  1. Such as : the liner of coal bunker of power station, the lining of dust cyclone and classifying cyclone, the liner of chemical storage tank and warehouse for corrosion material, the floor material for chemical plants and low friction vehicle testing surface etc

    玄武巖鑄石板主要用於襯砌火電廠煤倉,各種規格旋風器,鋪設各類化工廠面,汽車剎車試驗場地面等,也用於襯砌酸洗槽或儲存腐蝕性物品的貯存室。
  2. The cast basalt tiles may be used in all kinds of ways. such as : the liner of coal bunker of power station, the lining of dust cyclone, the liner of chemical storage tank and warehouse for corrosion material, the floor material for chemical plants and lowfriction vehicle testing surface etc

    玄武巖鑄石板主要用於襯砌火電廠煤倉,各種規格旋風除塵器、旋流器、鋪設各類化工廠面,汽車剎車試驗場地面等,也可用於襯砌酸洗槽或儲存腐蝕性物品的貯存室。
  3. We build a ride comfort testing graphics database regarding real proving ground, which contains the objects, e. g. road surface, river, grassland, house, trees, cordillera and so on

    參照道路景,建立了模擬隨機道路的包括路面、河流、草、房屋、樹木、山脈等對象的車輛平順性圖形數據庫。
  4. The first role concerns financial intermediation between the mainland and the rest of the world ; the second concerns assisting domestic financial intermediation on the mainland ; and the third is for hong kong to be the laboratory for capital account convertibility of the renminbi and the increasing international use of the currency

    第一個角色關乎內與全球其他區之間的資金融通第二個角色是為內的資金融通提供協助而第三個角色是以香港作為人民幣資本項目可兌換及增加人民幣在國際上的使用的試驗場地
  5. Activities during the factory acceptance test, site acceptance test, and site integration test for automation systems in the process industry

    製造工業中自動化系統在工廠試驗場地綜合過程中的活動
  6. Gully erosion, which is universal on original lands, but also the special forms, for example, hole erosion gravel erosion debris slide and debris flow, which is unusual in loess area, ( 2 ) based on a long - term fixed point experiments in proving ground of the south stackpile, the soil erosion factors have been researched quantitatively, the runoff and erosion affected factors have been made sure and the experiential models of producing water and soil have been taken in newly - constructed stage, early stage and later stage of reclamation

    確定南排土貌的水蝕模數為3700 4400t km ~ 2 ? a ;在排土新造貌上,擊濺、面蝕、細溝侵蝕、淺溝侵蝕、沉陷侵蝕、砂礫化面蝕、土砂瀉溜和坡面泥石流等水土流失形式出現頻率和發生程度都明顯強于原貌。 ( 2 )以南排土徑流長期的定位觀測為基礎,對排土未復墾時期、復墾初期、復墾後期的土壤水蝕影響因子進行定量研究,確定了徑流和土壤水蝕的主要影響因子及其臨界值,建立了產流產沙的經模型。
  7. With highest respective boundary pbl parameter scheme, we devise five test projects : control experiment and sensitive experiments without sensible heat flux, without latent heat flux, without sensible and latent heat flux, without terrain

    在高解析度邊界pbl參數化方案下設計5組方案,對幾個個例風進行模擬檢:控制、無感熱、無潛熱、無感熱無潛熱、無
  8. Abstract : a dispersion test is carried out in field in order to get the dispersion parameters of the shallow aquifer. fem model is used to simulate the dispersion process in the test area

    文摘:通過現彌散測定淺層含水層的水動力彌散參數,用有限分析法模型模擬彌散,為建立濱州市淺層下水溶質運移模型提供依據。
  9. One is situated in the place with frequent earthquakes occurrence, the other is in the place with no earthquakes

    震頻發區的,用於證觀測項目效果;無震,用於儀器的抗干擾性能和確定背景
  10. Guide for the computation of errors in open - area test site measurements

    露天試驗場地測量誤差的計算指南
  11. Antenna testing site

    天線試驗場地
  12. Open area test site

    開闊試驗場地
  13. Aerial testing site

    天線試驗場地
  14. The test of the abs is laborious and expensive and needs more time and the special field. so it is limited by the test ' s condition

    Abs的費時、費力又需要大量的經費,同時abs的需要專門的試驗場地,因此又受到條件的制約。
  15. The management and protection of water and soil conservation facilities, experimental sites, trees and grass planted and other rehabilitation achievements shall be strengthened

    對水土保持設施、試驗場地、種植的林草和其他治理成果,應當加強管理和保護。
  16. They are vitally important in reinforcing our position as an international financial centre, and will at the same time provide a testing ground for the move towards full rmb convertibility

    這兩項建議如果能夠落實,將可大大促進兩的貿易往來及推動香港債券市的發展,對鞏固香港作為國際金融中心的位有重要意義,同時也為人民幣走向全面可兌換提供一個試驗場地
  17. The static loading test for three group of testing piles of jiading power plant secend stage project are analyzed and studied in this thesis, and the practical applying of high - accurate data collector, technique of waterproof insulation and testing technique of burying in the body of pile are introduced also. the vertical and horizontal loading features of three group of piles of different kind and constructing technique in different earth layer at the pile point are analyzed and compared and summed up with basic integro - differential equation calculating the pile earth system load transmit, transforming principle of stress - deforming and pile body rating of burying electric measuring element. changing law of stress, and changing law of pile body shifting and bending for different testing piles under vertical and horizontal load are showed so that the loading features of soil layer and pile at testing spot, reliable design data for pile type and base for scientific construction technique are provided

    本文僅就嘉定電廠二期工程中的三根樁的靜載進行了分析和研究,利用樁土體系荷載傳遞分析計算的基本微分方程及應力-應變轉換原理,結合預埋電測元件的樁身率定,對三組不同種類、不同施工工藝、不同持力層中的樁的豎直、水平承載特性進行了分析、比較和歸納,通過大量、全面的實測數據,經過整理、轉換和推演,揭示了不同樁在豎直、水平荷載作用下的應力變化規律和樁身變位、撓曲變化規律,最終提供試驗場地土層和樁的承載特性,為該工程合理設計樁型提供了可靠的設計參數,為確定科學的施工工藝提供了有力的依據。
  18. The model can be designed according to the absolute normal model scale or the distorted model scale, in consideration of the conditions of the test site and water supply capacity etc., this experiment designs model in the light of the distorted model scale

    模型可以設計成正態,也可以設計成變態,考慮到試驗場地、供水能力等因素,模型按變態設計,模型比尺同時滿足了波動方程和水擊方程的相似條件。
  19. Traditional load test is generally accepted as a most directly and reliable method for determining the bearing capacity of piles. because the method need special reaction system, it will take more time and money and require high condition for test field. so it cannot be done randomly and widely, and cannot be done under hardly conditions

    傳統靜載是公認的確定單樁承載力最直觀、最可靠的方法,但由於必需專門的反力系統,費時、費力、費用高昂且對試驗場地有著極高的要求,也因此不可能做到隨機抽檢及大量普查;特別是在某些惡劣的條件下,由於空間的限制甚至不可能進行靜載
  20. ( 5 ) based upon numerical simulation, the effect of initial value and measure random error on back - analysis is discussed, and the first parameter and the second parameter of two - parameter model of the experimental field is identified using the experimental data

    ( 5 )通過數值模擬,分析了初值及測量結果隨機誤差對反分析結果的影響,並利用數據,識別出試驗場地雙參數基模型的第一參數與第二參數。
分享友人