課程負荷 的英文怎麼說

中文拼音 [chéng]
課程負荷 英文
course load
  • : Ⅰ名詞1 (有計劃的分段教學) class 2 (教學的科目) subject; course 3 (舊指賦稅) tax 4 (舊機關...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • 課程 : curriculum; course課程安排 course arrangement; 課程編排 construction of curriculum; 課程編制 curr...
  • 負荷 : [電學] load; charge; weight
  1. In so doing, each segment of genetic material will be embodied leading to ongoing ascension rather than disease

    其中,每一片業力都被完全檢查,相關的靈性都被學會,而來自過去的所有情感都被處理並完全釋放。
  2. Please be sure to enrol in a full - time course load as this is a visa condition for onshore international students on a student visa

    當這以一個學生簽證是向陸的國際學生的一種簽證情況的時候,請確定登記在全部時間的
  3. Not satisfied with the heavy load of regular classes for their children, many parents send their youngsters to after - hours programs

    由於對孩子們正常的重大仍不滿足,很多家長把孩子送到校外補習班學習。
  4. After the technique reform in 2003, the oracle database system replaced the file system, each data for the process system is saved in the oracle database system, and the oracle net 8 is used for the communication between the process servers. how to design a good database system in process system, and how to tune the oracle system become a important problem for pangan hot strip mill after technique reform. this paper introduce the oracle database application system in pangang hot strip mill process system for architecture 、 designing principle and ways

    熱連軋生產過是一個快速過,對過式控制制系統的響應時間有很高的要求,通常在100至500毫秒級,過式控制制系統本身的計算又很重,由於oracle數據庫不是一個實時數據庫,如何設計一個適應熱連軋過式控制制的oracle數據庫應用系統,以及如何優化oracle數據庫系統,使其穩定高效的運行,保證熱軋生產的順利進行,是攀鋼熱軋板廠過式控制制系統改造后急需解決的一個題。
  5. With the expansion of reformation and opening policy, transportation trade in our country has developed very quickly. traffic is heavy and the load of vehicle is growing, which greatly exceeds the value of highway vehicle. so some roads have to be used over its design parameter and some bridges are damaged

    隨著我國改革開放的不斷深入,交通運輸業有了突飛猛進的發展,公路交通量和汽車載重量日益增加,遠遠超出了當年的設計計算值,致使公路橋梁遭到了不同度的破壞,但仍在超使用,改造和加固這些超限服役的橋梁迫在眉睫,如何找出一條既合理,又省錢,又不斷交(省時)的加固方案,已是公路建設者們的一道題。
  6. We also accredited 13 confined spaces safety training courses, 12 loadshifting machinery safety training courses and 16 gas welding and flame cutting safety training courses

    我們亦認可了13個密閉空間安全訓練、 12個物移動機械安全訓練及16個氣體焊接及火焰切割安全訓練
分享友人