調峰氣 的英文怎麼說
中文拼音 [diàofēngqì]
調峰氣
英文
peak load gas stand-by gas peak-shaving gas-
For increasing the effective material peak - value power ( empvp ), solving the contradiction between enhancing the pmsm ' s flux - weakening capability in the electromotor state and reducing the pmsm ' s connatural adjustment ratio in the dynamotor state and improving the efficiency of the pmsm, some solving method are taken as follows : the influence of length / diameter ratio to the empvp is analyzed, and the optimum size of length and diameter is chosen
主要是從提高電機的有效材料峰值功率、解決pmsm提高電動機運行狀態時的弱磁擴速能力和減小發電機運行狀態時的電壓調整率之間的矛盾及提高電機的效率著手,分析了長徑比、氣隙長度對有效材料峰值功率的影響,並確定了它們的最佳尺寸。The pressure at every point along the pipeline, the gas - liquid phase flow rate and the law of the liquid holdup in the pipeline chang ing with time in the process of gas storage and supply at the time of peak shaving are simulatively calculated, and based on this, the problem on peak shaving is thoroughly analyzed by combining with the existing pinghu - shanghai gas pipeline in china
模擬計算了調峰過程中管道儲氣和供氣過程沿線各點的壓力、氣液相流速和管內持液率隨時間的變化規律,據此結合我國已建成現有的平湖一上海的天然氣管線,對調峰問題作了深入地分析。In this paper, starting from the basic law of fluid me chanics, a mathematical model equation for describing the tran sient flow of the wet gas in the pipeline under peak shaving op eration is established, a simplified treatment for the model equa tion is made and a train of thought for concrete calculation is de signed
文章從流體力學的基本規律出發,建立了描述濕天然氣管道輸送調峰工況下瞬變流的數學模型方程,並對模型方程作了簡化處理,設計了具體的計算思路。Analysis of peak - shaving and storage of town gas
城市燃氣調峰與儲存問題的分析Multiple functions available : start / crater arc current, increase / decrease time, base / crest value current, pulse frequency, pulse rate, post flow time, hf welding
功能豐富:起始/收弧電流、上升/下降時間、基值電流、峰直電流、脈沖頻率、占空比、滯后關氣時間分別可調,高頻引弧。Multiple funcyions available : start / crater arc current, increase / decrease time, base, crest value current, pulse frequency, pulse rate, post flow time, hf / friction welding, water / gas cooling
功能豐富:起始/收弧電流、上升/下降時間、基值電流、峰值電流、脈沖頻率、占空比、滯后關氣時間分別可調,高頻/接觸引弧、水冷/氣冷可供選用。By means of engineering examples, a comparison is made on the economy and environmental protection for four cooling and heat sources, including gas direct - fired machine, centralized heat - supply plus electric refrigerating, gas boiler plus electric refrigerating and air source heat pump plus gas peak - shaving boiler
通過工程實例,對以燃氣直燃機、集中供熱電製冷、燃氣鍋爐電製冷、空氣源熱泵燃氣調峰鍋爐4種冷熱源的經濟、環保性進行了比較。If the urban gas load can be forecasted accurately, the most essential designing parameters will be provided for the confirmation of the gas storage facilities for peak - load regulations and the most reasonable dispatch of urban gas
摘要準確地預測城市燃氣用氣負荷量,才能為調峰儲氣設施的確定及城市燃氣優化調度提供最基本的設計參數。Then, harmonic analysis is done with the newest baytap - g tidal data analyzing software developed by ishiguro and professor tamura, who are working in japan and the eterna34 tidal data analyzing software developed by wenzel, who had worked in german. as a result, the recently observed tidal gravity parameters of jiufeng station are obtained. finally, the ocean loading correction of the observing tidal gravimetric parameters, the temporal synthesized tide, correction of the station air pressure and the polar motion on the gravity residual, the analysis of the final residual, and so on, are investigated
Vauterin研製的tsoft潮汐數據預處理軟體,實施了觀測數據的預處理,為超導重力儀觀測數據的國際資料交換和數據分析準備了修正後數據;然後利用由日本ishiguro與tamura研製的最新的baytap - g和由德國的wenzel研製的eterna34潮汐分析軟體,對預處理后的重力潮汐觀測數據進行調和分析,獲得了九峰臺最近的觀測重力潮汐參數;最後討論了觀測潮汐參數的海潮改正、隨時間變化的重力合成潮的構制、大氣效應改正、極移重力改正以及最終重力殘差的分析。In the cogeneration system, heat and power affect each other, heating - pump heating ( air conditioning ) system can not satisfy the peak load very well
熱電聯產系統熱電相互牽連,熱泵供暖(空調)系統不容易很好地滿足尖峰負荷,鍋爐供暖系統供熱中天然氣燃料構成的成本過高。With fast development of our country " s gas industry and air ' s increasingly serious contamination in city, using gas instead of coal and supplying energy in high efficiency and cleanliness has become necessary way in city. there are different problems in the current heating ( air conditioning ) systems. in the cogeneration system, heat and power affect each other, heating - pump heating ( aie conditioning ) system can not satisfy the peak load very well, the cost of gas fuel in boilor heating sestem is so high. the high generating efficiency of the diesel - engine two - sourse heating ( air conditioning ) systems is limited in range of 100kw - 1000kw, the heating scope is so limited. combined cycle of two sourse heating ( air conditioning ) system is most suitable selection to buesness community with big scope my paper aim at this syetem ' s primary question when it is applied in our country - - - - bringing project into execution and technology economy feasibility and off - design performence, combined with a certain demonstrating project in beijing buesness community, going along with calculating and analyzing, drawing out some efficient datas and conclusions, based on this, bringing out primary alements affecting combined cycle of two sourse heating ( air conditioning ) system " economics
熱電聯產系統熱電相互牽連,熱泵供暖(空調)系統不容易很好地滿足尖峰負荷,鍋爐供暖系統供熱中天然氣燃料構成的成本過高,內燃機雙源供暖(空調)系統的高發電效率僅限於100kw - 1000kw負荷范圍,供熱面積有限。對于大面積的商業園區、居民小區,燃燒天然氣的燃氣-蒸汽聯合循環雙源供暖(空調)系統是最佳選擇之一。本論文針對該系統在我國應用時的主要問題- - -方案的技術實施與技術經濟可行性,結合北京某一商業園區示範工程,進行了系統的計算與分析,得到了有效的數據與結論,在此基礎上,提出影響聯合循環雙源供暖(空調)系統經濟性的主要因素,並進行敏感性分析,得出有益的結論;最後通過各種供暖方案的比較分析回答了某些人對該系統的疑慮和不解,並指出系統的優化方向。The aspects which i specified in the draft versions of my thesis, for example, building energy performance, energy conservation models, relationship between building energy efficiency and energy conservation, description for keeping natural environmental conditions within the building, address the following problem of 1992 the governments signed the united nations framework convention on climate change ( fccc ) at the earth summit in rio de janeiro, buildings impact on natural resources and environment, to use “ ecological footprint ” concept and measuring for assessing the impact on resources and environment from use of energy in buildings, method for obtain local climate weather profiles, features of nz weather and how the weather profile associating with indoor conditions, occupants ' interface with indoor thermal conditions, history of nz building energy conservation, operation scheduling technique, analysis of nature lights and energy saving, hvac modeling, doe2 simulation methodology, layout of the figures, tables, and contents, conclusions and so on are taken as her group ' s own contents and going on research topics
在我的畢業論文草稿里寫下的內容,比如:建築耗能運行,節能模型,建築內部的能效比和節能的關系,表述保持建築物內部的自然環境,提出1992在里約熱內盧地球高峰會議后紐西蘭政府簽署了聯合國fccc協議后的追蹤問題,建築耗能對環境和自然資源的沖擊,使用"生態腳印"的概念來評價建築耗能對自然資源和環境的沖擊,取得天氣剖面圖的方法,紐西蘭的氣候特點及天氣剖面同室內狀況的聯系,建築物內的人員對室內熱力環境的干預,紐西蘭的建築節能史,建築用能模擬運行時刻表編製法,對紐西蘭自然採光和節能的分析,建立暖通空調用能模擬和doe2模擬方法,論文內容,表格和布置,及得出的結論等等,都被這一群人當作他們自己的在使用,以及作為繼續進行的研究課題在使用。The analysis of the peak - shaving of shanghai natural gas
上海城市燃氣調峰分析In order to save oil for ignition and raise cyclic operation capability of utility boilers, eih for oil - free ignition and stable combustion is adopted to de ? gn the burner and experimental system in this thesis
本文根據煤粉氣流的著火理論,針對火電廠節約點火用油和提高調峰能力,採用了電磁感應加熱無油直接點火與穩燃技術設計燃燒器結構和實驗系統。It is concluded that the ground - source heat pumps have the potential to reduce peak demands and total electricity consumption, thus offer better techno - economic viability
結果表明地源熱泵系統在降低空調高峰負荷以及總能耗等方面比空氣源熱泵系統具有明顯的優勢。This software includes five modules, i. e. the module of processing and importing historic data, load prediction model storehouse module, various types of load - predict module, prediction results outputting module, and the module of comparing between gas - storage ability and peak - shaving facility
該軟體包括歷史數據處理及輸入模塊、負荷預測模型庫模塊、各類型負荷預測模塊、預測結果數據庫輸出模塊、調峰負荷與儲氣匹配比較等5個模塊。Chart s engineered tank division supplies lng storage tanks and related equipment to utilities and industry for peak - shaving, base load power generation, and heating applications
查特工程貯罐部門為公共事業及其它行業的燃氣調峰發電供熱提供液化天然氣貯罐及相關設備。分享友人