調峰容量 的英文怎麼說

中文拼音 [diàofēngróngliáng]
調峰容量 英文
peaking capacity
  • 調 : Ⅰ動詞1 (配合得均勻合適) harmonize; suit well; fit in perfectly 2 (使配合得均勻合適) mix; adju...
  • : Ⅰ名詞1. (山的突出的尖頂) peak; summit 2. (形狀像山峰的事物) peak-like thing Ⅱ量詞(用於駱駝)
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  1. With increasing of capacity of power grid, every unit may turn into peak load unit

    隨著電網的不斷增長,各類機組都會參與調
  2. School areas are too large and the schoolyards and green spaces are too small ; classroom construction is not up to national standards ; and classrooms contain too many students. furthermore, the school desks and chairs often are not compatible ; and books, instruments and sports equipment are far from enough. there is a gap between software and hardware in the configuration of audio - visual aids ; and the coefficient of the utilization of existing equipment is low and ineffective

    通過研究發現,西市普通完全中學目前存在著布點不合理,學校規模過大,校園及綠化面積偏小,教室建築規范性差,室內學生納過,課桌椅不配套,圖書、儀器、體育器材嚴重不足,電化教學設備軟硬體配置比例失調,現有教學設備利用率低、效益差,學校管理者教學設施建設中作風浮夸等問題。
  3. Quantity of generating electricity should be also calculated while the river inflow, quantity of water transfer and its duration curve are taken into account. as a company, it is necessary to take a series of measures to increase its benefits while water transfer leads to the decrease of hydro power inevitablly. the efficient methods can be taken into account as follows : i ) to improve the forecast accuracy, to decrease surplus water, and to increase seasonal electricity energy, ii ) to raise the peaking ability of dan jiang kou power station to obtain peaking benefits, iii ) to choose a suitable site to construct a pumped storage plant for peaking benefits

    在進行以上四方面內深入探討的基礎上,論文針對丹江口水利樞紐運行任務、運行方式的重大變化,提出漢江集團應採取以下因應措施以適應企業產業結構的調整,這些措施包括:準確計算發電效益減少值;合理地核算水源的供水成本;以上述兩項計算成果為基礎,核算企業結構調整后總效益變化;提高預報水平,減少棄水,爭取增發季節性電能;研究新的調度方式,提高電站調能力,提高電站的效益;在適當的地點修建抽水蓄能電站,提高電站的調能力。
  4. With the development of electric power industry, it is required that higher dependability to the electric equipment. to improving the peak load capacity of power network, it is the trend that the large capacity steam turbine units take part in peak load operation

    電力工業的發展,對機組設備的可靠性提出了更高的要求,大機組參與調運行更是提高電網調能力的必然趨勢。
  5. As to power generation, it will improve the situation of deficiency of electricity especially shortage of adjustable capacity in peak using time in northwestern china electric network and shanxi electric network

    發電方面,可緩解西北電網和山西電網電力系統電力電不足特別是調峰容量嚴重不足的局面。
  6. In the point of - information theory ; - the - baseband binary pulse amplitude modulated ( pam ) signal transmission, via turning the nonlinear receiver ' s parameters, is studied over an additive white gaussian noise ( awgn ) channel. it is demonstrated that the channel capacity of binary communication systems, for a given signal added noise, can be maximized by optimal designed receivers. this new form of sr is referred to as psr in a broad sense

    本文研究並設計了含有雙穩態隨機共振系統作為一個接收裝置的基帶數字通信系統,在加性高斯白噪聲通道中,通過研究這個非線性接收器的性能,發現了數字信號傳輸中存在的參數調節隨機共振現象?通道隨著系統響應速度的增加具有一個共振值,並對這種非線性現象發生的基本機理進行了解釋。
  7. As well, because of the development of national electric power industry, electric power supply is very enough, the popularize use of electrothermal boilers become possible the actual state of our country ' s electric power development makes the inactive standby capability of dynamos increased, ratio of electric power charge decreased, the difference of power transmission meshwork peak value and valley value become large

    同時由於我國電力工業的迅速發展,電力供應十分充足,為電熱鍋爐的推廣使用創造了有利條件。國內電力發展的現狀造成了機組停機備用明顯增加、負荷率下降、谷差拉大,給電網的調帶來了一定的難度。
  8. This paper analyzes on the influence of adopting the supercritical parameters on the efficiency of the steam turbine unit, probes into the capability of the steam turbine unit with the supercritical parameters, and introduces the peakload performance, reliability and developing prospect of the supercritical steam turbine unit

    分析了採用超臨界參數對汽輪發電機組效率的影響,探討了超臨界參數汽輪發電機組的,介紹了超臨界機組的調性能、可靠性及發展前景。
分享友人