豎河 的英文怎麼說

中文拼音 [shù]
豎河 英文
tategawa
  • : Ⅰ形容詞(跟地面垂直的; 從上到下的) vertical; upright; perpendicular Ⅱ動詞(使物體跟地面垂直) se...
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  1. The enterprising artist has collected the best joropo works for traditional harp and bandola from the andes and the llanos, the great plains of the orinoco and amazon basins, creating a new repertoire full of delightful hints of the spanish baroque harpsichord

    來自哥倫比亞的卡德隆精研荷羅波joropo樂派,她擷取了這種源自安第斯山脈奧里諾科及亞馬遜盆地最優秀的琴及班多拉琴樂章,改寫為充滿西班牙巴羅克式古鋼琴風格的樂曲。
  2. By way of parenthesis, in one - point input method the relation is studied between the response and the correlative coefficient of horizontal and vertical earthquake wave

    本文的多點輸入為順向和向的雙向輸入,附帶研究了單點輸入時雙向地震動相關程度對反應的影響。
  3. We fixed up a short forked stick to hang the old lantern on, because we must always light the lantern whenever we see a steamboat coming down - stream, to keep from getting run over ; but we wouldn t have to light it for up - stream boats unless we see we was in what they call a " crossing " ; for the river was pretty high yet, very low banks being still a little under water ; so up - bound boats didn t always run the channel, but hunted easy water

    我們起一根矮樹杈子,把那盞舊的燈掛了上去,因為每當有輪船往下游開來,我們必須點亮這盞燈,防止它把我們撞翻。不過,有上水的輪船開來,我們不用點燈,除非我們發現自己漂到了人家所說的「橫水道」上,因為水還漲得很高,很低的岸還有一小部分淹沒在水下,因此上水的船往往不闖這個水道,而尋找流得慢一些的水道走。
  4. The second, which was called the rue de la harpe on the left bank, rue de la barilleri in the island, rue saint - denis on the right bank, pont saint - michel on one arm of the seine, pont au change on the other, ran from the porte saint - michel in the university, to the porte saint - denis in the town

    第二條長街在左岸,名為琴街,在老城洲上叫做箍桶街,在右岸叫做聖德尼街,在塞納兩道汊上各有一座橋,一座叫做聖米歇爾橋,另一座叫錢幣兌換所橋,這條長街起自大學城的聖米歇爾門,止於新城的聖德尼門。
  5. With a puff, a clang, and a clatter of rails it was gone

    這些船桅桿聳立,船頭碰擦著有黑色木桿的岸。
  6. Erection of temporary bridge crossing for stream 25 near pak kung au

    遴近於伯公坳設橫渡流編號25的臨時橋
  7. The machine can adopt positive and negative circulation and other deep drilling technique, adapts to various stratum, is the first selected equipment for foundation construction of river ' s bridge and dock, and also adapts to large diameter borehole construction such as tall building, coal mine vertical well and sewage well, it exerts great action many changjiang river large scale bridges foundation construction

    該機可採用正反循環等鉆進工藝施工,適合於各種地層,是江橋梁、碼頭基礎施工的首選設備,也適用於高層建築、煤礦井和污水井等大口徑鉆孔施工,在多座長江大型橋梁基礎施工中發揮了巨大作用。
  8. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    地下連續墻是一種歷史較短的施工方法,目前,砼防滲墻的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用地下連續墻與樁在向荷載作用下的工作性能有相似性,將適用於樁基的poulos彈性理論引入對地下連續墻的沉降計算中;清華大學水利水電工程系濮家騮、于玉貞根據三軸試驗結果確定混凝土的參數,利用非線性e - b模型,結合黃小浪底土石壩設計剖面,採用thepd土石壩總應力程序,對深覆蓋層塑性混凝土防滲墻的應力、位移進行有限元分析,並與普通混凝土防滲墻計算結果加以對比,同時分析了不同配比塑性混凝土特性的影響,並採用應力水平和拉應力數值來判斷塑性混凝土防滲墻的安全程度。
  9. According to the situation on back - salinity at clay interlayer in gansu shule river irrigation area, the improvement technology on drainage salinity through stand - hole was suggested to adopt in shule river irrigation area

    摘要針對甘肅省疏勒灌區粘土夾層土壤的阻水滯鹽作用,提出了孔排鹽改良技術。
  10. Erection of the temporary bridge crossing for stream 33 32

    設橫渡流編號32和33的臨時橋
  11. Erection of the temporary bridge crossing for stream 26 near pak kung au

    鄰近於伯公坳設橫渡流編號26的臨時橋
  12. Continuation of erection temporary bridge crossing for stream 25 near pak kung au

    繼續鄰近於伯公坳設橫渡流編號25的臨時橋
  13. On 30 october 2003, dlois learnt from a memorandum issued by afcd about the excavation works. upon verification of the land status and land use, dlois had taken immediate action, including erecting warning signs and stone posts along the affected stream to stop any further illegal excavation

    離島地政處於二三年十月三十日收到漁護署的便箋,在查證土地擁有權和用途后,已立即採取行動,包括在受影響道上立警告牌及石柱以阻止任何非法挖掘行動繼續進行。
  14. The temple was originally a stone tablet erected on the north shore of yuen chau tsai by villagers of the chik mei village located north of the shenzhen river

    在元洲仔舊政務司官邸旁,建於清朝中葉。廟宇先由深圳北岸的赤尾村民創立,原為一石碑,在元洲仔北岸。
  15. Firstly in the paper the research of hydraulic characters and the optimize of structure have being carried out on the four bigger design schemes of permanent internal dissipation discharge tunnel reconstructed from the right bank ' s diversion tunnel of gongboxia power station with a method of theoretical analysis combined with test comparisons. on this basis, two form swirling flow internal dissipation schemes, vertical and horizontal axis are recommended to the construction unit of the station as the schemes to be selected next

    本文採取理論分析與試驗比較相結合的方法,首先對黃公伯峽水電站右岸導流洞改建為永久式內消能泄洪洞的四個較大設計方案進行了水力特性的試驗研究與體型優化,在此基礎上,向建設單位分別提供了井旋流內消能的推薦方案與水平旋流內消能的推薦方案。
分享友人