負荷分配比 的英文怎麼說

中文拼音 [fēnpèi]
負荷分配比 英文
load sharing ratio
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • : Ⅰ動詞1 (兩性結合) join in marriage 2 (使動物交配) mate (animals) 3 (按適當的標準或比例加以...
  • : Ⅰ動詞1 (比較; 較量高下、 長短、距離、好壞等) compare; compete; contrast; match; emulate 2 (比...
  • 負荷 : [電學] load; charge; weight
  1. The basic thought of the csapfba algorithm is : the edge routers perform the state management per flow, and the edge routers differentiate between the marked flows and the non - marked flows, and the edge routers insert the relevant information into the packet header by using dynamic packet state ; the core routers divide the output link bandwidth into two parts in the light of the state information of the packet header by using class - based queueing, and the core routers allocate proportionally the bandwidth to the marked flows according to their service profiles and the current network load, and the core routers allocate the bandwidth to the non - marked flows according to the principle of max - min fairness, and the csapfba algorithm can adaptively dynamically adjust the bandwidth allocation between the marked flows and the non - marked flows

    本文在csfq演算法的基礎上,提出了一種核心無狀態的自適應的成例公平帶寬csapfba ( core - statelessadaptiveproportionalfairbandwidthallocation )演算法。 csapfba演算法的基本思想是:在邊界路由器完成基於每個流的狀態處理,將所有的流成標記流和非標記流兩種類型,採用dps技術將有關信息編碼進組頭;在核心路由器根據組頭中攜帶的狀態信息採用cbq策略,將輸出鏈路帶寬成兩部,對標記流根據當前的網路按照服務規格成例地帶寬,對非標記流按照最大最小公平性原則帶寬,並且能自適應地動態調整帶寬例。
  2. ( 3 ) it is known that load effect is not consistent with the section resistance incommon section continuous composite beam. a kind of composite beam with itsrational section size is suggested, which is consist of the t shape concrete beam andsteel girder. this kind of composite beam not only has enough carrying capacity, almost has same positive and negative resistance moment, but can decrease theamount of the steel

    ( 3 )析可知連續組合梁的跨中、支座截面處載作用效應及截面抗力規律不匹,本文提出了採用t形混凝土梁和工字鋼代替一般的混凝土板和工字鋼的組合梁截面形式,並給出了截面尺寸例,能使正截面抵抗矩接近,符合組合梁受力特徵,減少了材料用量,滿足承載力和剛度等要求。
  3. This paper deals with the following three topics with regard to the control of multiple manipulators : 1. deprive the kinematics and dynamical equations of two manipulators with identical structure on the basis of geometry theory, one of which has two links, giving the inverse solution to the kinematics of the system which consists of the manipulators and the grasped object ; 2. by use of load - distributing, design a controller coordinating multiple redundant manipulators whose parameters are known

    基於微幾何理論推導出兩個具有相同結構的二連桿機器人的運動學逆解及與物體所成系統的動力學方程; 2在假設由多個冗餘機器人與物體組成系統的動力學模型確知的前提下,利用法,設計了一種不僅能使關節力矩優化且能按照一定的控制器,解決了以往控制器的一些缺陷,即忽視各個機器人的實際承載力,導致一些力小的機器人卻必須承擔較大的載,最終損壞機器人; 3
  4. A common recognized method for the shaft alignment, is to set up a physical model, and appropriately locate each bearing in compliance with the required bearing load, stress and shear force and slop etc, so as to fix the shaft with the curve line as required and obtain a right distribution of bearing load

    對于軸系校中計算,國內外較通用的方法是對軸系相關的要素進行處理,建立物理模型,按照規定的軸承、應力,轉角等限制條件,確定各軸承的合理位置,將軸系安裝成規定的曲線狀態,以達到使各個軸承上的合理
  5. According to a quantitative analysis, concludes that the matching relationship between air changes and cooling load is a major factor in determining the actual temperature difference and isolation coefficient, and that the parameters in isolation ward would play a dominant role

    通過定量析計算,指出隔離病房和緩沖室間的溫差和隔離系數主要由兩室的換氣次數與房間冷的匹情況確定,而病房匹情況的影響要緩沖室大得多。
  6. The results indicate that the contributions and co - payments borne by the high - income population were greater in amount and at a greater rate of increase than those borne by the low - income population after the policy change

    就保費或部擔相對于每人平均所得的例,低所得者的大於高所得者,但是,政策調整后的保費累退性明顯政策調整前的保費擔累退減緩,部擔的累退性也未在政策調整后惡化。
  7. The paper discussed a method combining integer programming based on similarity coefficient with quadratic programming considering ratio of capacity to loading in workshop to obtain parts families and machines groups in two steps

    摘要採用了基於相似系數的整數規劃和考慮車間資源負荷分配比率的二次規劃相結合的方法,兩步得到了零件族和設備組。
  8. Discuss the factor influencing the lsc value : network structure, distributing proportion of load, power supply configuration. analyze every factor by examples

    並深入探討了影響lsc的幾個因素:電網拓樸結構、節點例、電源置,對每個制約因素別進行了算例析。
  9. Load sharing ratio

    負荷分配比
  10. Other users would find load balancing useful because it ' s an intelligent and affordable method for apportioning high volumes of requests for server access across multiple machines, be they on the web or in a data center

    其它用戶也會發現平衡很有用,因為它是一種智能的、一般能擔得起的方法,能把大量對服務器的訪問請求按到多臺機器中,而不管這些機器是在一個網站、還是在數據中心內。
  11. Because existed power flow tracing method is too complex, a new power flow tracing method is put forward, including downstream tracing and upstream tracing. the method accords to proportional sharing principle, then the line flow " constitution of generator and load can be got, as well as relationship between generator and load

    針對現有潮流跟蹤的復雜性,提出了按原則進行潮流順流和逆流跟蹤的演算法,得到線路潮流中各用戶引起的潮流組成以及電源和的供用電關系。
  12. A case study shows that the optimal waste load allocation can achieve water quality standards in stochastic conditions, and the model ' s outcomes are clearly different from those of the conventional deterministic linear programming model

    研究結果表明,污染優化結果能夠滿足隨機條件下的水質達標率要求,並且與傳統的確定性線性規劃模型的結果相有著明顯差別。
  13. The visualization of representative day ( root mean square current, average current and equivalence resistance algorithms ) and allot load according to transform capacity method are realized

    實現了代表日方法(包括均方根電流法、平均電流法和等值電阻法等演算法)和按變容量的方法的可視化。
  14. Zb transformer substation named european style cubical substation, which as a new type of electricity supplying equipment, with more advantages than traditional substation, because of small dimension, compact structure, and decreases the construction cost, at the same time, its installation is very easy, and the supply is very fast, and no need watching people, especially it is into the load center, which is very important for improving the supplying quality, decreasing the loss, improving supplying reliability and reforming electricity network

    Zb型箱式變電站谷稱歐式箱變,作為一種新型供電裝置,它傳統土建變電站具有許多優越性。由於它體積小,佔地面積小,結構緊湊,便於搬遷,因而大大縮短了基建的周期和佔地面積,也減少了基建費用。同時,箱式變電站現場安裝簡單,供電迅速,設備維修簡單,無須專人值守,特別是它可以深入中心,對提高供電質量,減少電能損失,增強供電的可靠性以及對電網路改造都是十重要的。
  15. The duty of real - time system is to provide time constraint guarantees for the real - time applications, in other words, it make the applications access to the resources they need timely. many works have devoted into individual resource scheduling ( i. e. processor capability, disk bandwidth and network bandwidth ). obtaining simultaneous and timely access to multiple resource is known to be a np - complete problem

    大量的研究工作集中在單純的網路帶寬、磁盤帶寬和處理器資源各自的調度優化上,而在同一個節點上同時使用多個資源的是較復雜np完全問題,本文析了一種在資源預留系統( resourcekernel )中解決該問題的途徑,聯合調度服務器( css ) ,並對其中的關鍵問題? ?伸縮量( slacksharing )作出了改進,提出了一種基於當前系統演算法。
分享友人