負荷時間 的英文怎麼說
中文拼音 [fùhéshíjiān]
負荷時間
英文
duration of load application- 負 : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
- 荷 : 荷名詞(蓮) lotus
- 時 : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
- 間 : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
- 負荷 : [電學] load; charge; weight
- 時間 : time; hour; 北京時間十九點整19 hours beijing time; 上課時間school hours; 時間與空間 time and spac...
-
The biggest actionable concern is time to recover from overload
最值得關心的是為了恢復超負荷壓力下的時間。Actually, just in short time can refrigeration systems work in the biggest burthen
實際上,製冷系統只是短時間工作在最大負荷。In the research, a set of simulation equipment is developed to examine the drivers " static and dynamic fatigue. recur to the apparatus, contrast and control experiment are made among different ages, workload intension and workload factors group. the endings summarize as following : ( 1 ) driving sensation fatigue investigation ( investigation of psychological and physiologic index and contrast investigation of fatigue ) ; continuous driving load and discrete driving load investigation of fatigue
? ?門)駕駛疲勞平衡穩定性是通過在力檢測臺上描繪人體重心軌跡的方法,提出檢測駕駛員疲勞平衡穩定指數,在不同狀態下(傾斜度15 30 『以及閉目等狀態下)對不同負荷、不同年齡分別進行測試,建立駕駛疲勞客觀測試評價體系; n )經實驗室研究與現場調查,通過對駕駛疲勞與駕駛時間、駕駛速度等關系的研究,提出了不同年齡、不同條件下的最大連續安全駕駛時間標準,日駕駛時間標準,最大安全行車速度標準等。This paper also tested each model and system - the second loop of qinshan nuclear power station ( the second term ) , computed the balance point , tested the performance of step disturbance and runback loads for system ( no adding adjustment system ) , analyzing the factors effecting the first tiptop rotate speed of turb and time which the rotate speed reach the tiptop
在模擬模型上,完成了穩態計算、系統階躍擾動試驗、甩負荷試驗(未加調節系統)等測試,主要監控和分析了汽輪機動態特性中兩個重要參數:汽輪機第一飛升轉速、飛升時間。Abstract : the paper points out that the main factor influencing residential load variation are the following household appliance : electric cooker, electric shower bath, air conditioner, etc. in peak - value time from inquiry
文摘:通過對住宅用電進行調查,分析了高峰用電時間內大功率家用電器,如電炊具、電淋浴器、空調機等投入是當前住宅用電負荷變化的主要因素。This forms the basis of decision support tools presented for marking up available space, allocating tasks to spaces, and analyzing and optimizing space loading in relation to the critical path - what we call space - time broking
以此概念作為決策支援工具的基礎,便於將適用的空間標示出來,把工作配置給空間,分析空間負荷與要徑之關系本文稱為截斷空間與時間之連結。The cooling or heating loads of different conditioned zones in one system are highly diversified and variable, or the time of operation under low load is long, and the temperatures in conditioned zones need to be controlled individually
同一個空氣調節風系統中,各空調區的冷?熱負荷差異和變化大?低負荷運行時間較長,且需要分別控制各空調區溫度To prepare international standards for electrical energy measuring and electrical load control equipment ( such as watt - hour meters, var - hour meters, maximum demand indicators, telemetering for consumption and demand, equipment for remote meter reading, time switches, equipment for the control of loads and tarifs and consumer services ) including the equivalent electronic forms of these devices and their accessories
負責制定電能測量和負荷控制設備(如:有功、無功電度表、最大需量指示器、損耗和需量的遙測、遠程抄表設備、時間開關、負荷和費率控制設備及用戶服務等)的國際標準,包括功能相近的運用電子技術實現的設備及其附件。Baf has many advantages, such as small volume, little covering earth and hydraulic retention time ( hrt ), high treatment efficiency and effluent water quality, low investment and running cost etc. baf has been used widely for many years in the world and been used to treat several wastewater in our country. in this paper, baf was studied on guanting reservoir water source treatment with pilot scale and homemade expanded clay as filtration media
曝氣生物濾池( biologicalaeratedfilter ,簡稱baf ,或biologicalfiltrationoxidizationreactor ,簡稱biofor )工藝具有體積小、容積負荷高、水力負荷大、水力停留時間短、所需基建投資少、處理出水水質好等特點,國外已廣泛應用,國內也在多個行業的水處理中成功應用。( 2 ) the investigation about driving fatigue of information operation showed if the information become more complex, the reaction seriously reduced, however, fatigue degree increased. otherwise, with the age advancing, the reaction slowed. ( 3 ) an instrument called testing force machine is utilized to correctly illustrate the center of gravity moving track
對駕駛時間負荷、信息負荷進行聯合效應實驗,提出信息復雜度及駕駛疲勞的脈沖效應和u型效應;並進一步提出連續性與離散性負荷的駕駛疲勞問題,為人一車一路系統中以人為核心的優化匹配設。Newer events will be delayed at most five minutes if the provider is under heavy load, assuming they are not dropped because of a full buffer
如果提供程序承擔的負荷繁重,則較新事件的延遲時間最多為5分鐘,前提是這些事件沒有因為緩沖區已滿而被丟棄。Carry out 15 port and starboard turning test with main engine at 100 % mcr, record its steady turning diameter, time and maximum heeling angle
在主機滿負荷的情況下作左及右15回轉試驗,記錄回轉直徑、時間及最大橫傾角。On the point of system, this paper mainly studies the optimal distribution of load in the machines of irrigation and drainage pumping station, the mathematical model and it ' s solution are studied among the machines in pumping station with two types of axial pump : full regulation or semi - regulation. this paper also studies the problems of the optimal day - operation of pumping station and the economical operation of grading pumping station. at the end, jiangdu pumping station is taken as a practical example to show the theory on economical operation of irrigation and drainage pumping station
本文從系統的觀點出發,以排灌站機組間負荷的優化分配研究為主,分別對全調節和半調節軸流泵兩種泵型的排灌站機組間負荷優化分配的數學模型及其求解方法進行了研究,同時對排灌站最優日運行方式及梯級泵站的經濟運行也進行了初步探索,最後以江都排灌站為例,建立了排灌站經濟運行的實用模型。This system adopts cumulatively autoregressive moving average model [ arima ] of time series method and modified model gm ( 1, 1 ) of grey system, makes a local load forecasting modeling through the integration of the above two models and also preprocesses the daily load during the sudden change of climate, thus greatly improving the forecast accuracy. the practical operation indicates that the model is reasonable and easy to operate with complete function
本系統在經過反復試算后,在演算法上採用了時間序列法的累積式自回歸動平均模型( arima )與灰色系統中的gm ( 1 , 1 )改進模型,並將兩種模型組合用於該地區負荷預報建模,另外還對氣候急變日負荷進行了預處理,大大提高了預報準確度。In summer, load is affectd by meteorological elements greatly. based on multidimension time series approach, the car model is constructed, which could take account into the accumalated influence from temperature and inertia action from historic load, meanwhile, the advantage of the model is that its expreaasion is in the form of apparent function, which could provide us some quaqutive imformation existed between input variable and output variable
本文以多維時間序列分析方法為基礎,成功地解決了未來日負荷與前些日負荷慣性變化的影響,以及氣象累計效應的影響顯性函數關系問題,從而為負荷預測人員掌握未來負荷與歷史負荷,歷史氣象要素與當日氣象條件之間的規律,提供了量化的分析基礎。Loss of load cost, energy not severed, net loss and loss of load duration, are considered when deciding which load should be curtailed
最終需要停運負荷點時,切負荷策略綜合考慮了停電損失費用、停電電量、網損和停電時間因素。First, build the building model and air conditioning dynamic cooling load analysis model of the stock exchange in the basis of the experiment. second, calculate the air conditioning dynamic cooling load in summer ( april to october ) hourly by software simulation, obtain the maximum cooling load daily, the minimum cooling load daily, the proportion of each cooling load occupying the total cooling load and cooling load time frequence, analyse them by using twin load curves. last, contrast theoretical calculations with test results, analyse them and prove the model proper
首先,以實驗為基礎建立了證券營業部的建築模型及空調動態冷負荷分析模型;其次,通過逐時逐日計算出了其夏季( 4月? 10月)空調動態冷負荷、各分項冷負荷在空調總冷負荷中所佔的比例及空調冷負荷時間頻數,並運用雙負荷曲線法對每日最大冷負荷與每日最小冷負荷進行分析;最後,與實測數據進行對比,二者曲線基本符合,效果良好,證明所建模型適當。Penetration consistency, expressed as the distance that a standard needle or cone penetrates vertically into a sample of the material under prescribed conditions of loading , time and temperature
針(錐)入度在規定的負荷、時間和溫度等條件下,以標準化的針或錐垂直進入產品試樣的深度來表示的稠度值。Considering the bad prediction of weather and economic data and the difficulty to obtain the data, it ’ s not feasible to contact the load with its influencing factors some times. in fact, the weather information of each month is correlative and be comprised load series
由於氣象、經濟資料的不準確性,以及在季度負荷預測中的難以獲取性,因此將負荷的這些影響因素與負荷之間建立定量的關系有時是不可行的。The base of research on new pattern cooling system is that automotive engine works at 95 % of the hour in the range of part burdens, and that engine flat works in part burdens ; fuel consumption has great relation with cooling water temperature
研究新型冷卻系統的基礎在於,汽車發動機95的時間處于部分負荷范圍內工作,而恰恰在發動機處于部分負荷時,冷卻水溫對燃油消耗率有很大的影響。分享友人