負荷限制 的英文怎麼說

中文拼音 [xiànzhì]
負荷限制 英文
load response
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • : Ⅰ名詞(指定的范圍; 限度) limit; bounds Ⅱ動詞(指定范圍, 不許超過) set a limit; limit; restrict
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • 負荷 : [電學] load; charge; weight
  • 限制 : place [impose] restrictions on [to]; astrict; restrict; limit; confine; shut down on [upon]: 限制...
  1. Though there are a certain level of counteractive impacts to the market power from the price - differentiation agreement and dynamics of demand, the influence of market power cannot be eliminated ; 3 ) in the electricity market, the market power size is greatly influenced by the supply - demand relationship, extent of concentration, and market collusion

    雖然差價合約和需求彈性對市場力有一定的抑作用,但並不能消除市場力的存在。 ( 3 )電力市場的供需關系、市場的集中度以及市場共謀的有效性極大地影響著市場力的大小;發電企業的成本和發電容量的在某種程度上也影響著市場力的實施效果。
  2. The main hardware is the collection equipment, the software is the windows dna framework, distribute calculate resolves the problem of data server down because of heave calculate mission. system provides the mis sub - system base on ie, which make data - query and report forms not limited by the special network. the new module, standard interlink module is aimed at the problem of not pluralize between different system, can make system utility in administrative levels

    系統有硬體和軟體組成,硬體的基礎是採集裝置;軟體採用windowsdna構架,使用分散式計算,解決了原來系統的計算任務過于繁重造成數據服務器不能承擔的問題;服務方面提供基於ie的mis系統,使數據查詢和報表服務擺脫了原來的專用網路的;新增加模塊「標準互連」模塊是針對目前各種自動化系統不兼容的問題而產生的,可以實現電力自動化在更高層次上的實現,在這個模塊中,有意識的採用
  3. They seem to be conditioned by their own work loads.

    他們似乎受到自己的工作
  4. High voltage shunt capacitor installation is comp - rised of capacitor cabinets or steel racks capacitor, special fuses for capacitor overload protection, capaci - tor discharge device, air - cored reactor which is applied to restrain surge current and high frequency harmonic, zno arrester without gaps for overvoltage - limiting and high voltage vacuum switch etc. capacitor cabinet is

    高壓並聯電容器成套裝置主要由電容器櫃或鋼架電容器電容器過保護專用熔斷器放電裝置專用放電線圈或電壓互感器,抑涌流高次諧波的空芯電抗器和過電壓的無間隙氧化鋅避雷器及高壓真空開關
  5. This paper discusses the ability of avoiding maximal power flow of quadrilateral impedance relay and round impedance relay in detail and puts forward the setting principle and setting method of load limiting resistor of backup distance protection

    本文對四邊形和方向圓特性阻抗繼電器躲線路最大潮流的能力進行了詳細分析,提出了距離保護負荷限制電阻的整定原則和整定方法。
  6. Second, this paper analyzes the relation of reactive support service with voltage, power limit curve, transaction amounts. according to the power limit curve, this paper analyzes the source of the reactive cost to get an interzone cost function. using marginal cost theory, it concludes that the reactive spot price is the derivative of the cost function in generator buses

    另外,本文還從發電機角度上分析了無功服務與電壓、功率曲線、發電機向傳輸電能大小的關系;根據功率曲線對發電機無功成本的來源進行詳盡剖析,從理論上確定一個分區間的成本函數;並依據短期邊際成本理論可推出,計算發電機節點的電價可採用無功成本函數的偏導數的方法。
  7. The over - current relay works to protect oscillation tubes and rectifier, when the current exceeds its limits. frequency deviation caused by faulty operation is also prevented

    當電流超過值時,過電流繼電器自動保護振蕩管和整流器,同時可以避免由不當操作所引起的頻率漂移。
  8. 3 > the power - load matching control of pump and diesel is also investigated in this paper, which includes economic working control and load limit control of diesel

    3 、對液壓泵與柴油機之間的功率匹配控進行了研究,其中包括柴油機經濟工作點的控和防止柴油機過載的全程極
  9. This system is based on the limit design method of bearing, emphasize on analyzing, calculating and choosing tolerance of bearing parameter, and as well introduces design and actualizing method of automatic drawing

    系統以「軸承極設計法」作為設計基礎,著重探討軸承參數的分析計算及公差選取,並簡要介紹了圖形自動繪及處理的設計與實現方法。
  10. Tag line restrict swinging of load

    擺動弧度的牽線。
  11. By detailed calculation, the restriction of no. 11 polyester equipment first esterification reactor increasing productivity was analyzed, and the bottle neck of heat transfer capability was indicated

    通過熱量衡算分析了第一酯化反應器的提升度,指出了約傳熱能力的瓶頸。
  12. Secondly, their aims are made the investment of substations, feeders or running cost of electric power system minimum. but they do n ' t take into account of land utilization, street accessibility of right of way, etc., but demands of electric power system. generally, a straight line distance, namely, euclid distance, was used for calculating the distance between a load point and a substation, which is a straight forward but non - practical way for most planning techniques

    其次受研究工具的,這些模型以工程投資、運行費用等最小為目標,僅能考慮導線載流量、電壓降等電力系統技術約束條件,簡化略去了用地、街道可達性等重要的自然約束條件,且求解這些模型的前奏是計算點到變電所的歐幾里得距離(直線距離) ,簡便但不切合實際(這一點在城市電網規劃中尤其重要) ,因此較難給出技術上可行的最優解。
  13. High voltage shunt capacitor installation is comprised of capacitor cabinets or steel racks capacitor, spe - cial fuses for capacitor overload protection, capacitor discharge device, air - cored reactor which is applied to restrain surge current and high freq. harmonic, zno arrester without gaps for overvolage - limiting and high voltage vacuum switch etc. capacitor cabinet is made of highquality cold - rolling steel plate

    高壓並聯電容器成套裝置主要由電容器櫃或鋼架電容器電容器過保護專用熔斷器放電裝置抑涌流高次諧波的空芯電抗器和過電壓的無間隙氧化鋅避雷器及高壓真空開關等設備組成。
  14. The method ' s aim is made the investment of substations and feeder minimum. it can model physical constraints with land utilization and street accessibility and used actual street routes in the substation location and feeder planning, which is important especially in a suburban or city area

    模型包含了用地和街道可達性、可用性等約束,而且在求解模型時用基於動態規劃的最短路演算法確定點到變電所的計及障礙因素的歐幾里得距離(簡稱廣義距離) 。
  15. The timing - and - quantitation precision injection of lpg was realized with high - speed lpg solenoid valve and a set of electronic control system, which was designed by the author and can flexibly control the gas supply system of lpg. based on the analysis of experimental data got by comparing the performances before and after the application of the set of equipment on lr6105q12 diesel engine, the effects of load, speed and replace ratio, etc on the emissions of smoke, hc and co of dual fuel engine were expounded. through optimization, the smoke emission was utmostly reduced and the emissions of hc and co were within the government restriction

    為此,本文通過對各個方案進行詳細比較,選擇了電控多點順序噴射的供氣方案;利用高速lpg噴射閥和自己獨立開發出一套電子控系統對lpg供氣進行靈活地控,實現了lpg的定時定量噴射,並把這套裝置應用到中國一拖生產的lr6105q12柴油機上,在對改裝前後的發動機進行大量試驗和分析的基礎上,闡明了、轉速、摻燒比等因素對雙燃料發動機的煙度、 hc 、 co等排放的影響情況,並且通過優化,最大度地降低了發動機的煙度排放,同時使hc 、 co排放在國家標準規定的范圍之內。
  16. In this paper, the mechanism and practical effect of existing coordinated control schemes are analyzed in detail, the advantage and drawback of the different coordinated control methods in practice are indicated clearly. this paper describes a fact that it is difficult to obtain rapid load response and stable main parameters at the same time by using the recent methods, underlines that heat release is the vital parameter that should be carefully controlled

    本篇在吸取了目前各種協調控系統的優點的基礎上,提出了改進后的協調控方案,主旨為以控鍋爐的熱量釋放信號為核心,採用具有內在穩定特性的控方案,充分加快機組的響應速度,在機組所帶已經接近當時的極,及時輸出功率的增長,達到穩定機組的目的。
  17. Presently most of the theoretical method to predict the propeller - induced hull pressure fluctuation is based on the calculation method in which the pressure is induced by pulsating source in infinite flow. the calculation method is adopted and the corresponded computer program is complied. the propeller - induced hull pressure fluctuation due to blade thickness, blade load, cavity thickness and the change of the cavity volume can be analyzed respectively in the computer program

    目前,螺旋槳誘導的船體表面脈動壓力的理論預報方法,大多是以無流場中點脈動源誘導的周圍流場的脈動壓力的計算方法為基礎的,本文採用該方法編了計算程序,可以分別考慮槳葉厚度、槳葉、槳葉上空泡厚度及其體積變化在船體表面指定位置上產生的脈動壓力。
  18. A common recognized method for the shaft alignment, is to set up a physical model, and appropriately locate each bearing in compliance with the required bearing load, stress and shear force and slop etc, so as to fix the shaft with the curve line as required and obtain a right distribution of bearing load

    對于軸系校中計算,國內外比較通用的方法是對軸系相關的要素進行處理,建立物理模型,按照規定的軸承、應力,轉角等條件,確定各軸承的合理位置,將軸系安裝成規定的曲線狀態,以達到使各個軸承上的合理分配。
  19. Specification for netting and fibre rope load restraint systems in surface transport

    地面運輸用網和纖維繩索負荷限制系統規范
  20. It provides steady lifting with low noise, and is equipped with lifting brackets, anti - fall supporting protection, stopping protection against wire fracture, limiting device for maximum load, control device for maximum lifting height and fixing device for the turning angle of the bracket arm

    升降平穩、噪音低,並設有舉升托架、防跌落支承保險、鋼索斷裂動保險;最大定裝置和托臂回轉角度鎖定裝置。
分享友人