負載容量 的英文怎麼說

中文拼音 [zǎiróngliáng]
負載容量 英文
deadweight capacity
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 負載 : [電學] load
  1. This thesis focuses on middleware - based load balancing supported by corba, and has made the following contributions : ( 1 ) based on the previous research, we give a method using resource utilization and harmonic mean performance to quantify the load of each node in the heterogeneous environment, which makes the loads comparable

    本文的主要研究內就是基於corba中間件的均衡,具體的研究工作有以下幾點:探討了系統的衡問題,借鑒前人的研究成果,採用以資源利用率和節點的調和性能平均值來綜合衡系統的方法,化了異構系統中各節點的性能,使得具有可比性。
  2. Methods of test for ancillary components for masonry - determination of tensile and compressive load capacity and load displacement characteristics of wall ties couplet test

    圬工輔助砌塊的試驗方法.墻拉桿的拉伸和壓縮負載容量轉移特性的測定
  3. Methods of test for ancillary components for masonry - determination of tensile and compressive load capacity and load displacement characteristics of wall ties single end test

    圬工輔助砌塊的試驗方法.墻拉桿的拉伸和壓縮負載容量轉移特性的測定
  4. Methods of test for ancillary components for masonry - part 5 : determination of tensile and compressive load capacity and load displacement characteristics of wall ties couple test

    圬工輔助成份試驗方法.第5部分:拉伸和壓縮負載容量和墻系柱和代替特性測定
  5. Methods of test for ancillary components for masonry - part 6 : determination of tensile and compressive load capacity and load displacement characteristics of wall ties single end test

    圬工輔助成份試驗方法.第5部分:拉伸和壓縮負載容量和墻系柱和代替特性測定
  6. Methods of test for ancillary components for masonry - determination of shear load capacity and load displacement characteristics of shear ties and slip ties couplet test for mortar joint connection

    圬工輔助砌塊的試驗方法.剪切桿和滑動桿的拉伸和壓縮負載容量轉移特性的測定
  7. Methods of test for ancillary components for masonry - part 7 : determination of shear load capacity and load displacement characteristics of shear ties and slip ties couplet test for mortar joint connections

    圬工輔助成份試驗方法.第7部分:拉伸和壓縮負載容量和墻系柱和代替特性測定
  8. Contact capacity resistive load ac220v 3a, dc 24v 3a

    觸點阻性ac220v 3a dc24v 3a
  9. Finding a feasible and efficient load balanced strategy for the ultra - scalable multi - plane multi - stage switch architecture is a top of nowadays research. the dissertation proposes a two - stage load balanced scheme for the ultra - scalable multi - plane multi - stage switch architecture based self - routing and non - blocking permutation benes network. the approach uses reasonable and efficient logical queueing strategy and schedule scheme in ingress traffic managers and switch planes to realize the two - stage load balancing of ip traffic which for different destination addresses

    本文提出一種適用於基於完全可重排無阻塞benes拓撲構建的多平面多路徑(多級)超大交換結構的兩級均衡策略,通過在輸入流管理器和benes交換平面內部實施合理而高效的隊列組織調度方法,有效實現了基於不同目的地址的ip流在兩個層次上的均衡,較好彌補了ciscocrs - 1系統在平面選擇和中間級選擇時所採用的簡單隨機或輪循方案的不足。
  10. This dissertation focus on the load balancing of signaling gateway, mainly inculde two part : in first part, considered trillium dft architecture, the dissertation presents a scheme suited for signaling gateway, involving software design and implement of m3ua distributed module df and mtp3 distibuted module ldf ; the second part presents the design details of m3ua and mtp3 protocol themselves load balancing mechanism. at the end of this dissertation, a performance test result of based on load balancing signaling gateway are given

    本文著重於討論信令網關均衡設計與實現,主要分為兩個部分進行闡述,第一部分根據trillium分散式系統架構,提出適合大信令網關中ss7和m3ua協議均衡的解決方案,並詳細給出m3ua協議側分散式模塊df的軟體設計、實現過程; mtp3協議側分散式模塊ldf的軟體設計,模塊劃分,介面定義,流程圖實現;第二部分提出了m3ua和mtp3協議體內的均衡解決方案,並詳細介紹了其設計實現。
  11. Methods of test for ancillary components for masonry - determination of shear load capacity of welds in prefabricated bed joint reinforcement

    圬工輔助砌塊的試驗方法.預制基地加固處接頭的剪切負載容量的測定
  12. Methods of test for ancillary components for masonry - determination of load capacity and load - deflection characteristics of joist hangers

    圬工輔助砌塊的試驗方法.小梁吊架的負載容量偏轉特性的測定
  13. First, mathematical model of swaying system is made, which is a basis on later chapters. meanwhile, the system is simulated and designed. the effect of loaded mass, loaded suppleness, general leaking coefficient and cubage elasticity modulus on performance of system is also analyzed

    首先,作者建立了橫蕩控制系統的數學模型,作為以後各章節討論的基礎,同時對系統進行模擬和設計,並研究了系統剛度、總漏損系數和積彈性模數對系統性能的影響。
  14. Dc input voltage ; output voltage ; frequency ; load capacity

    直流輸入電壓,交流輸出電壓,頻率,負載容量
  15. Power cables - part 1000 : current - carrying capacity, general, conversion factors

    電力電纜.第1000部分:電流負載容量總則換算系數
  16. Line, inverter, bypass, fault, battery load level

    市電,電池供電,旁路,負載容量,系統異常
  17. Methods of test for ancillary components for masonry - determination of load capacity and load deflection characteristics of brackets

    圬工輔助砌塊的試驗方法.固工夾的負載容量偏離特性的測定
  18. Methods of test for ancillary components for masonry - determination of load capacity and load - deflection characteristics of straps

    圬工輔助部件的試驗方法.固定夾板的負載容量偏離特性的測定
  19. Methods of test for ancillary components for masonry - part 4 : determination of load capacity and load - deflection characteristics of straps ; german version en 846 - 4 : 2001 a1 : 2004

    圬工輔助部件的試驗方法.第4部分:固定夾板的負載容量
  20. The web container - in the case of geronimo, this can be either jetty or tomcat - must coordinate with the web containers of other cluster nodes to share user session information and load measurements

    Web器對于geronimo來說,可能是jetty或tomcat必須與其他集群節點的web器協作,共享用戶會話信息和
分享友人