負載時間 的英文怎麼說

中文拼音 [zǎishíjiān]
負載時間 英文
load time
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • 負載 : [電學] load
  • 時間 : time; hour; 北京時間十九點整19 hours beijing time; 上課時間school hours; 時間與空間 time and spac...
  1. The actual delays depend on line speed and system load

    真正的延遲依賴于線路的速度和當的系統
  2. Dns round robin. the reason for this request is that some public time servers as listed somewhere on ntp. org are having problems with too much traffic

    這么做的原因是因為一些開放公眾存取的伺服器如被列在ntp . org中的有過重的問題。
  3. But the grid voltage is different in many countries, so the research of an inverter, which can be used in many countries, will become a trend. a grid - connected inverter in grid - tied and off - grid modes has many advantages such as peak shaving to reduce the overall cost of power by generating during peak load hours in grid - tied mode, and standby generation to provide power during system outages until service can be restored in off - grid mode

    由於世界各國電網電壓的規格繁多,能夠研製出適合於多個國家電網電壓規格的逆變器將是未來發展的一種趨勢;獨立與並網雙模式運行的逆變器由於具有緩解電網用電緊張、減少發電站的發電量、在電網斷電起不斷供電的作用等優點,也成為現在研究的一個熱點。
  4. Finding a feasible and efficient load balanced strategy for the ultra - scalable multi - plane multi - stage switch architecture is a top of nowadays research. the dissertation proposes a two - stage load balanced scheme for the ultra - scalable multi - plane multi - stage switch architecture based self - routing and non - blocking permutation benes network. the approach uses reasonable and efficient logical queueing strategy and schedule scheme in ingress traffic managers and switch planes to realize the two - stage load balancing of ip traffic which for different destination addresses

    本文提出一種適用於基於完全可重排無阻塞benes拓撲構建的多平面多路徑(多級)超大容量交換結構的兩級均衡策略,通過在輸入流量管理器和benes交換平面內部實施合理而高效的隊列組織調度方法,有效實現了基於不同目的地址的ip流量在兩個層次上的均衡,較好彌補了ciscocrs - 1系統在平面選擇和中級選擇所採用的簡單隨機或輪循方案的不足。
  5. This methodology will enable designers to map network - processing applications onto the current np architectures without the time consuming process of manually optimizing through experimentation. it will accelerate the design flow for products, leading to shorter design turn around time

    在基於多處理器的實優化調度上,提出了一種基於包處理預測的均衡哈希調度演算法flbhda ( forecasting - basedloadbalancehashdispatchalgorithm ) 。
  6. In the experiment of varistor bleeder circuit, the successful load of equal voltage requires that the relation between load and varistor be correctly defined, so as to choose appropriafe experimental instrument

    摘要在變阻器分壓電路實驗中,要求得到均勻變化的電壓,怎樣確定與變阻器之的關系,以便在實驗中正確選擇實驗儀器。
  7. In the leach - new protocol, the mainly improvement of the leach protocol exhibits as follow : for the sake of balancing the network load, the network choose the clusters based on the residual energy ; we take multi - hop communication between sensors instead of single - hop communication, which results in the reduction of energy consumption of clusters ; the new protocol finds the path to the cluster head with the minimum cost, using an algorithm similar to flooding to propagate the cost information and greedy algorithm to find the lowest cost link ; the algorithm for assigning tdma time slot reduces overall delays of network

    在leach - new協議中,對leach協議的改進主要體現在以下幾個方面:根據節點剩餘能量選擇簇頭,以平衡網路;節點採用多跳路由,降低簇頭能量消耗;節點根據能量消耗的代價來選擇至簇頭的路由,通過擴散演算法來廣播代價消息,採用貪婪演算法來選擇能量消耗最小的路徑;採用tdma隙分配演算法減少網路延。最後,利用ns2模擬軟體進行驗證。
  8. If the total test duration is shorter than the time that is required to step up to the maximum user load, then the test stops after the elapsed duration and does not reach the max user count target

    如果總的測試持續比逐步增加到最大用戶所需的短,則經過測試持續后,測試將停止,並且不會達到「最大用戶計數」目標。
  9. Equipped with electronic controller fini tronic and preset for remote control for two or more compressors. it offers working pressure and oil mist separator tank inner pressure indication, separator filter clogging lashing alarm before overpressure e - stop, electric motor temperature control, maximum screw assembly temperature control, air temperature on pressure end indication, electric motor direction of rotation check, time to scheduled maintenance term, total operating hours and operating hours under load, alarm log of last five failure events

    並預設為丙臺以上空壓機聯機遠程控制,有工作壓力和油氣分離器罐內壓指示,分離器過濾器阻塞報警,電機溫控,螺桿總成溫控,壓力端空氣溫度指示,電機轉向檢查,維護周期油,油過濾器,空氣過濾器,分離器過濾器,總運行運行,記錄上五個報警故障等。
  10. It offers working pressure and oil mist separator tank inner pressure indication, separator filter clogging flashing alarm before overpressure e - stop, electric motor temperature control, maximum screw assembly temperature control, air temperature on pressure and indication, electric motor direction of rotation check, time to scheduled maintenance term, total operating hours and operating hours under load, alarm log of last five failure events

    並預設為丙臺以上空壓機聯機遠程控制可檢測包括操作壓力油氣分離器罐內壓,電機溫度和轉向,螺桿總成溫度過濾器堵塞報警等參數,並可顯示總運行運行
  11. Finding a way to incorporate non - chronicle factors into the load forecasting mechanism and thus enhance the forecasting accuracy is the objective of this thesis

    為了因應不同預測的對象而提升其預測能力,本文採用類神經網路搭配?歸序列演演算法建構混合型的預測模型。
  12. Abstract : the measuring method of the temperature field of the net belt furnace during static non - gas loading, gas loading and dynamic gas loading states is described. the running time measurement during both cold and hot states, non - loading and loading states are discussed and analyzed

    文摘:介紹網帶爐在靜態不充氣、充氣及動態充氣等狀態下,溫場的測量方法;並就冷態空運行及加熱空運行的測量進行討論和分析。
  13. You should generally run several runs with different step durations and step user counts so that you can get good measurements for a given load

    通常應運行具有不同的單步持續和單步用戶計數的幾個運行,這樣在給定的下可以準確地衡量。
  14. When the governing valve was series - connected on the return oil - line in the metering - out control system, under the same flow area and the same adjusted pressure of relief valve, with the incremental quantity of step load, the pressure highly - adjusted capacity of the hydraulic cylinder chamber with piston - rod increased, meanwhile, it ' s time of rise, time to peak and the governing time all increased. at the same time, the pressure highly - adjusted capacity of the hydraulic cylinder chamber without piston - rod increased

    當出口節流調速系統的回油路上串接調速閥,隨階躍的增加,在相同流量閥開度、相同溢流閥調節壓力的情況下,液壓缸有桿腔壓力p _ 2 ( t )的超調量是增加的,上升、峰值以及調整也是增加的;液壓缸無桿腔壓力p _ 1 ( t )的超調量是增加的。
  15. One of the main problems in pdes is how to partition the network simulation workload to decrease the time needed to complete the simulation and improve performance of simulation. here a new optimized partition algorithm was put forward, which first analyses the performance factors of parallel simulation and then constructs a performance estimation model for partition ; based on this model, it mends the graph partition algorithm to consider all factors, including simulation applications and simulation environments. optimized factors are workload balance 、 communication cost and time window of lookhead

    鑒于基於傳統圖劃分演算法的任務劃分工具存在諸多不足,本文提出了并行網路模擬任務的優化劃分方法,其思想是:首先從pdes機制出發,分析影響并行網路模擬性能的各種因素並建立一個能夠綜合考慮各種因素的并行網路模擬性能估計模型;其次,改進多級圖劃分演算法,使得演算法具有綜合考慮模擬應用與模擬運行環境,同在優化過程中使用性能估計模型指導劃分,實現對影響并行網路模擬性能的三個因素(包括均衡、通信開銷、安全窗口長度)的優化能力;最後,結合併行網路模擬性能估計模型與改進的多極圖劃分演算法,實現了并行網路模擬任務的優化劃分。
  16. Studied the liquid - phase synthesis of butyl acetate from n - butyl alcohol and acetic acid using the supported heteropoly blue as catalyst. examed several factors imposing on esterification. the results revealed : using this catalyst, the reactions conversion percentage reaches nearly 100 %, product yield is 98. 9 %, selectivity is 98. 9 %. reusing it 10 times, the efficiency is still well. in addition, using this catalyst, the reactions temperature is mild, the reaction time is short and the equipment hasnt any erosion. furthermore, there is no “ threewastesdischarge

    對以型雜多藍為催化劑的乙酸與正丁醇的液相酯化反應進行了研究.考察了影響酯化反應的因素.結果表明:以型雜多藍為催化劑,酯化反應轉化率接近100 % ,收率可達98 . 9 % ,選擇性為98 . 9 % ,重復使用10次催化效果仍好.該催化劑還有反應條件溫和、反應短、對設備無腐蝕、無三廢排放等優點
  17. Thirdly, it simulated the pumping circuit & dividing circuit with the widely used software matlab / simulink. the displacement of the rod piston and the impact of hydraulic are analyzed in the different input flow ( frequency of pump ) and different reversing time. it found out the cause of hydraulic impact ( one - to - one incorrespondence between the response time of dividing circuit and the operation time of rod piston ), and gave some methods to weaken hydraulic impact. in the final part of the paper, the reliability of the theory analysis is further verified by the experiment of hydraulic system

    首先在流變學原理的基礎上,深入分析混凝土在輸送管道內的流動狀態,得出混凝土泵的特性方程;然後根據功率鍵合圖的建模方法,建立泵送迴路和分配迴路的數學模型,並運用模擬軟體matlab simulink對泵送和分配迴路模型進行了模擬,分析了在不同的輸入流量(泵送頻率)和換向下,活塞桿的位移和系統的液壓沖擊情況,找到了引起液壓沖擊的根本原因(即分配迴路的響應(固定值)與活塞桿的運動(變化值)不相匹配) ,並提出了相應的改進方法。
  18. The capacitor has advantages of low dissipation, high insulation resistance, good self - healing character, and steady electricity performance, anti - striking current, strong over - carrying capacity, etc. it is assembled sith inner hidden discharge resistance. it is applied in high or low pressure sodium lamp and mercury - arc lamp for the help of power factor compensation

    斷開電流允許:在0 . 5秒內的8個半周波前跳閘絕緣電壓ul1699第59節:線路與1000v , 1分鐘
  19. No - load time

    負載時間
  20. Windows 2000 security patch : smtp rollup windows 2000 security patch : domain account lockout vulnerability

    Windows 2000修補程序:在高系統訪問軟盤出現數據破壞
分享友人