資源單位 的英文怎麼說

中文拼音 [yuándānwèi]
資源單位 英文
resource units
  • : Ⅰ名詞1 (錢財; 費用) money; wealth; expenses 2 (資質) intelligence; endowment 3 (資格) quali...
  • : 名詞1. (水流起頭的地方) source (of a river); fountainhead 2. (來源) source; cause 3. (姓氏) a surname
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • 資源 : natural resources; resource
  1. How robust and sustainable is a particular configuration of users, resource system, resource units, and governance system to external and internal disturbances

    對于來自外界的和內在的干擾,由使用者、系統、資源單位和管理系統組成的某一特定結構有多麼穩固和多大的可持續性?
  2. If you assign a resource group - for example, a group of three painters - at 100 percent, it means only one of the painters is assigned to the task. if you assign all three painters, it would be 300 percent

    如果將一個組(譬如有三個粉刷工的工作組)分配為100 % ,則意味著只給這個任務分配了一個粉刷工;如果要將全部三個粉刷工都分配給該任務,則資源單位應為300 % 。
  3. The key elements of urban tourism place planning and design comprises a urban destination region, urban tourist generating markets, urban nodes, urban districts, urban circulation routes, and urban gateways. this paper makes preliminary researches on urban tourism spatial structure and its space planning and design. the study conclude mat the evolvement of urban tourism research, the key elements of urban tourism spatial structure, the growth and evolvement of urban tourism spatial structure, the urban tourist flows and its spatial structure, urban leisure spatial structure and urban recreational business districts, the development recreational belt around metropolis, the elements affecting urban tourism place planning and design, urban tourism sustainable development and its spatial development strategies and the models of urban tourism place planning and design, etc. at the last of this paper, combinations of these researches are used in the changzhou urban tourism place planning and design

    本論文對城市旅遊研究概況、城市旅遊空間結構研究的關鍵要素分析、城市旅遊流空間結構、城市休閑空間結構與城市遊憩商業區的開發與發展、城市環城遊憩帶的開發與發展、城市旅遊空間規劃布局的、區、市場和社會經濟等影響和制約因素、城市旅遊空間規劃布局的八大模式: diannedredge ( 1999 )的節點、多節點及鏈狀節點城市旅遊微空間規劃布局模式、旅遊城市中心結構的規劃布局模式、增長極模式、點? ?軸模式、城市旅遊圈層模式、環城遊憩帶城市旅遊空間布局規劃模式及如何運用城市旅遊空間發展戰略優化城市旅遊生態環境等方面作出了初步研究,並以常州市為例進行了城市旅遊空間結構分析優化及其空間規劃布局的實證研究。
  4. Displays resource information, including resource group, resource unit, standard rate, overtime rate, cost per resource use, accrual method, and resource code

    顯示信息,包括組、資源單位、標準費率、加班費率、每次使用的成本、成本累算方式和代碼。
  5. A method used by microsoft project to calculate task work, duration, and resource units

    Microsoftproject用來計算任務的工時、工期和資源單位的方法。
  6. A task in which the assigned units ( or resources ) is a fixed value and any changes to the amount of work or the task ' s duration do n ' t affect the task ' s units

    分配的(或)保持不變的任務,對工時或任務工期的任何更改都不會影響分配給任務的資源單位
  7. Url univeral resource location

  8. Assigning a resource at 100 percent units means you want the resource to give all available working hours to the task

    指定某資源單位為100 % ,意味著要讓該用所有的可用工作時間來從事該任務。
  9. To increase the resource units assigned to a task

    如果要增加分配給任務的資源單位
  10. That percentage is known as resource units

    這個百分比稱為「資源單位」 。
  11. The resource units you assign to a task

    分配給任務的資源單位
  12. Resource units per assignment

    每個工作分配的資源單位數目
  13. The number of units or the quantity of a resource assigned to a task

    分配給任務的資源單位數或數量。
  14. Instead, adjust the amount of work for the resource or resource units

    反之,應該調整資源單位的工時數量。
  15. Resource units indicate the percentage of the resource ' s time allocated to the task

    資源單位表示分配給該任務的工作時間的百分比。
  16. 2. in the task name field, select the task for which you want to increase resource units

    2 .在「任務名稱」域中,選擇要增加資源單位的任務。
  17. For information about resource units, see chapter 8, " assigning resources to tasks.

    有關資源單位的詳細信息,請參閱第8章「給任務分配」 。
  18. It does not apply to microsoft project ' s calculation rules when changing work, duration, and unit values for resources already assigned to tasks

    更改已分配給任務的工時、工期和資源單位值時,它不會用於microsoftproject的計算規則。
  19. If additional units of the same resource are available, you can increase the number of resource units assigned to a task

    如果同一有可用的額外,則可以增加分配給該任務的資源單位
  20. It is our hope that by informing potential users of what materials are already available and helping libraries and other organizations target areas where digitalization efforts have lagged, we will be able to promote the effective use of research materials in the field of sinology

    透過本次會議的召開,將促使世界主要漢學典藏機構間的訊得以更廣泛的交流、各圖書館等之間亦可以順利的互通有無,進而擴大漢學的有效運用,俾益漢學研究的發展。