跨架置 的英文怎麼說

中文拼音 [kuàjiàzhì]
跨架置 英文
straddle mounting
  • : 動詞1 (抬起一隻腳向前或向左右邁) step; stride 2 (兩腿分在物體的兩邊坐著或立著) bestride; stra...
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  1. This paper deduces the equation groups of large span steel truss bridge which installed mr dampers of coupling vibration of vehicles and bridge. and provide the two strategies of semi - active control

    本文從理論上首次推導出設擬況阻尼器的大度鋼析橋梁車橋禍合振動的系統受控方程並提出了兩種控制策略。
  2. The experiment procedure and analysis result about exteriorly extended end - plate connection with high strength bolt are introduced primarily ; each sample ' s dimension is given. the adding load equipment, measuring apparatus placed, measuring point established is detailed. adding load measure load and m - curve is produced ; the single span gabled frames horizontal displacement formula is deduced when the horizontal concentrated force is applied to it

    重點介紹了外伸端板高強螺栓連接的實驗過程及實驗分析結果,介紹了各組試件的形狀尺寸、加載裝、測量儀器安放、測點的布等;給出加載方式及測出的m -曲線;計算出試驗節點的初始剛度;推導水平集中力作用下單門式剛考慮節點半剛性的側移計算公式。
  3. It is designed a contrast experiment on two sets of two - span and two - story rc frames under low cycle reversed loading, one frame has construction joints while the other has not

    摘要對一組留施工縫,一組未留施工縫的兩組單榀兩層兩結構進行了低周反復荷載作用下的試驗研究,對兩組框的滯回性能、延性、剛度退化等性能作了深入的分析。
  4. Analysis and discussion on layout scheme of prestressed bars for transfer structure with large - span laminated open - web truss

    對大度疊層空腹桁轉換結構預應力筋布方案的分析與討論
  5. This paper also presents the methods of controlling unstressed length of cable, pre - displacement of saddle, anchor span tension, erection of wire strands, the fixed position for erecting cable band and cable length. determination and control approach of displacement of saddles during cable erection are also introduced. at the same time, the change course of linetype during construction period for suspension bridge is analyzed

    再次,介紹了懸索橋的施工控制內容與方法,利用軟體sgkz2000對多座懸索橋進行了施工計算,提出本文關于懸索橋的主纜無應力長度控制、索鞍預偏量控制、錨張力控制、絲股設控制、索夾安裝位與吊索長度控制的方法;介紹了吊梁階段鞍座頂推量的確定與控制方法,分析了施工階段懸索橋的線形變化過程。
  6. For the first time, based on frame structure with large thick raft plinth and many engineering examples, analytic method of interaction that means the analysis on three parts above as a whole with a full consideration of interaction thereof that met the need of the deformation correspond on the boundary was used to research on the interaction of structure and groundsill in this paper. and five models were adopted, which were : ( 1 ) a tube with symmetrical double - axis structure and symmetrical loads, ( 2 ) two tubes with symmetrical double - axis structure and symmetrical loads, and ( 3 ) a tube with symmetrical single - axis structure and symmetrical loads, and ( 4 ) two tubes with symmetrical double - axis structure and unsymmetrical loads, and ( 5 ) two tubes with unsymmetrical structure and loads. based on the middle - thick slab theory from mindli and the model for groundsill from winkle, the deformation character of raft foundation and the distributing rule for resisting force of fundus were studied in details by using b ig - style fem ( finite element member ) software, ansys

    本文結合了大量的工程實例,以大底盤框厚筏結構形式為研究對象,針對單個和多個塔樓布於同一個大底盤框厚筏基上的復雜結構體系,分( 1 )一個塔樓:結構布雙軸對稱,荷載對稱的情況; ( 2 )兩個塔樓:結構布雙軸對稱,荷載對稱的情況; ( 3 )一個塔樓:結構布單軸對稱,荷載對稱的情? ; ( 4 )兩個塔樓:結構布雙軸對稱,荷載不對稱的情況; ( 5 )兩個塔樓:結構布和荷載均不對稱的情況等五種組合情況,全面系統地探討了上部結構?基礎?地基相互作用的大度基礎、基礎板變形特徵及其基底反力的分佈規律。
  7. The paper describes the main techniques in the integral sliding construction for large span structure, which includes jacking scheme, plan layout, assembly, transport and stacking of components, setting of sliding system, setting of track, conformation of falsework, traction facility etc. discusses emphatically the sliding falsework, which includes the material, conformation, manufacture, welding and assembling of the shape steel tape falsework

    系統分析了大度鋼桁整體滑移施工中的起重吊裝機具的選擇與布、施工平面布、桁結構拼裝單元及滑移單元劃分、滑移施工方案及工藝流程、桁的連接、拼裝運輸、及堆放、滑移軌道布、滑移滾輪構造、延伸平臺布以及滑移牽引系統等諸多工藝問題。
  8. In tall buildings, for frame - shearwall structure with steel truss transfer story with large span, studies on its dynamic characters and seismic performance are performed. with different transfer story location at the structure, the difference analysis about the structures to period and mode, displacement, and shear etc. is performed in detail. and the vertical load effect to the steel truss transfer story with large span is analyzed

    對于高層建築中帶大度鋼桁轉換層的框?剪力墻結構,分別對不同轉換層設高度下整體結構的動力特性和抗震性能進行了分析,對整體結構的周期和振型、整體結構的位移和層間位移、結構的剪力和層間剪力等方面性能的差異進行了研究;對大度鋼桁轉換層在豎向地震作用下對其受力的影響進行了研究。
  9. Then, under the framework of related theories, this paper analyzes the motives of human resource allocation in fdi to china and their chance to be effective when combining with the realities in china. thirdly, the paper goes on to talk with chinese enterprises " using them for reference to make self - development

    其次,在以上理論分析的框下,進一步分析國公司對華直接投資中的人力資源配動機,以及在華國公司如何利用自身的人力資源優勢,結合中國的實際情況對其人力資源進行有效的配以獲得發展機會。
  10. In the light of the deficiency of the routine calculating method in the application of multi - curve style prestress steel bar in the large span structures, an applied program is written to calculate the loss of the prestress. fem is used to calculating the concrete stress of the frame beam under prestress load, in the process of which, many successful improvements have been made in the element division, load application and the treatment of the support restraint

    針對常規計算方法在大結構中預應力筋多波曲線配應用中的不足,編制了計算預應力損失的應用程序;用fem計算了框梁在預應力載荷作用下的混凝土應力,其間在單元劃分、載荷施加及支座約束處理上有成功的改進。
分享友人