路基斷面 的英文怎麼說

中文拼音 [duànmiàn]
路基斷面 英文
roadbed section
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : Ⅰ動詞1 (分成段) break; snap 2 (斷絕;隔斷) break off; cut off; stop 3 (戒除) give up; abstai...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • 路基 : bed; roadbed; subgrade; substructure
  • 斷面 : section; fracture surface; plane of fracture
  1. Through analyzing the 324 highway ' s partial cement concrete road surface, sloping slurry, escapes spatial, bridge head jumps off, roadbed subsidence and so on, the grouting technology is proposed

    摘要分析某國道段部分水泥混凝土板、唧泥、脫空、破碎及橋頭跳車、沉降等主要病害,提出採用灌漿技術來解決。
  2. ( 2 ) based on bdi modal, the main function of diagnostic agent is implemented in three aspects : as cbr ( case based reasoning ), production diagnostic system and artificial neural network, these three methods mentioned above are processed step by step

    ( 2 )以bdi結構模型為礎,從cbr (於實例的推理) 、產生式診系統和神經網系統三個方實現了診agent的診功能。
  3. To solve the inaccuracy problem caused by the two existing methods ( average end - area method and prismoidal method ) used for the calculation of roadway earthwork volume, this paper puts forward a new concept of the 3 - dimensional algorithm that takes all the roadway geometric design procedures as a kind of geometrical operation between the ground model ( original terrain model ) and the roadway model ( designed model ) under certain constraints, and then presents a complete 3 - dimensional algorithm of roadway earthwork volume as well as its executable computer program. the algorithm benefits from the re - triangulation technique of constrained delaunay triangulation ( cdt ), which can yield a true volume value theoretically. through a number of practical tests covering varied intervals between adjacent cross sections, it is proven to possess a higher accuracy compared with that of traditional methods. all the work involved in this paper indicates that the 3 - dimensional calculation of roadway earthwork volume is feasible, more accurate and should have further application in practice

    針對目前廣泛使用的道土方量計算方法平均法和稜柱體法計算不準確的缺點,提出了三維土方量計算演算法的概念.該演算法以帶約束的狄羅尼三角化( cdt )為技術核心,認為所有道幾何設計過程都是地模型和道(設計)模型進行幾何運算的結果.於此,本文設計出相應的演算法步驟,同時完成了相應的軟體開發,使得該三維演算法能和傳統的方法進行對比.此外,結合工程實例,採用了不同的道間距對三維計算方法和傳統方法的誤差進行比較、分析.結果證明三維演算法具有更好的精度,該演算法可用於道、場地平整等工程土方量計算
  4. Variance index of the settlements of soft clay subgrade was inducted to analyze the asymmetry settlement rules under the influence of depth of fill, fill speed, geologic types of soft clay etc

    利用這些觀測數據,引入中點和兩側坡腳地3點沉降的方差這一統計學指標,詳細分析了地質結構,填築速率、填築高度以及硬殼層等因素對軟不均勻沉降的影響,得到了一些有意義的結論。
  5. The curves of the consolidation settlement in soft clay base of flood land are gained, which compare the effect of sand drain. the settlement - time curves in different period are also gained, which increase the height of embankment to 8m, based on the test data of hang - yong highway. furthermore, the consolidation settlement characters of these entity engineering are analyzed, and, the variation rules of the rate of grade and degree of the curves in different period in the whole section, the maximal settlement and the liner regression relations between the rate of grade and degree are calculated

    本文利用大變形固結有限元分析程序( lscfea )中的小變形平固結分析單元( sse2 ) ,結合實體工程項目進行了地固結沉降的有限元計算,分別得出河灘相軟土地在考慮砂井和未考慮砂井作用下的固結沉降曲線及杭甬高速公試驗段在高堆載情況下的固結沉降曲線;並對以上曲線特徵進行了分析,得出各時間段曲線斜率、角度在整個的變化規律,以及沉降最大值與斜率、角度變化之間的線性回歸關系。
  6. Seismic survey is a new method used to civil engineering area in recent years. it was widely applied to survey or detecting of roadbase, dam base, foundation of building, tunnel, river bed, lake bed and etc. the chief methods are reflection method, refraction method, wave velocity testing, surface ware survey and transverse wave suivey. seismic survey can divide different layer, measure the incidence of sediment stratum, detect the structure of rock, test the handle effect of surface wave survey, we can calculate the carrying capacity of foundation and other mechanical parameters. this technique can give service to some big engineering departments such as highway developing company, survey design company, water supply company, plan bureau, construct bureau etc

    應用於工程的主要方法有反射波法折射波法波速測井波法及橫波勘探等。地震勘探能詳細劃分地層高精度地確定沉積地層的傾角能夠準確探明巖體構造褶皺層破碎帶裂隙帶對于回填工程,地震勘探可以檢測其回填處理效果對于隧道工程,可以探測隧道洞體的圍巖分類及洞口地質情況利用波勘探所得到的瑞利波速度,可以準確推算地的承載力動彈模量等力學參數。
  7. ( 3 ) volume shrinkage of composite decreases greatly with wpu increasing, even can arrive a negative number, but thermal stability is still good. ( 4 ) toughening mechanism is that : the formation of high molecular linear amino formate construct is the toughening reason ; hydroxyl - terminated pu - prepolymer and pf react to produce chemical bond effect which participate cure ; carboxyl - terminated pu - prepolymer and pf form semi - ipn which make toughened pf occur maximum

    ( 4 )通過紅外光譜對pf / pu共混物分子結構進行的定性分析、以及掃描電鏡對沖擊形貌進行的分析,可證明聚氨酯預聚物增韌酚醛樹脂的機理是:兩個體系都是由於高分子量的線形氨甲酸酯結構而增韌;端羥pu與pf在共固化中產生化學鍵效應,參與pf的固化;而端羧pu則與pf形成半互穿網而增韌。
  8. It was also investigated and analysed on the styles of cross section in road green space, the rate of green space, the kind of green space, the quantity of plant spaces in green space, the format of planting. on the base of these, the planning designs of road green space in the blocks of heze city were also studied in combination with the practical situation which the city of heze were building to be a plain - plantation city with the flowers and water. the main results were as follows : 1. there were some problems about road green space in blocks of heze city, which were detected and researched. ( 1 ) the rate of road green space was low and the styles of cross sectionin road green space were simple

    本研究以菏澤城區道綠地及街頭綠地為研究對象,對其綠地形式、綠地率、綠地類型、綠地植物種類、數量、種植形式等現狀進行了全的調查和分析,在此礎上,結合菏澤近年創建以「花城水邑」為依託的平原森林城市建設的實際,對菏澤城區道綠地規劃設計進行了研究,主要結果如下: 1 .菏澤城區道綠地存在以下問題: ( 1 )道綠地率低,綠地布置形式單一,中心島積偏小; ( 2 )植物種類少,景觀效果差; ( 3 )植物配置形式單一,地方特徵不突出; ( 4 )某些植物選擇不當,如遮陰功能差,影響交通安全等; ( 5 )行道樹與架空線存在矛盾,影響樹木生長,景觀效果差; 2 .根據荷澤實際情況進行了城區道綠地規劃設計研究: ( 1 )提出了菏澤城區道綠地規劃設計的依據、原則、總體布局、布局形式。
  9. On the railway line nuder normal major repair cycle, rm - 80 full section undercutting ballast cleaning machine has enough excavation ability in working condition, productivity can come up with it ' s design standard

    對于正常大修周期的線上, rm80型全道碴清篩機作業運行工況具有足夠的挖掘能力,作業效率本上能夠達到其設計標準,這些在國外已經得到了充分的證明。
  10. Seismic fracture, fault fracture and permafrost fracture all gave negative effects on engineering construction and formed geological hazards at many localities along the golmud - lhasa highway and railway ice fractures formed in freezing rivers and lakes and on the top of pingos have not shown any hazard effect on engineering constructions up to the present

    地震破裂、層裂縫和凍土裂縫對青藏公、青藏鐵及沿線工程安全具有不良影響,這些地裂縫切割錯,形成破裂和滑塌,產生顯著的災害效應。
  11. The study solves engineering problem as follows : ( 1 ) the systematic study on the historical course of xigeda strata deposit and geologic environment includes strata, lithologic characters and constitution et in the liangshan and panzhihua region. the results show that the xichang - panzhihua express way is controlled by the anninghe fault and the xigeda fault, the earthquake frequently happen in the region of pass, the different sedimentation number is more great, they effect the road building, safety in operation and structure belong road ( 2 ) because in some place the xigeda strata is foundation and roadbed, the study on the basic properties of the xigeda strata include density, moisture content plastic and liquid limit graduation. the results show that the xigeda strata is deposition in lake, the main component is mudstone and sandstone, the fine particle is main, it has some viscosity, the moisture content of mudstone is different the it of sandstone, the other property are likeness. the xigeda strata has no dilatation on total, some claystone have low and medium dilatation ; ( 3 ) the study on the basic properties of xigeda filler include the composition of matter the biggest standard dry density, the optimum moisture content the results show that xigeda filler can use as road material, it is well grade filler and admixture filler on essence, its compaction index should change in different place because the property is controlled by mudstone and sandstone that change is great in different place ; ( 4 ) the study on the xigeda filler craft used as express way roadbed, includes suitable thickness, compaction numbers and methods and equipment choice et

    沿線廣泛分佈有昔格達地層,昔格達地層能否用作高速公填料,國內沒有先例,本論文就是結合導師的科研項目,在非典期間,現場長達5個月的工作,完成了從試驗、現場施工工藝到堤分層沉降監測等工作,是對生產實際,認識昔格達地層的性質和其作為地和填料應用中臨的問題進行的研究。主要的研究內容有:對攀西地區地層巖性、構造等地質環境和昔格達地層的沉積歷史過程作了系統的分析,研究表明西攀高速公主要受安寧河裂和昔格達裂影響,通過地區地震活動頻繁,差異沉降較大,對公建設、安全運行和沿線構築物設計有較大影響;由於昔格達地層在有些段作為地、有些作為,對其本性質進行了研究:包括天然密度、含水量、塑液限、顆粒級配等指標的試驗研究。研究成果表明:昔格達地層為湖相沉積,主要為砂巖和泥巖,它以細粒組為主,同時粘粒的存在,使其具有一定粘性。
  12. Experiment results prove that this algorithm is a practical and effective method, with which the ideal cross - section curve can be acquired. the result is coincidence to the standard iri ( the international roughness index ) and meets the necessity

    實驗結論:於陣列信號處理和小波降噪的演算法應用於平整度檢測可以得到較理想的曲線,換算國際平整度指標iri與標定較吻合,符合處理要求。
  13. To find a solution to these problems, starting with understanding of road function, this thesis grades road style with new standard, classifies priority of traffic volumes on different type of roads. this thesis also studies and analyzes the elements of cross - section, affords suggestion about each special contents and ideal road standard cross - section which match to practice. by these methods, it can increase the efficiency of road network, improve traffic environment and improve efficiency and service lever of traffic facilities

    針對這些問題,從科學發展觀出發,對橫設計理論分析,從理清道功能入手,對道等級再次分級,區分不同類別的道上各類交通的優先級,同時對橫各組成要素研究分析,提出各專項內容的改進建議及理想的道標準橫,以提高道網的運轉率,從而改善交通環境、提高交通設施服務水平與效率,為規劃、設計、管理部門提供礎。
  14. Structural analysis using ansys was also performed to extract the influence of geometric design of subgrades on the responses of pavement structures, especially in cut - fill transitional section over longitudinal profiles and in cross sections. the determination of pavement materials as a result of traffic accumulation, environmental influence, and / or poor construction quality was investigated through the analysis of critical responses

    結合實際交通軸載,全分析了超載車輛對破壞的影響,同時還針對路基斷面型式、填挖過渡,施工質量、環境作用、材料退化等因素對關鍵響應的影響進行了分析。
  15. Based on some calculation methods on transverse ground settlement, the mechanics of ground settlement caused by shield tunnel construction are discussed. in combination with the shield driven section from xuanwu gate station to new mofan road station of nanjing metro, the monitoring data are analyzed. mainly zone and the subordinate zone of ground settlement caused by shield tunneling is summed up, and the influence zone are definite

    2 、通過對盾構推進產生地表沉降機理的論述,在總結了各種理論計算方法的礎上,結合南京地鐵玄武門新模範馬區間的實際情況,實測了大量的橫數據,並進行分析研究,得出了盾構推進對地表影響的主區域和次區域,明確了盾構推進時對橫向地表的影響范圍,研究結論具有很好的社會效益和經濟效益。
  16. The assessment system software for driver ' s operation is designed and produced based on experts, knowledge about train traction calculations, operation experiences of excellent drivers, longitudinal profiles of running lines, train compositions as well as performance data of locomotives and rolling stocks, by use of object - oriented programming technology, in combination with data processing of train running monitoring device, train traction calculation, train dynamics analysis and optimized operation

    摘要以列車牽引計算專家知識、優秀司機的操縱經驗、行車線、列車編組及機車、車輛的特性數據等為礎,將機車運行監控裝置的數據處理、列車牽引計算、列車動力學分析及優化操縱等相關內容有機地結合起來,利用向對象的編程技術實現了機車司機操縱評價軟體的設計和製作。
  17. Soil - calculation of slope and embankment failure and overall stability of retaining structures - part 100 : analysis in accordance with the partial safety factor concept

    .坡口和口計算.第100部分:按局部安全
  18. Soil - calculation of slope and embankment failure and overall stability of retaining structures - part 100 : analysis in accordance with the partial safety factor concept, calculation examples

    .坡口和口計算.第100部分:按局部安全
  19. ( 5 ) another is the long - term predict utilizing the biggest index number lyapunov in the chaotic time series and the whole space method during the steady period of the road foundation load, after the overload of the road foundation finished. meanwhile, contrasts with some mature settlement predict methods, estimating some important section in the engineering synthetically, making sure an ideal outcome of the predict warp, then unload the overload of road foundation and make it satisfy the design request

    ( 5 )超載完成後,在荷載穩定期間內,利用混沌時間序列中的最大lyapunov指數和全域法進行長期預測,同時與一些比較成熟的變形預測方法進行對比,對工程中一些重點進行綜合評判,確定一個較理想的預測結果,從而對超載進行卸載,使其滿足工程設計要求。
  20. Accordant to factors affecting the layout of pcee, the maneuver for planning linear location of pcee is formed. taking into account that unfit transverse sector design can stand for the reason of traffic condition worsted, included parts of pcee transverse sector are analyzed and suitable layout styles are recommended

    其次,以影響出入口道規劃布局的因素為礎,提出出入口道線位規劃的方法;在明確橫設置不合理是出入口道交通效能下降重要原因的前提下,對構成出入口道的各組成要素進行分析,推薦合適的橫形式。
分享友人