路溝進水口 的英文怎麼說

中文拼音 [gōujìnshuǐkǒu]
路溝進水口 英文
gutter inlet
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : 名詞1 (挖掘的水道或工事) channel; ditch; gutter; trench 2 (淺槽;似溝的窪處) groove; rut; furr...
  • : 進構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (人或動物進飲食的器官; 嘴) mouth 2 (容器通外面的地方) mouth; rim 3 (出入通過的地方) ...
  • 進水口 : blast-hole; blasthole; water inlet; water intake
  • 進水 : admission pipe
  1. Big drops were dripping from a broken waterspout, and a ray of gaslight slipped from mme bron s window and cast a yellow glare over a patch of moss - clad pavement, over the base of a wall which had been rotted by water from a sink, over a whole cornerful of nameless filth amid which old pails and broken crocks lay in fine confusion round a spindling tree growing mildewed in its pot

    大滴大滴的珠從管的裂縫中滴下來。一道煤氣燈的燈光從布太太的窗子里射來,把一段長了苔蘚的面一段被廚房的排的污侵蝕了的墻根及整個堆滿了垃圾的角落映成了黃色,垃圾中有舊桶和破壇碎罐,一破鍋內竟然長出了一棵瘦小的衛矛。
  2. The tunneling method for the landslide section at the entrance of heishuigou tunnel ( for the internal circle construction road in the construction site of guandi hydropower station ) is presented herein ; in which the tunneling method and the effects of both the pilot and the system supportings on the entrance tunneling into the landslide body are described as well

    摘要介紹了官地電站場內環線道隧道滑坡體的施工方法,包括開挖的施工方法以及超前與系統支護對在滑坡體上洞所發揮的作用。
  3. The collapsible loess is often met during the construction of the high - grade highway in the loess area, and the main failure is the uneven subsidence of the roadbed and the culvert, which affects the safe usage of the roadbed and the culvert, etc. directed against this, based on the chankou - lanzhou freeway construction, the paper analyzes the application of the composite ground formed by lime - soil pile under the bridge and designs the project, discusses the rules of the contact pressure, the stress ratio of the pile and the soil, compares the p - s curves of one pile, the composite ground formed by one pile and the composite ground formed by two piles based on the in - situ plate loading test, evaluates the bearing capacity of the composite ground of the project

    黃土地區的高等級公建設中經常遇到濕陷性黃土問題,其病害類型主要是地基土受浸濕后引起基、橋臺、涵洞等的不均勻沉降,直接影響基、構造物等的正常使用。針對此問題,本文依託甘肅讒至蘭州柳河高速公建設工程,對橋基灰土樁復合地基應用的可行性行了深入分析,根據具體工程行了合理的設計與計算,並配合現場靜載荷試驗及壓力盒實測數據,探討了基底應力分佈規律,樁土應力比,變形模量的變化關系,對比分析了單樁、單樁復合和雙樁復合的p ? s關系,對橋基灰土樁復合地基承載力行了整體評價。
  4. The rainwater ran along the gutter into a grating at the side of the road

    沿著邊流有鐵欄桿的
分享友人