路線容量 的英文怎麼說

中文拼音 [xiànróngliáng]
路線容量 英文
line capacity
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 路線 : 1. (從一地到另一地所經過的道路) route; itinerary; way; tail; line 2. (思想上、政治上或工作上所遵循的根本途徑) line
  1. 5 now, because of this precision, it is possible for planes to fly both ways down a 10 - mile air corridor, thus doubling the capacity of existing airlanes

    譯文一:正由於這種準確度,現在飛機能在10英里寬的空中走廊內,分成兩各自降落,把航擴大了一倍。
  2. Rectifier units with a capacity of 20 to 25 amperes for each charging circuit are acceptable.

    每條充電為2025安培的整流裝置。
  3. One of the highest total connectivity rating in the region based on a cumulative penetration rate of main lines, mobile subscribers, integrated services digital network isdn subscribers and community antenna television catv and digital subscriber line accounts

    就主要電話行動電話用戶綜合業務數字網isdn用戶有電視和數碼用戶dsl帳戶的累計滲透率而言,香港是區內電訊總最大的地方之一
  4. Evolving the underlying networks to support a mass market, however, presents a number of challenges : spectrum is a limited resource ; cdma standards have sub - optimal spectral efficiency ; layered 3g network architectures are not conducive to low - latency services ; and capacity - enhancing smart antenna or multiple antenna systems have been disappointing

    但開發基本網以滿足廣大市場,仍面臨幾大挑戰:頻譜資源有限、 cdma標準的光譜效率未達最優、分層3g網架構未能實現即時服務、及增大的智能天或多天系統仍不盡人意。
  5. " electronic 1c chip drawing system " provides many functions such as " modify the position of the component ' s diagram " " modify the color of the component ' s diagram " " magnify and minify the component ' s diagram without distortion " " change the type of drawing line " " edit some physical properties of the component " " copy and paste diagram of one component " " delete one or more component diagrams " " move more than one components " positions " " change the z _ order of the diagram, set it to back or bring it to front " " save the drawing of the electronic components to one file and the file extension name is *. brd " " print the drawing ". users can finish all these functions easily by clicking and dragging the mouse

    板元器件繪制系統主要完成了使用鼠標拖拽、鼠標點按的方式繪制電板上各種常見的元器件圖形;編輯電板上元器件圖形的位置;編輯元器件圖形的顏色;不失真的對器件圖形進行放大和縮小;編輯元器件圖形的型;編輯電板上各個器件的物理屬性(比如電阻的阻值大小、電大小、額定電壓等) ;復制已經繪制出的電板上的器件;粘貼剪貼板上的器件;刪除單個或多個已經繪制出的器件圖形;同時改變多個器件圖形的位置;改變繪制區內各個元器件的zorder順序,也就是可以將層疊在一起的圖形置前或置后;把繪制的電板器件圖保存到指定文件中;能打開、查看和修改保存的電板器件圖;列印電板器件圖。
  6. The use of these circuits from hong kong has grown quickly in recent years, with circuit capacity rising from 7, 721 megabits per second in september 2002 to 32, 865 megabits per second in march 2005

    近年來這些的使用增長甚速,由2002年9月的每秒7 , 721兆比特增至2005年3月的每秒32 , 865兆比特。
  7. The new algorithm proposed in this thesis to evaluate the distribution system reliability is based on the practical operation condition of bejing downtown area distriblltion system, considering the constraints of neighbor feeds " circuit capacity margin and voltage offset at the feeder ' s terminal

    本文所提出的適于配電網可靠性分析的新演算法以實際的北京城區供電網運行數據為基礎,考慮到相鄰裕度限制及末端電壓偏移的限制。
  8. For the circuit - breakers of rated voltage 252kv up, the synthetic test methods are introduced according now condition because of the limitation of the transformer short - circuit capacity. the correlative prescribes on switching line - charging current in gb / t1984 - 200x " alternating - current high - voltage circuit - breaker " are discussed according to the test results and theoretic analysis

    由於開合空載架空試驗對電源側的阻抗有明確的規定,這就要求試驗電源必須具有足夠大的短,實驗室很難滿足要求,因此,一般對較高電壓等級的斷器採用合成試驗方法,本文介紹了利用現有條件,對252kv以上電壓等級的斷器採用合成試驗時的試驗
  9. In the meanwhile, we build a complete simulation model of layered wireless self - organizing routing network and verify feasibility of network architecture and key technologies, including operating mode of wireless interface, addressing and routing in lwsrn we study the performance of wsrn in terms of routing overhead, packet delivery ratio, and the communication capability, and compare these result with that of ad hoc network

    同時,構造了完整的分層結構的無自組織由網模擬模型。驗證了網體系結構和關鍵技術的可行性,包括無通道工作方式、網編址技術、網由過程。並通過模擬分析了分層結構的無自組織由網由負載、網數據到達率和網通信
  10. Abstract : an algorithm is presented for better legal solution in detailed placement of large scale mixed macros and standard cells ic design. due to the limitation of computing complexity, an effective and efficient initial placement is very important for detailed placement. novelty of this algorithm lies in a better solution at initial stage by using network - flow method to satisfy row capacity constraint and the thought of linear placement problem ( lpp ) to resolve overlaps. moreover, divide - and - conquer strategy and other simplified methods are adopted to minimize complexity. experimental results show that the algorithm can get an average of 16 wire length improvement on paflo in reasonable cpu time

    文摘:以大規模混合模式布局問題為背景,提出了有效的初始詳細布局演算法.在大規模混合模式布局問題中,由於受到計算復雜性的限制,有效的初始布局演算法顯得非常重要.該演算法採用網流方法來滿足行約束,採用性布局策略解決單元重疊問題.同時,為解決大規模設計問題,整體上採用分治策略和簡化策略,有效地控制問題的規模,以時間開銷的少增加換取長的明顯改善.實驗結果表明該演算法能夠取得比較好的效果,平均比paflo演算法有16的長改善,而cpu計算時間只有少增加
  11. It is proposed that the fixed capacity investment and cargo discharge regression forecasting model and the optimal average information customer distribution model can be used to predict the cargo o - d distribution. the capacity limitation dynamic increment comprehensive network model can be applied to the prediction of the channel cargo transportation discharge and the turnover discharge in the main courses. the main courses network plan grade can be verified by the total cost method, and according to which the economic rationality of constructing different grade channels can be evaluated

    本文開展了平原水網地區航道網規劃方法的研究,提出了採用固定資產投資完成額與貨運回歸預測模型;平均信息用戶最優分佈模型預測貨物o - d的分佈;限制動態增綜合網配流模型預測干航道貨物運輸和周轉;採用總費用法論證干航道網規劃等級,據此評定建設不同等級航道的經濟合理性。
  12. This paper unfolds engineering disposition and theoretical research of negative temperature high performance concrete ( nthpc ) with the damage of many factors motivation, the project background based on qing - zang railway engineering, which is one of four - emphasized engineering during the tenth five - plan. due to the difference of environment of construction and service between nthpc and ordinary concrete, and therefore durability of nthpc is required to higher level. at a first, nthpc must avoid frozen damage at early age and possess anti - freezing property at later period, in order to meet engineering practicable application need, and this are two emphasized and difficult problems, as for nthpc ; by means of mechanism analysis about deicing - agent ingredient and anti - freezing at early period, adopting composite technique routine of mineral addition + anti - freezing element + water - reducer4 - air - entraining + anti - erosion of steel component etc, based on orthogonal experimental approach, fd - 1 composite functional admixtu re was manufactured, which has more property and orientation on qing - zang railway

    負溫混凝土由於和普通混凝土在施工環境及服役環境上存在的差異,因此表現為比普通混凝土更為較高的耐久性要求;負溫混凝土首先要避免早期的凍害以及具備長期抗凍性能,才能夠滿足工程實際應用的要求,這也是負溫混凝土必須解決的兩大技術關鍵;通過對目前常用防凍劑組分作用機理的分析研究及混凝土早期防凍機理探討,採用礦物外加劑+防凍組分+高效減水劑+引氣+阻銹組分功能復合的技術,通過正交試驗設計復配了適應青藏鐵工程要求的專用多功能復合型外加劑fd - 1 ;並在此基礎上配製不同等級負溫高性能混凝土,開展一系列包括硫酸鹽侵蝕、氯離子滲透、抗凍融循環、收縮及耐磨性等耐久性能研究;通過對fd - 1組分和摻的調整,優化負溫混凝土在施工特性、力學指標和耐久性三個方面的兼、協調性。
  13. The function of passenger rail lines in general is to allow the more intensive development of parts of the urban area, and to allow passengers a greater degree of mobility

    客運鐵的功能在於許市區部分地區作較密集的發展,並為乘客提供快捷的運輸服務。興建鐵是減少道客運的先決條件。
  14. This paper briefly describes the extension of point - to - point communication link to node - connected communication network and of multiplex to multi - access technologies

    摘要概述了從點點至結點聯成通信網和從多技術至多址技術的發展過程,解釋了光纖通信網發掘利用潛在以及建立未來高速通信網的關鍵問題。
  15. Application of high - voltage explosion fuses is very abroad. in addition to protecting the electrical equipment by melting itself, disjunction or close of its tube can also be manipulated by a high - voltage insulative stick under some circumstance, for example, to switch on or off no - load overhead transmission line, no - load transformer and little burden current

    跌落式高壓熔斷器的應用極為廣泛,不僅能保護電氣裝置,在一定條件下還能直接用高壓絕緣鉤棒來操作熔管的分合,以斷開和接通空載的架空、小空載變壓器和小負荷電流。
  16. Eight per cent of the venture s workforce will either be cut back or relocated, mainly from " non - production departments, " the official said. the venture currently has 6, 400 employees

    已經開通的北京南中軸快速公交北起前門,南至德茂莊公交總站,穿越崇文豐臺和大興三個地區,總長約16公里。
  17. Capacity of bus line

    公車路線容量
  18. In the initial stage, there were only gsm 900 networks. in order to provide higher wireless capacity, various frequency reuse technologies were used, including frequency hopping, mrp, iuo, etc. however, the higher the capacity, the more serious the interference

    由於網初期只有gsm900 ,為了提供更多的無,採用了各種頻率復用技術,如跳頻、 mrp 、 iuo等方式,提高的同時也引入的更大的干擾。
  19. Lastly, to marks out the capacity and frequency of the network, provides the wireless base station construction and the corresponding precept, in base station power supply system and transmission system construction aspect, provides construction principle and interrelated request

    最後對網和頻率進行規劃設計,給出了無基站建設方案和基站建設配套方案,在基站電源系統和傳輸系統建設方面給出了建設原則和相關的要求。
  20. It is the bottleneck of urban road traffic. its setting reasonability concerns the traffic function performance of relevant roads or even of the whole road network. it has great influence on city mobility, road capacity, capacity of road network and traffic safety

    城市道節點是城市道的重要組成部分,是城市道交通中的瓶頸部位,其設置的合理與否直接關繫到相關乃至整個網交通功能的發揮,它對于城市道的機動性、通行能力、以及交通安全都有較大的影響。
分享友人