路障標線 的英文怎麼說

中文拼音 [zhàngbiāoxiàn]
路障標線 英文
object or obstacle marking
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : Ⅰ動詞(阻隔; 遮擋) block; hinder; obstruct Ⅱ名詞(遮擋物) barrier; block; obstacle
  • : Ⅰ名詞1 [書面語] (樹梢) treetop; the tip of a tree2 (枝節或表面) symptom; outside appearance; ...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 路障 : roadblock
  • 標線 : graticule; reticule
  1. The article believes, on this " becoming " theory point, the leisure philosophy of confucianists aimes at becoming saint and wisdom, and its character is automomy, so man gets happiness of growing up from it ; the confucianists are based on emotion principles in leisure experiencing, they advocate that people taste the meaning and pleasure of life in this way, which break away from themselves, society and god ; the confucianists take a social leisure mad in leisure organizational system, the confucian and music as a read line to impenetrate the whole social organizational system, and they make the social organizational system become the guarantee system and social environment, from which man can obtain self - fulfillment and experience enjoyment

    認為,在「成為」理論方面,儒家休閑哲學以成聖成賢為目,以角色履行為途徑,以自主性為特徵;在休閑體驗方面,儒家以情感原則為基礎,提倡從擺脫自身、社會和「天」的約束中體驗生命的意義與人生的快樂;在休閑建制方面,儒家走社會休閑化的道,禮樂作為一個紅貫穿在整個社會建制中,使社會建製成為人自我實現、體驗快樂的制度保和社會環境。
  2. There is great change of negative current component when it happens the line - open fault. it is marked as the occurrence of the fault. and it can be concluded the phase characteristic of negative current in the line. in the transient course, there are plenty of harmonics in the fault line. through the transient analysis, it is drawed that the amplitude of each harmonic in fault phase is greater than other phases. harmonic current in fault line is far greater than other normal lines

    發生斷以後,中會出現負序電流的突變,可以作為故啟動判斷的志,並且通過分析得出了故時負序基波電流的相位特點。在故暫態過程中,故電流中含有大量豐富的諧波成分,各次諧波在故期間有突變,並且衰減很快。
  3. In the part of detector, it mainly introduces the design of liquor tubes, heater, pressurize, and thermocouple ; in the part of controller, this design uses tms320lf2407 as the cpu. the design part mainly introduces controller circuit design which mainly contains data collection circuit, prepositive magnifying circuit, a / d convert circuit, failure self - diagnosis circuit, the tms320lf2407 interface circuit, temperature control circuit, display circuit, 4 ~ 20ma standard signal output circuit ; in the software part, it mainly introduces software chart of main program and partly linearization subprogram design

    檢測器部分重點介紹了導流管的設計、加熱器的設計、密封技術的設計以及測溫電的設計;控制器部分以tms320lf2407為核心,重點介紹了控制器電設計,主要包括數據選擇電、前置放大電、 a / d轉換電、故自診斷電、 tms320lf2407介面電、控溫電、顯示電、 4 20ma準信號輸出電共八個部分;軟體設計重點介紹了主程序軟體設計及分段性化子程序設計。
  4. The scts ( simulated cable training system ) is a troubleshooting & training system for students that are learning about termination of network cables, using the 568a, 568b, & usoc wiring standards

    被模仿的纜繩培訓系統)使用568a ,是得知網纜繩終止, 568b的學生的查明故培訓系統, usoc接準。
  5. The algorithm can be applied to connection routing in pcbs with various pad geometry and pad sizes, with different wire widths and variable distances between wires. the basic element in routing is the search line with a given destination. the main features of the router are the target orientation of the search lines, the routing efficiency is guaranteed by rationally designed data structures and by the ability of searching around obstacles, the small amount of working storage and the reasonably short routing time

    該布演算法適用於焊盤外形尺寸不一,寬及間距離可變的印刷電板布,其基本要素是帶有預定終點的探索,特點是探索具有目針對性,設計合理的數據結構及靈活的繞探索方式可大大提高搜索效率,所需存儲量小,布速度快。
  6. In the middle 1960s, it began to be applied in detecting the fault of electronic facility in foreign countries. in the 1970s, thermal instrument had been installed in helicopter to detect the connection of power line and the determinant standard about infrared test had been established. in the middle 1980s, ir technology had a comprehensive application on the fault of print circuit board ( pcb )

    國外應用紅外技術檢測電氣設備故始於六十年代中期,七十年代開始把熱像儀裝在麵包車或直升機上對變電站設備或高壓輸電連接件故做巡迴檢測,並分別制訂出相應的技術規范或紅外診斷故判定準。
  7. According to the rule of mine safety regulations, an intrinsically safe pilot circuit with perfect performance for underground motor intelligent protective systems is put forward, which can effectively avoid the phenomenon of self - starting that is caused by the earthing of control lines before starting motors, at the same time, can reliably cut off the switches to ensure the safety of underground production under operation condition no matter what the faults of short circuit, open circuit and earthing in the control circuits happened

    根據煤礦安全規程規定設計了性能完善的本質安全型先導電,起動前它能有效地防止因控制接地造成自起動現象的發生,而且在運行中無論控制發生短、斷還是接地故,它均能可靠跳閘,確保生產的安全,該先導電的性能指達到了國內領先水平。
  8. In the paper, the transmission power of section constituted by the assigned branch is seen as objective function, assigning the adjustable generators both in sending system and receiving system, assigning the faults set, including the constraint conditions such as the differences between the angles of rotor and the inertia center angel of the whole system, the thermal stability of branch and node voltage, obtaining the results by using interior - point solution and line - predominant jordan

    本文提出的考慮暫態穩定約束的可用輸電能力演算法是以指定組成的斷面的傳輸功率為目函數,指定送端系統和受端系統中參考調節的發電機,指定故集情況下,以發電機轉子相對全系統慣性中心的角度差、熱穩定、節點電壓等構成約束條件,採用內點法和行主元約當逐行消去法求解問題的最優解。
  9. A buffer distance may be inserted between the road and the buildings, or screening structures such as roadside barriers may be incorporated where practicable. however, in some cases the constraints of the site may render implementation of direct engineering remedies, barriers or enclosures not practicable. for those cases the standards laid down in the hong kong planning standards and guidelines could not be met

    我們首先小心研究道,以盡量避免噪音滋擾居民,此外亦會在道與建築物之間設置緩沖距離,或在可行情況下設立邊隔音屏等隔音設施,但倘若礙于場地的規限而無法實施上述解決方案,以致未能符合香港規劃準與準則的準,加設隔音設備以作補償成為最後逼不得已的方法。
  10. Aiming at the concrete need in srttep construction and embodying the managing theory of the combination of the prearranging programming and comprehensive control, the article proposes the cpm - based schedule operating program of srttep on the basis of the relationship among schedule program, cost and quality which thus realizes the close combination of schedule program and project control ; based on the comparative analysis of experience estimation method, factor estimation method, wbs estimation method and comparison estimation method, the cost controlling strategy is worked out that attaches importance to the srttep cost budget and market economy situation. meanwhile, comprehensive quality management theory is introduced in the project " s schedule program. aiming at subsidiary project bidding, equipment purchase, essential quality inspection, detailed quality insurance system and rules are worked out so as to achieve the goal of high - quality construction of srttep

    ( 3 )針對川塔項目施工建設具體需要,在充分體現項目事前規劃與全面控制相結合管理思想和所進行的項目wbs結構分解基礎上,基於項目進度? ?費用成本? ?質量三者之間的關系,提出了基於cpm關鍵法的川塔項目進度計劃制定方案,實現了進度規劃與控制的緊密結合;在對比分析經驗估演算法、因素估演算法、 wbs估演算法、類比估算等方法和技術基礎上,制定了側重於預算的川塔項目成本基本規劃方法,以及結合市場經濟情況的成本控制策略;同時將全面質量管理思想,引入了項目施工方案中,針對子項目招、設備采購、重點質量監控點等設立了詳細的質量保機制和細則,以確保達到工程優質建設的目
  11. Above all, with the data acquired by tests, this thesis has analysized the lateral resistanc, longitudinal resistance and rail creep etc between ballast and sleeper before and after mass machine work, discussed the effect of mass machine on stability of continuously welded rail track, reseached the change regularity of fastening - down temperature of rail, which is resulted by mass machine work, and have settled the suitable range of work temperature which guarantees the stability of jointless railway. what ' s more, this thesis has put forward the appropriate work pattern, work temperature and work area for mass machine work in future. at the same time, this thesis has given rational suggestions about some conditions worth of attention in production of mass machine, which can in return raise the work productiveness of mass machine. at last, this thesis has considered formulating reasonable measures for operation organization and work standard, so that mass machine work can play an important role in maintenance, which can reduce work load, raise work efficiency and maintenance cost in daily maintenance

    本文通過實測的各種數據,分別對大機作業前後道床對軌枕的橫向阻力、縱向阻力、鋼軌爬行情況等進行深入分析,進一步探討大機作業對無縫穩定性的影響,研究大機作業引起的鎖定軌溫的變化規律,確定保證無縫穩定的合適作業軌溫范圍。為我國今後的大型養機械作業提出合理的作業方式、合適的作業軌溫和作業地段,同時對大型養機械作業中應注意的問題提出合理化建議,為大型養機械作業提供更高的安全保,進一步提高大機作業效率。最後,對工務段在大機作業中的配合制定完善的施工組織措施及作業準,使大機作業在養護維修中發揮更大的作用,為工務段日常的養護維修減少工作量,提高勞動效率,降低維修成本。
  12. And more than 70 % hardware are tested during microcode self - test since the execution of micro program can cover other data paths. boundary scan is designed according to ieee1149. 1, and some other instructions such as degug, runbist are provided to support internal fault testing, online debugging and built - in self - test besides the several necessary insructions. internal scan is implemented by partial scan, through this the boundary of logic component and user - cared system registers can be selected to be scanned

    Bist用於測試cpu的微碼rom ,其它ram則利用微碼rom中的微程序進行測試,而微程序的運行則可以順帶覆蓋其它數據通,從而使高達70 %的硬體得到測試;邊界掃描按ieee1149 . 1準設計,除必備的幾條邊界掃描指令外,還提供了debug 、 runbist等指令以支持內部故測試、在調試及內建自測試;內部掃描採用部分掃描策略,選擇邏輯部件的邊界及用戶關心的系統寄存器進行掃描,從而實現了硬體邏輯劃分,方便了后續的測試碼產生和故模擬,並為在調試打下了基礎。
  13. At last grid - connected pv system has also been studied, different random faults in line and protection which bring the change of operating patterns have been taken account for, indices of reliability and economics have been computed in distribution system

    最後,進行了光伏並網系統研究,考慮不同的及保護隨機故動作,和多變的系統運行方式,結合配電網進行相關的可靠性經濟性指計算。
  14. Due to the flexible process inside the manufacturing cell, first of all, production cost model is set up, secondly, based on the dynamic pheromone updating, a developed ant colony optimization algorithm is described in detail. with aim to reduce collaboration with the external partners as well as to decrease the total manufacturing cost, and to balance the production process, this algorithm ensures the

    針對單元內部工藝加工徑可變而具有一定柔性的情況,建立了柔性工藝生產單元的系統耗費,給出了採用信息素動態更新策略的蟻群優化演算法步驟,以解決保證工件交貨期和保設備均勻生產,減少外協量為目的作業調度問題。
  15. This thesis discussed the affection of all kinds of components contingency and the components " position in the line and other factors on the evaluation of load point reliability index. this thesis adopts a integrative method to deal with simple or complex distribution network with the system ' s practical operation characteristics and the results of the example reveal that it is feasible. the key to study the economics of power system reliability is outage costs

    在定量評估負荷點或系統可靠性指的研究中,本文較全面地分析了各元件故和元件在中的位置以及計劃檢修、臨時停電、天氣因素、負荷轉移等因素對估算負荷點可靠性指的影響;研究了現有的可靠性評估模型,結合城市電網的實際運行特點,採用一種綜合的方法估算輻射型電網的可靠性指,算例結果表明它是有效可行的。
  16. Firstly, by means of network planning, we find out the key task and the key route and optimize the construction project, then ensure the realization of schedule by taking measures to ensure manpower, material resources, financial and technology, etc. in the aspect of management framework, according to the organization theory and locale management practice, the matrix is selected as the construction management framework and the locale item management board is established based on the principle of " posts from facts and efficiency from condensing " in order to reduce the administrative level, the item board changes the conventional three levels into two - level pattern to enhance locale management

    組織機構方面,根據組織理論和現場管理實際,選定了矩陣製作為項目管理的組織結構,並本著「因事設崗、精幹高效」的原則,組建了現場項目經理部。為減少管理層次,項目部改變傳統三級管理為兩級管理模式,加大了對現場管理力度。利用網計劃方法,找出關鍵工序,確定關鍵,優化施工方案,提出了從人、財、物、技術等方面採取措施重點給以保,確保進度目的實現。
  17. Function : power input : standard 220vac, 50hz ; power output : no load 12. 4 - 13. 63vdc, with load dc12v 13v standard current output : 10a moment current output : 10a control electric locks or bolts directly, reduce the load of access controller save project lines lower potential trouble have output nc no, control all kinds of electric locks has delay control circuit, unlock delay in 0 - 10s use exit button, press to 0pen the electric lock directly auto self - protection function : when short circle and other unexpected situation happen, the power supply can melt the fuse to protect itself

    功能特性:交流輸入:準ac220v 50hz直流輸出:空載輸出dc12 . 4v 13 . 63v負載輸出dc12v 13v準輸出電流10a瞬間輸出電流10a直接控制電鎖:可減小門禁控制器的負荷,節省工程布,減少故隱患。設nc no輸出,可控制各種類型的電鎖。設延時控制電,開鎖時間可在0 10秒。
  18. Function : power input : standard 220vac, 50hz ; power output : no load 12. 4 - 13. 63vdc, with load dc12v 13v standard current output : 2. 5a moment current output : 2. 5a control electric locks or bolts directly, reduce the load of access controller save project lines lower potential trouble have output nc no, control all kinds of electric locks has delay control circuit, unlock delay in 0 - 10s use exit button, press to 0pen the electric lock directly auto self - protection function : when short circle and other unexpected situation happen, the power supply can melt the fuse to protect itself

    功能特性:交流輸入:準ac220v 50hz直流輸出:空載輸出dc12 . 4v 13 . 63v負載輸出dc12v 13v準輸出電流2 . 5a瞬間輸出電流2 . 5a直接控制電鎖:可減小門禁控制器的負荷,節省工程布,減少故隱患。設nc no輸出,可控制各種類型的電鎖。設延時控制電,開鎖時間可在0 10秒。
  19. Function : power input : standard 220vac, 50hz ; power output : no load 12. 4 - 13. 63vdc, with load dc12v 13v standard current output : 5a moment current output : 5a control electric locks or bolts directly, reduce the load of access controller save project lines lower potential trouble have output nc no, control all kinds of electric locks has delay control circuit, unlock delay in 0 - 10s use exit button, press to 0pen the electric lock directly auto self - protection function : when short circle and other unexpected situation happen, the power supply can melt the fuse to protect itself

    功能特性:交流輸入:準ac220v 50hz直流輸出:空載輸出dc12 . 4v 13 . 63v負載輸出dc12v 13v準輸出電流5a瞬間輸出電流5a直接控制電鎖:可減小門禁控制器的負荷,節省工程布,減少故隱患。設nc no輸出,可控制各種類型的電鎖。設延時控制電,開鎖時間可在0 10秒。
  20. At the same time, the performance and the security problems appear and cannot be ignored. so it ' s urgent to build a management system that can manage the analogous devices and digital devices together and can correspond with the catv trunk network management system. to meet the need analyzed above, we recommend using snmp to build the broadband hfc access network management system

    為了保高效安全地運營,寬帶hfc接入網需要一套網管系統;為了與現代有電視網的干網管系統相協調,寬帶hfc接入網需要一套準的網管系統;為了能同時支持模擬業務和數字業務的管理,寬帶hfc接入網需要一套能同時管理模擬設備和數字設備的準的網管系統。
分享友人