軟基重力壩 的英文怎麼說

中文拼音 [ruǎnzhòng]
軟基重力壩 英文
gravity dam on soft foundation
  • : Ⅰ形容詞1 (質地不硬) soft; flexible; supple; pliable 2 (柔和) soft; mild; gentle 3 (軟弱) we...
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • 重力 : [力學] gravity; force of gravity; gravity force; power of gravity; pull of gravity; gravitational...
  1. Finally, the stress and strain distributions of dam foundation in which there have glacis weak surfaces are studied by means of nonlinear fem. with deducing parameters of weak surfaces gradually, stability of the dam against deep sliding is verified. therefore safety of dam and foundation would be estimated

    5 、運用非線性有限元法研究了東張水庫含有緩傾角弱夾層的、應變情況,用逐步降低夾層材料參數的方法核算大的抗滑穩定,以此評價大的安全性。
  2. Relating closely to the main problem of the high sidewall and wide span underground cavities excavation stability of xiluodu hydroelectric project, the evolution characters of geo - stress field in deep - cutting gorge and the whole features of the stress field, strain field and plastic failure zone around the underground chambers after excavation are studied systematically in the dissertation, based on a great deal of data gathered in field investigation and taking the flac3d v2. 0 software as basic computation tools. meanwhile, in the course of research, the new methods of dynamic numerical simulation are summarized and applied. furthermore, the effects of rock mass qualities, initial geo - stress field and excavation procedure on surrounding rock mass stability are discussed

    本文緊密結合溪洛渡水電工程大跨度、高邊墻復雜地下廠房洞室群,施工開挖過程中和開挖后圍巖穩定性研究這一大課題,在詳盡的野外地質調查工作和對大量礎地質資料的整理與分析礎上,以目前國際工程地質界公認的最新通用體flac ~ ( 3d ) 2 . 0版作為本計算工具,從整個區地應場的研究開始,通過動態數值模擬分析這一新的模擬思路,系統地研究了深切峽谷區地應場多階段的特徵和演變規律,進而對左、右岸地下廠房洞室群開挖全過程中圍巖應場、變形場和塑性破壞區的變化特徵,進行了全過程動態數值模擬研究,並詳細討論了圍巖質量、初始地應場、施工開挖順序對大型地下洞室群圍巖穩定性的影響。
  3. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘及地的應應變分析:被成都勘測設計研究院應用於地加固處理方案; ( 3 )三峽廠房7 # - 14 #段溫控並縫措施研究:為廠房段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析體; ( 5 )向家地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱肩)強度和穩定的三維靜動隨機有限元分析及可靠度計算:為溪洛渡大工程體的靜動安全穩定性及溫控方案提供依據。
  4. Through the non - linear fem static and dynamic analysis of the rcc gravity dam of kelashuoke reservoir by ansys, the deformation and stress law of dam body and its foundation under various working conditions is studied so as to get to know the working situation of the dam body and foundation rock under design conditions and to evaluate the reliability of the dam construction scheme

    摘要採用美國ansys結構分析體,通過對喀拉朔克水庫碾壓混凝土方案進行非線性有限元靜和動分析,研究探討了體及礎在各種工況下的變形和應規律,以了解體和巖在設計條件下的工作形態,對方案的可靠性進行了評價。
  5. Thirdly, in consideration of the monitoring of pore - water pressure of dam and roadbed, a novel pore - water pressure sensor structure for simultaneous measuring pressure and temperature has been designed. then groups of experiments have been carried out to show the properties of pressure measuring, temperate measuring and temperature self - compensation

    第三,於光纖bragg光柵應變、溫度測量原理,結合大及公路等巖土工程的要求,研製出一種新型的壓、溫度可同時測量的光纖bragg光柵滲壓計,並以壓傳感特性為點對其進行了實驗研究。
  6. Consequencely, the analysis and assessment system of the operating state of the concrete dam was developed under the ansys development environment, and the back - analysis and the prediction of the parameters of the dam system have been done according to the operating observed data. the research work involves several aspects as follows : 1 ) a back - analysis model including the prior information and a predictive model of nonlinear time series were established ; 2 ) the analysis and assessment system of the operating state of the concrete dam was developed under the ansys development environment, in which the analysis module of the loading effects, the back - analysis module, the forecasting module of the physical parameters and the assessment module of the operating state were contained ; 3 ) according to the operating observed data, the operating state of the dam was assessed and predicted with the analysis system of the operating state, the results suggested that the dam is in basically normal operation at present

    具體工作有以下幾方面: 1 )收集整理漫灣水電站大運行監測資料,並對其進行了系統分析,從觀測資料本身直觀的分析了大的運行狀況; 2 )總結位移反分析的理論及方法,建立了考慮先驗信息多介質位移反分析模型,於神經網路非線性映射功能,建立了神經網路時間序列預測模型; 3 )以ansys體為平臺,開發了漫灣水電站砼運行狀態評價模塊,結合荷載效應分析、參數反演分析、參數預測分析三個模塊組成漫灣水電站砼運行狀態分析系統;實現了對漫灣水電站運行狀態的動態「反演-預測」分析; 4 )利用漫灣水電站砼運行狀態分析系統,在漫灣大實測資料分析、大砼特性參數反分析、大砼彈性模量衰變規律及預測分析的礎上,系統的分析並預測了大運行狀態。
  7. This paper does simulation analysis on temperature field of baise rcc gravity dam with the software ansys based on the theory of transient temperature field

    摘要根據瞬態熱傳導三維有限元分析本理論,利用大型有限元體ansys對百色碾壓混凝土溢流段一枯二枯施工期的溫度場進行了實時模擬分析。
  8. Based on the theory of inverse analysis in mechanics and engineering and combined with the concrete gravity dam of manwan hydro power plant, a back - analysis model including the prior information was built and artificial neural network ( ann ), according to which powerful nonlinear mapping ability, was used to predict the future physical parameters of the concrete

    在此礎上,以大規模有限元分析體ansys為平臺,二次開發了漫灣水電站砼運行狀態分析系統,根據大運行監測資料,對該電站大進行了砼學參數反分析、砼學參數預測分析以及大運行狀態分析。
  9. The mostly aims of the thesis are developed the gravity dam parametrical model system. the system can automatic cut open for model and can export model to the universal finite element analysis ' software to calculate. finally, the author discuss in the place drawing

    本文的主要目的在於建立的數字化三維模型系統,並能夠在此礎上對三維模型進行自動剖分,並導入通用有限元體進行有限元計算,而且向二維施工圖的方向進行了試探。
分享友人