軸線測定 的英文怎麼說

中文拼音 [zhóuxiàndìng]
軸線測定 英文
axonometry
  • : 軸Ⅰ名詞1. (圓柱形的零件) axle; shaft 2. (對稱部分的直線) axis 3. (圓柱形的纏繞器物) roller; spool Ⅱ量詞(用於纏在軸上的線以及裝裱帶軸子的字畫)
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • 軸線 : 1 [機械工程] axis; axle; [地質學] axial trace; axial cord; axis shaft line; shaft line 2 [紡織] s...
  • 測定 : determine; determination; setting-out; admeasurement; assignment; assay; finding
  1. Abstract : the design, manufacturing and measurement method of cam profiling are discussed in this paper by describing cam shaft grinding, fabrication of cam profiling, formation of contour of cam profiling, method of compensative fabrication of cam profiling, and measurement and evaluation of cam profiling

    文摘:從凸輪磨床磨削工件凸輪、反靠凸輪靠模的過程,凸輪靠模輪廓曲的形成,補償反靠凸輪靠模的方法,標準凸輪的刮削及補償量的確,凸輪靠模的檢與評等,論述了凸輪靠模的設計、製造與檢方法。
  2. First, the wheelset is fixed and rotated by the device used hi vehicle depot as usual. second, the center line of wheelset axis is determined by a device called axis - center probe. last, the acting device for sensor can draw a whole felloe profile, which is made up of parallel - pole device and rotating - probe

    鑒於此,本文給出了一種全新的量方案:採用車輛段普遍使用的轉輪器實現被輪對的位;採用車基準探尺輪對的;採用並聯式伸縮機構和旋轉頭作為傳感器的執行機構,輪輞斷面的輪廓
  3. Geographic axis : man - made arbitrary north - south fixed reference that determines lines of longitude and latitude, and the geographic north and south poles

    地理:人們制的北南固的參考,它們經緯以及地理北極和南極。
  4. We can use the mm5 model in definite time, definite area weather forecasting. we conclude that : : the moving route of this necw in its developing progress was direct - south along latitude, the cold air is rough, and just this made the rough vertical velocity ; the necw southern moving and conflicting with the west pacification sub - tropical high makes rough jet steam. the plenty south - west warm and wet air made by the jet stream gave the rainstorm demanded vapor ;. the rough vertical velocity by jet stream is a main reason in this rainstorm ; the mm5 model uses four - direction analysis data as its input, this avoids some errors occurred in observe and transfer, thus made the result more useful

    綜合分析認為: ( 1 ) 、這次冷渦在其發生發展過程中,其移動路徑是沿經圈直南壓,攜帶的冷空氣勢力較強,形成槽后較強的垂直運動; ( 2 ) 、西太平洋副熱帶高壓偏北位置與東北冷渦南壓形成的急流,把源源不斷的西南暖濕氣流輸送到遼西地區,也就是急流的左前方位置,為這次暴雨的產生提供了充足的水汽來源; ( 3 ) 、低空急流不但為暴雨輸送水汽,其造成的較強的垂直環流也是產生強降水的一個主要原因; ( 4 ) 、 mm5模式以四維同化資料作為初始場,最大限度地避免了觀誤差可能造成的積分不穩,提高了模擬結果的參考價值。
  5. Some testing devices are of advanced ones, such as scanning electronic microscope, microfocus circular radioscope, water - immersed ultrasonic flaw detector, 3 - axis measuring machines, large - sized projector, etc. for the production of non - aero products, there are large - sized die - casting equipment, and nearly 100 pieces of specialized gear machine tools including worm - gear grinding machine, etc. it has some specialized production lines for piston, crankshaft, cylinder and housing, etc., as well as 4 flexible production lines advanced at home for motorcycle engine, and a complete set of automatic inspection test eqiuipment for motorcycle engine

    計算機輔助設計輔助加工技術正在普遍使用。在非航空產品生產方面有大型壓鑄設備殼型鑄造,包括鍋桿輪磨在內的輪專用機床100多臺,以及活塞曲汽缸殼體等專業化生產。此外,還建成了具有國內領先水平的4條摩托車發動機柔性生產,以及成套的摩托車發動機檢設備,可進行試數據分析,改進檢試方法等。
  6. Power curve measurement and analysis for type of axial - flow stirrer

    一種高效節能型流式攪拌槳功率曲及分析
  7. It is determined that with accurate knowledge of the complete stress - strain curve of concrete in compression, steel in tension, and with an iterative computerized non ? linear method, it is possible to predict the entire moment - curvature, moment - flexural rigidity and axial rigidity relation ship of a cross - section of a structure member

    可以確,只要知道混凝土受壓和鋼筋受拉的完整的應力應變關系,採用選代的非性計算方法,就有可能預結構截面彎矩一曲率、彎矩一彎曲剛度和向剛度的關系。
  8. Obtain these chief research achievements. ( 1 ) the method of hydraulic fracturing, kaiser effect experiment and the finite element numerical simulation computation results, the direction of maximum horizontal principal stress intersect the small - angle of tunnel axial line, it is favorable to the stability of tunnel peripheral rock ; according to the test rust of field stress - relief method, at the present time, zhe gu mount tunnel have n ' t access to high crustal stress site, maximum principal stress magnitude is 17mpa ~ 20mpa

    主要獲得以下研究成果: ( 1 )綜合水壓致裂法、室內巖石kaiser效應試驗和有限元數值模擬計算研究成果,最大水平主應力方向與隧道洞小角度相交,對隧道圍巖穩性有利;根據現場應力解除法試結果,目前鷓鴣山隧道尚未進入高地應力段,最大主應力量級為17mpa 20mpa 。
  9. Nowadays, the machining center carries through the precision inspection only following the fixed coordinates " axes, which can not completely reflects the real error of the spacial position of the practical machining outside the axes and leads to having no the directive relation between the inspected precision and the practical machining precision. so, this paper introduces that the error factors of influencing workpiece ' s outline on machining and carries out the solid inspection of every spot ' s error inside the workaround on the horizontal machining center

    本文針對當前加工中心僅沿固的坐標進行精度(含幾何精度和位精度)檢驗,並不完全反映外實際加工的空間位置真實誤差,導致檢出精度與機床實際加工精度無直接對應關系的現狀,論述了加工時影響工件型面輪廓精度之加工中心的誤差因素,對加工中心實施其工作區內各點誤差的立體檢
  10. Based on practical project of inspecting, appraising and reinforcing a main heavy factory building, especially its steel crane girder system, of the second steel mill belonging to taiyuan steel & iron corporation, whose technology renovation leads to increase tonnage of many heavy cranes and vertical load of frame - bent structure, first the structure and its members were investigated, inspected, calculated and analyzed, and their reliability was appraised respectively and the strengthening projects or the measures to remedy were given. then, in accordance with the requirement to strengthen the girders under non - stop production, the feasibility of strengthening the crane girders by adding steel diagonal braces underneath the existing girders has been studied by inspecting and evaluating the strengthening effect of the crane girders and comparing with other reinforcing scheme

    本文結合太鋼(集團)有限公司第二煉鋼廠主廠房由於生產工藝改造要求,加大多臺重型吊車噸位及bc跨( 1 ) ( 8 )框排架各層豎向(設備)荷載后,對廠房結構,尤其鋼吊車梁系統進行檢與加固設計的實際工程,首先對廠房結構進行了現場調研、技術檢查、試以及內力和承載能力的計算與分析(考慮抗震) ,並根據檢、計算與分析結果,對廠房結構、構件的可靠性進行了評,並綜合提出鑒結論和加固處理建議。
  11. The attenuators and the sensitivity of detectors are calibrated in varied frequencies. the attenuation of the cable is also calibrated

    對晶體檢波器在不同頻率下的礦靈敏度進行了;對同信號的衰減量瓣行了標
  12. Dosimetry of electron beam central axis percent depth dose

    高能電子射野中心百分深度劑量
  13. With the different tripping annulus at the inlet, a new method of the distance definition from the wall was used to measure 35 mean velocity profiles on seven sections in the pipe length x / d = 125. 2

    採用新的離壁距離標方法,在入口處設有改變擾動強度擋環的條件下,利用熱儀在管長x d約為125的范圍內完成了七個不同管流截面上的35個方向速度分佈的量工作。
  14. Key components in the insulation line : high precision extrusion crosshead with automatic centring produced by swiss unitek, o. d. meter, centrifugal tester, h. f. spark tester, capacitance tester provided by uk beta co., frequency converter, temperature controller, plc and bearing from simens in germany and mitsubishi injapan

    生產選用的主要關鍵器件:擠出機頭採用瑞士unitek公司的高精度自動心機頭;外徑試、偏心、高頻火花、電容試等均採用英國beta公司的高精度儀器;而且擠出機的變頻器、溫控器、 plc和承等均採用德國西門子公司和日本三菱公司的產品。
  15. Logging method and pre - processing method of logging data have been ascertained for the logging tool formed by coaxial line phase water cut meter and other function units such as temperature meter and flow meter. data of 10 oil wells obtained by the logging tool has been interpreted using the soft - measuring model, and the result is accordant with data of ground measurement. it indicates that the soft measurement model of coaxial line phase water cut meter has high interpreting precision

    由同相位法含水率計組成的組合井儀的現場井方法以及井數據資料的預處理方法,並利用軟量解釋模型對現場所10口井的資料進行解釋,結果與地面計量符合較好,說明同相位法含水率計的軟量模型在現場井解釋中具有較高的解釋精度。
  16. Verification regulation of coaxial slotted line

    規程
  17. Verification regulation of model clx - 2 clx - 20a 20b parallel - plate coaxial slotted line with big size connector

    Clx - 2型和clx - 20a 20b型大接頭平板型同規程
  18. But considering the influence of artillery goal mensuration, computer calculate and artillery following system, the axis of artillery pipe and goal have deviation, this error is dynamic tracking error

    但由於火炮目標器、計算機解算、火炮隨動系統等環節的影響,火炮身管的與目標存在偏差,該項誤差即為動態跟蹤誤差。
  19. The researching method is, firstly, to create a flow field model which is testified to be reliable on a large area, and to research the variations of discharge entering and out - flowing from hangzhou bay ; secondly, to simulate the discharge variation of main interest area near the bridge axis with a denser grid in a subarea of the coarse model

    研究方法是首先建立大范圍的可靠適用的流場數值模型,研究進出杭州灣的流量變化;然後對感興趣的區域嵌套加密網格,利用橋墩物理模型的等效底摩阻系數,研究建橋前後在橋上的流速、流量變化。
  20. The conclusion can be drawn that the method can be applied to the determination of the temperature of a hot wire embedded at the center of a cylinder

    經數值計算驗證,本方法可對薄壁高溫的加熱圓柱體上的熱導的溫度給出高精度的量檢結果。
分享友人