較流灣 的英文怎麼說
中文拼音 [jiàoliúwān]
較流灣
英文
kau lau wan-
The rock types comprise the delta front subfacies subaqueous distributary channel, channel - mouth bar and distal bar microfacies, and delta plain subfacies subaerial distributary channel microfacies sandstones and siltstones. as for the reservoir quality, the subaqueous ( subaerial ) distributary microfacies channel sandstones are the first, the channel - mouth bar microfacies sandstones come second, the distal bar microfacies sandstones is the third, and the last one is the interdistributary bay microfacies sandstones. the intense compaction, pressure solution and late carbonate cementation are responsible for the reduction of the porosity and permeability of the reservoir rocks
三角洲前緣水下分流河道、河口砂壩、遠砂壩及三角洲平原水上分流河道微相決定了儲集巖的發育,分佈及原始物性條件;水下(上)分流河道微相砂體厚度大、物性和孔隙結構好,次之為河口砂壩微相砂體,遠砂壩微相砂體儲集性較差,而分流伺灣微相砂體物性和孔隙結構最差。In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively
本文通過試驗研究與理論分析對旋流式豎井泄洪洞應用於高水頭、大泄流量情況時存在的一些水力學問題進行了研究和探討,取得以下主要成果:一、結合小灣工程導流洞改建,對高水頭( 252m ) 、大泄流量( 1400m ~ 3 s )條件下旋流式豎井中的水流運動特徵進行了比較全面的測量,包括空腔形態、徑向流速分佈及井壁壓強等;二、提出了豎井空腔段螺旋水流水力計算方法,其計算結果與實測值吻合良好;三、利用試驗與計算結果,對旋流式豎井的消能機理進行了探討,對豎井各部分的消能能力有了總體認識;四、對豎井下部消力井的合理井深進行了優化試驗研究,發現消力井合理深度為0 . 9d左右;五、通過試驗研究,歸納出豎井水流總摻氣量估算方法,為導流洞排氣方案的設計提供了參考依據;六、在高水頭、大流量條件下,豎井空腔段下部流速很高,盡管水流螺旋運動引起的離心力可以確保井壁壓強保持正壓,但空化數依然較低,因此豎井的空化空蝕始終是工程界關注的重大問題。To choice good excavating scheme, this article engages in hydraulic model tests and numerical simulation on the movable bed
為了選擇較好的清挖方案,本文對太平灣電廠下遊河道進行了動床水力模型試驗及動床水流數值模擬研究。Along with the enlargement of consumption, development of businessman stratum, diversification of peasants " way of making a living as well as the local economic structure becoming market, the towns and x ushi in the region surrounding taiwan strait made great progress in the later period of ming dynasty. the sphere of the cities such as fuzhou, quanzhou, zhangzhou, jianning, nanping, shaowu, tingzhou, chaozhou was quite expanded, and teeming towns emerged in the bay of xiamen and on the plain of chaozhou. the business was booming in the cities and the numbers of xushi in the countrysides increased greatly
商品流通也造成閩潮經濟結構的變更,消費擴大、商人階層發展、農民謀生方式多元化,以及地方經濟結構市場化的趨勢,使晚明環臺海區域的城鎮與墟市有很大發展,福州、泉州、漳州、建寧府城、南平、邵武、汀州、潮州等城市的城區都有較大的擴張,廈門灣與潮州平原出現了城鎮群落,城市商業繁榮,農村的墟市數量有很大的增長。In the liaodong bay, the seawater moves in clockwise in winter and in anticlockwise in summer. the seawater movement is complexer than the previous research works
對于萊州灣,由於其水深較淺,影響環流的形式和變化的因素較多,因此其海水流動態勢也就較復雜。The distribution of lrgr summer mean rainfall was determined by the obstructing effect and two stronger ascending airflow that come from bengal bay and south sea and converge around corresponding windward slopes ; the general circulation distribution in meridional section is equal, which showed the passing - effect of lrgr
縱向嶺谷區多年平均夏季降水空間分佈主要由縱向嶺谷的「阻隔」效應,以及夏季從孟加拉灣來的氣流和從南海來的氣流在相應迎風坡面輻合,形成兩支較強的上升氣流所致;而縱向剖面大氣環流的變化則較為均勻,顯示了縱向嶺谷的「通道」效應。Based on the comprehensive analysis of the road traffic flow ' s characteristics due to the bus stop without bus bay, the multivariate linear models of the speed and the headway are formed with the variables of the stop frequency, the stop time, the overall length of the stop and its reserve time of the bus and the vehicle flow applying the software of excel, and then the strict mathematical checks are made
文章首先比較全面地分析非港灣式公交停車影響下道路交通流特徵,然後藉助于excel軟體,構建關于公交停車頻率、公交停車時間、最大公交停車長度及其存在時間、道路流量的車速和車頭時距多元線性模型,並進行了嚴格的數學檢驗。According to the selected project, a stability test with scale of 1 : 35 of cushion bottom had been done. with the research results of the experiments and the flow shape of xiao wan hydraulic power station were thought about, on the other hand, the ternary complex jet shape of baishan water cushion was analyzed, all this gave a base for the analysis of the force of the cushion bottom. through observation, the dynamic water pressure, the fluctuation pressure, the time - homogeneous pressure on the surface of the bottom and the characteristics of the fluctuation pressure could be got, also the calculation method and the test results were compared to get the argument
針對選定的方案,進一步做了1 : 35比尺的水墊塘底板穩定性試驗;通過試驗及借鑒小灣水墊塘內水流流態的研究成果,分析白山水墊塘內三元復雜淹沒射流流態,為水墊塘內底板受力分析打下基礎;通過觀測得到水墊塘底板動水沖擊壓力、脈動壓力、底板上下表面的時均壓力及脈動壓力特性,並通過計算方法與試驗成果進行相互比較論證。Seven western states are stuck trying to wring more water from the drought - ridden colorado river, which is already reduced to 0. 1 percent of its volume by the time it reaches the gulf of california
7個西部州正設法在乾涸的科羅拉多河抽取更多的水,該河流的水量較同期到達加利福尼亞灣下降了0 . 1 % 。When the tcf in nwp is high, the bengal bay cef which located at 90 e is strong and the new guinea cef located at 150 e is weak ; there is a anti - cyclonic circulation near the equator. the equatorial buffer zone is fortified : it is propitious to the equatorial anticyclones activated and push monsoon trough to higher latitude, this circulation pattern can promote the genesis of tc in nwp
多熱帶氣旋年,位於90 e附近的孟加拉灣越赤道氣流顯著增強,而位於150 e附近的新幾內亞越赤道氣流異常偏弱;在赤道附近存在一個異常的反氣旋性環流,赤道緩沖帶較強,有利於赤道高壓的活躍,季風槽被推向較高緯度,從而有利於熱帶氣旋的生成。However, with a reduction in the forecast employment in the central reclamation due to changes in land use assumptions since the second railway development study, and the anticipated opening of shatin to central link ahead of the nil, which would share some of the cross - harbour trips and relieve the nathan road section of twl, it has been decided in early 2003 that the completion of nil would be deferred to beyond 2016
不過,自第二次鐵路發展研究以來,土地用途的假設已有所改變,導致中區填海區的預計就業人口減少。此外,沙田至中環線預計會較北港島線為早通車,之後可分流部分過海乘客,從而紓緩荃灣線彌敦道段的擠塞情況。政府在2003年初決定將北港島線的完成時間押后至2016年以後。Off - peak electricity from the capco system and guangdong nuclear power station is used to pump water from a lower reservoir to an upper one. the water is allowed to flow downhill during the day to generate electricity to meet hong kong s peak demand
青山電力有限公司的電力系統及大亞灣核電站,在非用電高峰時間發電,用以將處于地勢較低的水塘的水,抽到地勢較高的水塘,到了日間便藉著水向下流的動力來發電,以滿足本港用電高峰期的需求。分享友人