輔助井 的英文怎麼說

中文拼音 [zhùjǐng]
輔助井 英文
service well
  • : Ⅰ動詞(輔助) assist; complement; help Ⅱ形容詞(輔助) subsidiary Ⅲ名詞1 (車輪外旁增縛夾轂的兩條...
  • : 動詞(幫助; 協助) help; assist; aid; support
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  • 輔助 : 1. (從旁幫助) assist 2. (非主要的) supplementary; auxiliary; subsidiary
  1. The drill and petroleum extraction tools test - well is made up of the multifunction test - machine system ( hydraulic system ), the calefaction system the circulation system, the testing system and the assistant system

    鉆采工具試驗共由多功能試驗機系統(液壓系統) 、加熱系統、循環系統、測試系統和系統組成。
  2. Discussion on auxiliary trackless transport in coal mine

    煤礦下無軌運輸
  3. In the oil - field development production performance analysis and the production management, the technical personnel often does not satisfy an independent table information to the information demand, needs to inquire many correlations information, in the possible situation by the table, the curve or the chart form presents 。 for a this basis dynamic personnel demand development set of oil - field developments assistance dynamic analysis system, including nine big modules : the information intelligence inquiry module, the information statistics module, the dynamic contrast module, the dynamic analysis module, the oil water well chooses the value module, the rate of prediction module, the cartography module, the measure plan administration module, the economic evaluation module, to carry on the rate of prediction module

    在油田開發生產動態分析和生產管理中,技術人員對信息的需求往往不滿足一個單獨的表信息,需要查詢許多相關的信息,在可能的情況下以表、曲線或圖的形式呈現。為此根據動態人員需求的開發了一套油田開發動態分析系統,包括九大模塊:信息智能查詢模塊、信息統計模塊、動態對比模塊、動態分析模塊、油水選值模塊、產量預測模塊、繪圖模塊、措施方案管理模塊、經濟評價模塊、進行產量預測模塊。
  4. Discussion on auxiliary hoisting of mine high inclined shaft

    大傾角斜提升研討
  5. Glossary of mining terms - shafts and associated equipment

    採掘術語.第9部分:豎設備
  6. Then the shear and torsion strength of the beams and the number of stirrups were checked. the program for this system is pragmatic because it includes some cases that are always met in practice

    本文所編制的預應力混凝土字梁計算機設計系統考慮了實際工程中常遇到的邊梁扭矩較大、預應力筋相碰等問題,因此具有實用性。
  7. Differential deallock measure of auxiliary conregor underground

    運輸車輛的差動閉鎖措施
  8. Fire resistance tests for service installations - service ducts and shafts

    服務設施的防火試驗.通道和通風
  9. Fire resistance tests for service installations - part 5 : service ducts and shafts

    服務設施的防火試驗.第5部分:管道和通風
  10. Influence of condensate layer on oil drainage rate of steam - assisted gravity drainage in horizontal well

    水平蒸汽重力泄油凝結水膜對泄油率的影響
  11. Auxiliary ventilation for mining ; sheet airducts, with collars and loose flanges

    通風設備.帶卡圈和活動法蘭的鋼制通風管
  12. Concrete pipes and ancillary concrete products - specification for unreinforced and reinforced concrete manholes and soakaways complementary to bs en 1917 : 2002

    預制混凝土管管配件和製品.未加筋和加筋混凝土人孔及滲水坑規范對bs1917 : 2002規范的補充
  13. E associated works including at - grade roads, drainage, sewers, watermains, slope stabilization and protection works, traffic aids, street lighting, electrical and mechanical works, traffic control and surveillance system works, fire services main, irrigation system, hard and soft landscaping, fire hydrants and emergency crossing

    進行相關的地面道路排水及污水渠輸水管斜坡鞏固護坡電氣及機械園景建築及種植花木緊急過路處工程設置交通設備交通管制及監察系統裝設街道照明設備安裝消防水管街頭灌溉系統。
  14. Auxiliary ventilation in mining ; flexible plastic air ducts for forced ventilation ; flat air ducts

    通風設備.強制式通風設備的柔性塑料空氣導管
  15. Auxiliary ventilation for mining ; flanged sheet metal reducers

    通風設備.帶法蘭的薄金屬板制異徑接頭
  16. Auxiliary ventilation for mining ; sheet metal reducers with flange and shoulder

    通風設備.帶法蘭和凸緣的薄金屬板制異徑接頭
  17. Mathematical model for computer aided lectotype design of mine ventilator

    通風機計算機選型設計的數學模型
  18. Fire resistance tests for service installations - part 5 : service ducts and shafts ; german version en 1366 - 5 : 2003

    設施的防火檢驗.第5部分:通道和副
  19. Auxiliary ventilation for mining ; cladding material for flexible airducts ; requirements, testing

    通風設備.撓性通風管用包層材料.要求檢驗
  20. Abstract : the shaft well of the xiezhuang coal mine has been designed of a poured - in - place reinfcrced concret box structure. sliding and pouring method, an alternate procedure for the construction of a coal mine shaft well project, the procedures are as following : 1, the progress of each storey " s construction has been carried out step by step duly 2, the construction of slabs and 3, during construction, the light - type network structure has been used as a complementary operating platform for the sliding formwork construction. these synchronization procedures have achieved comprehensive economic benefit and social efficiency

    文摘:協莊礦副立塔為現澆鋼筋混凝土箱形結構,採用滑一澆一工藝進行煤礦塔施工,施工順序為塔壁逐層滑升,梁板逐層跟進,施工中利用塔屋面輕型網架結構作為滑模操作平臺,同步滑升,取得了較好的綜合經濟效益和社會效益。
分享友人