輸泥管 的英文怎麼說

中文拼音 [shūguǎn]
輸泥管 英文
dredging pipe
  • : Ⅰ動詞1 (運輸; 運送) transport; convey 2 [書面語] (捐獻) contribute money; donate 3 (失敗) l...
  • : 泥名詞1 (含水的半固體狀的土) mud; mire 2 (像泥的東西) any paste like matter; mashed vegetable...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  1. Asbestos - cement pressure pipe for bittern transmission

    石棉水鹽鹵
  2. Widely employed in coal mine, downhole coal bunker, coal washery, cement factory, foundary, thermal power plant, sintering plant coal gas factory, fertilizer plant, chemicals plant, aluminium plant, alkali factory, steel works, coking plant, pharmaceutical factory, mine, dock, foodstuff, and feedings process works, concrete process, etc. with bunker, hopper, transmitting pipeline and drawshaft

    廣泛用於煤礦、及井下煤倉、洗煤廠、水廠、鑄造廠、火力發電廠、燒結廠、煤氣廠、化肥廠、化工廠、鋁廠、制堿廠、鋼鐵廠、焦化廠、制藥廠、礦山、碼頭、糧食、飼料加工廠、混凝土加工廠等擁有料倉、料斗、道和礦山溜井的廠礦企業。
  3. Helical-corrugated pipe can deliver more sediment with a given power input than either standard corrugated or plain pipe.

    螺旋皺紋與標準皺紋或平整面的道相比較,可以送更多的沙。
  4. Abstract : the paper introduced the theory of piping transportation of the 1 500 deadweight ton bulk cement barge, and provided the numeration and selection method of main parameters, such as pipe diameter, wind pressure, flux, etc

    文摘:介紹了1500t散裝水船的水送原理,給出了該船上壓縮空氣、流化空氣和水裝卸徑、風壓、流量參數的計算和選用方法。
  5. The work of this paper lays the solid foundation for the experimental research on dredging pump performance and hydraulic transport properties

    本文所作的工作為疏浚泵與道水力送實驗系統的實驗研究打下了堅實的基礎。
  6. Dredging pump and hydraulic transport experimental system proposed in this paper is mainly used for the experimental study of dredging pump performance and the solid - liquid two - phase flow in pipelines

    本文研製的疏浚泵與道水力送實驗系統,主要用於疏浚泵性能及道固液兩相流的測試研究。
  7. Quick - acting coupler for discharging pipe of pneumatic discharging bulkcement truck

    氣卸散裝水送車卸料快速接頭
  8. The whole project comprised the building of the dam, a 2, 428 - yard tunnel driven through the wong nai chung gap valley and a 5, 500 - yard brick and stone aqueduct to connect the reservoir with the storage tank and filter beds at albany road. each day the volume of water being conveyed reached 7 million gallons. the 6 filter beds of the project were situated on the eastern side of the albany nullah ; measuring 3, 245 sq

    除水壩外,其他配套的工程包括: (一)一條長達2 , 428碼、貫穿黃涌峽谷的隧道; (二)一條長5 , 500碼的引水道,可連接水塘隧道的亞賓尼濾水池及配水庫,該引水道用石及磚砌成,每天可水700萬加侖; (三)位於亞賓尼水渠東部的六個過濾池,該濾水系統面積廣達3 , 245平方碼,深30尺,每天可過濾570萬加侖水,原水過濾后,經一條直徑18寸鐵水,流入花園道與寶雲道交界的配水庫。
  9. Asbestos - cement pressure pipe for gas transmission

    石棉水煤氣
  10. Guides of laying for asbestos - cement water and gas pipelines

    石棉水煤氣道鋪設指南
  11. Two of the projects dealt with the dirty, disease - carrying water flowing next to the communitys walkways by constructing pipes from barrels to transport the unclean water. the third project entailed the building of a sturdy cement bridge to replace a decaying wooden one

    解決方案是用鐵桶架構成導,以傳污水第三項工程是搭建堅固的水橋,取代已腐朽的木板橋。
  12. In this paper, different approaches are employed to analyze the flow resistance of different flow patterns when transporting sands with different size

    本文對不同粒徑道水力送時的不同流態,採用不同方法進行了分析研究和理論探討。
  13. The cast basalt liner are inserted and embedded with a dense cement mortar inside the steel pipe. it can be used in higher working pressure and also easy to install and transportation. we can offer the straight pipes, bends and tees with nominal diameter of 40mm and above

    玄武巖鑄石復合事由內襯鑄石外套鋼和兩者之間的水沙漿充填層構成,它集鑄石性能和鋼性能於一身,既耐磨損耐腐蝕,又抗高壓,且安裝運方便。
  14. Abstract : large transmission main pipe line engineering, treated foundation on deep muddy, thick backfilling ground is introduced in this paper, cement mixed combined earth foundation is designed and calculated, pipe bridge 、 pipe pass through dam and etc, technical measures are also introduced

    文摘:本文介紹深淤厚填土場地大型水干工程的地基處理,水攪拌樁復合地基基礎設計與計算及過橋、過堤等的技術處理措施。
  15. Interpretations 1 : slurry transportation piping systems

    說明:漿道系統
  16. Slurry transportation piping systems

    漿道系統
  17. Asbestos - cement pressure pipes and joints for water

    石棉水及其接頭
  18. Asbestos - cement pressure pipes and joints

    石棉水及其接頭
  19. Based on the questions in the second production line of jd cement share company, such as the management of real time production data, the issuing of statistic data and the supervising of the production network, a new cement management information system of browser / server pattern is designed and implemented, in which locale data collection, transmission, storing, management, and also network real time supervising are accomplished

    在此基礎上,針對冀東水股份公司二線生產理信息系統存在的諸多問題,如實時生產數據理、統計數據發布和生產網路監控等,設計並實施了一個從現場數據採集、傳、存儲、理到網路實時監控的新型瀏覽器/服務器水理信息系統。
  20. Owing to the advance of science and technology, the expansion of the scale of construction, and the improvement of the sense of owner ' s risk management, engineering insurance will have broad market

    隨著疏浚業的發展,關于疏浚泵與道系統的動態特性研究越來越受到重視,然而由於固液兩相流動的復雜性,目前比較成熟的研究成果還不多。
分享友人