轉塔板 的英文怎麼說
中文拼音 [zhuǎntǎbǎn]
轉塔板
英文
turret plate-
Chagan sag is a secondary tectonic unit in chagandelesu depression, northeastern yingen - eji ' naqi basin, and the basement of the basin is a paleozoic fold belt of continental margin or island arc at the connection region of north china plate * tarim plate and kazakstan plate, with the character of erogenic belt. in working area and its adjacent area, the forming tectonic setting of indosinian intrusion was that orogenic belt pressed strongly, intracontinental subduction ; that of early yanshan movement epoch was the stress field transferred from compression to extension meanwhile the incrassate crust of orogenic zone turned to extensional collapse ; and that of early cretaceous volcanics was that the area structure extensional collapse further more during the post period of orogenic phase
查干凹陷屬于銀根?額濟納旗盆地東北端查干德勒蘇坳陷內的一個次級構造單元,其盆地基底為古生代時期華北板塊、哈薩克斯坦板塊和塔里木板塊交接部位形成的陸緣或島弧褶皺帶,具有古生代造山帶的性質。研究區及鄰區印支期侵入巖形成於造山帶強烈擠壓陸內俯沖的構造環境;燕山早期侵入巖形成於由擠壓轉向拉伸、造山帶的增厚陸殼開始發生伸展垮塌的構造環境;早白堊世火山巖形成於造山期后進一步發生伸展垮塌的區域構造環境。At first, in the process of experiments, it were measured that dry plate pressures drop and point pressures in the flow fields around the single fixed - valve and double fixed - valves under different velocities by using of pitot tube. after that point pressure was transformed to point velocity, two dimensions flow plane of flow fields around fixed - valve were plotted to observe the difference between of the fixed - valve tray with fold edges and the common rectangular fixed - valve tray on the distributions of flow fields and pressures, to provide comparisons and refer - rence for cfd simulation
在實驗中,利用測速管等儀器對在不同速度下的單閥和雙閥固定閥周圍的流場進行了點壓力測量,然後把點壓力轉化為點速度后繪出固定閥周圍流場的二維流線圖,同時測定了塔板的干板壓降,來考察新型固定閥帶折邊后對流場分佈和壓降的影響,為隨后的數值模擬提供對比和依據。The industrial application showed that the key process parameters, such as the regenerator dense phase temperature and the temperature under the first tray of the fractionator bottom, etc. were obviously improved, which resulted in increasing conversion and light oil yield
工業實踐表明,應用此控制明顯地改善了對再生催化劑溫度、分餾塔底第一層板下溫度等關鍵工藝參數的控制,提高了裝置的轉化率與輕油收率。Accessoties of single spindle turret automatic lathes. die holder. dimensions
單軸轉塔自動車床輔具.板牙架.尺寸In accordance with the occurrence behavior of roof strata and the fracture characteristics of key stratum in shallow seam longwall mining, studied post - buckling behavior of roof key stratum in the process of mining by using initial post - buckling theory, which derived a critical load and a breaking span of the main roof during the first weighting, determined the final subsidence and the maximum rotation angle for broken key stratum, and presented an application with the example of daliuta 1203 face
摘要根據淺埋煤層頂板巖層的賦存特點和長壁開采時關鍵層的變形破斷特徵,應用初始后屈曲理論探討了開采過程中頂板關鍵層的后屈曲性態,得出了老頂初次來壓時頂板的臨界載荷和破斷步距,確定了頂板破斷后的極限下沉量和回轉角,並以神東礦區大柳塔1203工作面為例給出了工程實例。Good agreement is obtained between present cfd predictions and published experimental data of solari and bell [ 77 ]. the maximum standard error of the result is 18. 9 %. the results can reflect the phenomena of different circulation area along the height of liquid layer and above the inlet baffle
在1 . 2米塔徑的冷模篩板塔上,提出使用熱膜流速儀通過在平面內旋轉探針測量三維流速的新方法,與計算結果的對比有力地說明了該方法是正確的。From above analysis, the thesis gets conclusions as following : ( 1 ) the frequencies of multi - tower building are so dense and the coupling in each mode is so evident that the cqc method instead of srss should be used to calculate the seismic action effect ; ( 2 ) torsion effects is distinct between the modes of asymmetry multi - tower structure and it is necessary to take translation - torsion coupling into account ; ( 3 ) the effect of the enlarged base rigid on the seismic properties is very big, the rigid ratio of the enlarged base to towers in asymmetry multi - tower structure should be designed in a proper range ; ( 4 ) the distribution of plane rigid is asymmetry because of the asymmetry layout of towers. the torsion effects of structure not only result in large torsion internal force in vertical element resisting lateral displacement, but also make large influences on the stress of transfer plate and near floors, thus it is necessary to strengthen those floors
通過上述分析,得出以下主要結論:多塔樓結構存在頻率密集現象,各振型間耦聯效應明顯,地震作用計算應採用cqc組合原則而不能簡單地採用srss組合原則;非對稱多塔結構的振型中,扭轉作用明顯,平扭耦聯效應值得考慮;裙樓剛度對整體結構的抗震性能影響很大,非對稱多塔結構宜控制裙樓與塔樓剛度比在適宜的范圍;非對稱多塔易導致平面剛度分佈不均勻,結構扭轉效應不僅在豎向抗側構件中引起較大的扭轉內力,對轉換層樓板應力有較大的影響,且延續至相鄰樓層,對相應樓層均應採取相應的加強措施。The ratio of story shear rigidity as well as the equivalent lateral rigidity ratio of story above the transfer story to the story under the transfer story should be designed properly to avoid the transfer story becoming weak story, thus the shear walls and the columns in the large base will not yield before the elements above the transfer story ; ( 2 ) the translation - torsion coupled effects and the vibration in the plane should be considered in analysis of structure with large base and muti - towers
轉換層的設計除應控制層剪切剛度比外,還應控制轉換層上部與下部結構的等效側向剛度比以避免薄弱層出現在框支層,保證地震作用下落地剪力墻和框支柱不先於轉換層上部結構進入屈服狀態;大底盤多塔樓結構的分析必須考慮平扭耦聯振動和樓板平面內振動的影響。In this paper, three - tower building with name of oriental tunes square in xiamen is analyzed by the international current program sap2000, considering seismic action in two directions. by structural modeling and calculation, the characteristic of vibration of the multi - tower structure is analyzed, the influences of the rigid ratio of the enlarged base to top tower and translation - torsion coupled effects among several towers are investigated, the inter - story displacement, displacement of the top tower and deformation of tower ' s base floor in x and y major orientation under earthquake action are contrasted with those under wind load. at last, the distributing characteristics of stress of transfer plate and of the normal, shearing stress of mostly vertical elements under earthquake action are studied
本文以具有3個塔樓的廈門東方時代廣場為分析對象,採用國際通用有限元分析軟體sap2000進行結構建模和分析,考慮雙向地震動輸入,研究結構的振動特性,分析底盤與塔樓剛度比對結構的影響以及多塔之間的扭轉效應和平扭耦聯作用,對比風荷載和地震作用下塔樓在兩個結構主軸方向的層間位移、頂點位移以及塔樓底層的變形,分析地震作用下轉換層樓板的應力分佈特點及主要豎向構件的正應力和剪應力分佈特點。More dolls can move on a flatbed train which coils around twin connected spiral towers
可以把大部分洋娃娃搬運到平板拖車(列車)上,讓它隨著拖車在螺旋雙塔一起旋轉展示The shanghai number permanent rj mold has made the limited companyto be established since 1996, established wicks ( wilkes ) the brandseries mold, passes through more than 10 years development, hasestablished the leading status in the national mold profession, unceasingly grows along with the company, we already become from thenumerical control knee bend mold to the numerical control ztcm and the plate cutter bit omni - directional numerical controlplate work processing equipment cutting tool mold supplier
上海數恆刃具模具製造有限公司自1996年成立以來,創立了威克斯( wilkes )品牌系列模具,經過十多年的發展,已在全國模具行業確立了領先地位,隨著公司不斷成長,我們已經成為從數控折彎模具到數控轉塔沖模及剪板機刀片的全方位數控鈑金加工設備刀具模具的供應商。分享友人