造成過載 的英文怎麼說

中文拼音 [zàochéngguòzǎi]
造成過載 英文
g loading
  • : Ⅰ動詞1 (做; 製作) make; build; create; produce 2 (假編) cook up; fabricate; concoct 3 [書面語...
  • : Ⅰ動詞1 (完成; 成功) accomplish; succeed 2 (成為; 變為) become; turn into 3 (成全) help comp...
  • : 過Ⅰ動詞[口語] (超越) go beyond the limit; undue; excessiveⅡ名詞(姓氏) a surname
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • 造成 : give rise to; bring about; create; cause; effect; engender
  1. The hot wire is caused by overload

    電線發熱是由於的。
  2. To verify the integration of st901 gene into transgenic plants genome, the stable transgenic plants were analyzed by pcr and southern blotting. the aberrant phenotypes were observed in pollens and anthers of the transgenic plants. most of pollen grains in the transgenic plant were distorted, shrunken, invagination and not stained with the solution of acetocarmine

    對轉基因植株花粉、花藥形態的觀察和花粉活力的測定,表明st901啟動子驅動的st901基因在轉基因植株中的表達花粉嚴重敗育,花粉粒皺縮,扁癟、塌陷,缺乏內容物;轉反向表達體的馬鈴薯花粉育性僅為對照的5 . 2 ,育性下降94 . 8 。
  3. Because the air - borne imaging system is required a far acting distance and the focal length of its optical system is long. influenced by the unsteady or moving platform mounted on plane, the change between the frames of image sequence is more. problems of image fuzziness and instability tend to be striking out, which becomes a bottleneck restricting the air - borne reconnaissance, collimation, evaluating beat effect

    光電像系統,由於要求作用距離遠,故其光學系統焦距長,受其體姿態變化和振動的影響,圖像序列幀間變化大,觀察者覺得模糊、不穩定,己為制約空中偵察、瞄準、打擊效果評估等功能的瓶頸。
  4. Mehrabpur, pakistan ( reuters ) - a pakistani express train packed with holiday travelers derailed on wednesday killing 58 people and injuring more than 120, officials said

    巴基斯坦的官方說,星期三一輛滿節日旅客的快車出軌,58人死,超120人受傷。
  5. The experimental results show that the surface charging is related with the pre - flashover events, the pre - flashover events can bring the change of surface charge distribution. these may be attributed to the micro - discharge caused by the traps in insulator. the charge carriers can be captured by traps, a space electric field will be set up by the trap centers, and the combined electric field may exceed the breakdown electric field of local area, then the micro - discharge will be initiated

    分析表明,反向預閃絡現象與材料的陷阱分佈有關,試樣中電極附近的陷阱中心俘獲流子后所形的空間電場的作用是產生這一現象的原因;預閃絡現象和表面帶電現象都是由於絕緣子表面陷阱中心俘獲流子形空間電場局部場強強引發的局部放電形的。
  6. For the reason of center plate split, in the raising speed and heavy - load transportation, the vehicles temporary repair rate rise continually. under existing technical condition, this paper analyzed the reason of center plate split, and gave the corresponding measurements to improve the quality of the center plate repair by ameliorating the technological process

    在鐵路提速、重運輸中,有因車輛心盤裂損而車輛臨修率持續增加的現象,對心盤裂損故障的原因進行了分析,提出了在現有技術條件下,通改進心盤檢修工藝來提高心盤檢修質量,以及管理上應採取的措施。
  7. Through the research and analysis on the three aspects concerning the base interface of the pavement panel, crack accumulation, expansion in the pavement panel and interaction between spring plates on the road surface as well as its damage on the road fatigue, it is first brought forth that the process of fissures and breakage in the cement concrete pavement can be divided into three stages, i. e. stage of initial crack formation and damage in the bottom of the pavement slab, stage of accumulation, intensifying & expansion in ruptures from load during the time of use and stage of fissures & breakage in the pavement

    對路面板底界面開裂、路面板中裂縫積聚、擴展和路面表面車板相互作用及其對路面疲勞破壞的影響等三個層面的研究和分析,首次提出水泥混凝土路面的開裂和破壞程可以分為三個階段,即路面板底初始損傷西南交通大學博士研究生學位論文第11頁和早期裂縫的形階段、使用期間荷作用對路面的開裂損傷累計、加劇和裂縫擴展階段以及路面斷裂破壞階段。
  8. The possible factors including the deviation of temperature in length and breadth of rod, the changes of transfiguration resisting force under the changes of temperature, the adjustment of roll gap, the variation of rolling pressure, the changes of roller speed during dynamic adjusting press, the unmatched of seconds - flux under the dimension fluctuation of the coming sample and so on. the whole system was a closed loop which factors in it interacts each other

    可能的影響因素有:沿軋件縱橫向溫度變化、由溫度引起的軋件變形抗力變化、軋機輥縫值變化、負變化、電機調節系統由不穩定向穩定程中軋輥轉速的變化(如咬鋼程中的動態速降后的回復階段) 、來料尺寸波動秒流量不匹配等,整個模擬系統是各個因素相互影響關聯的一個閉環系統。
  9. Frequently clear the attachment on impellers to avoid load increasing, so as to not damage aerator by overload

    應經常清除葉輪附著物,防止負荷增加,以免造成過載運行而損壞增氧機。
  10. Based on this dynamic model, lots of simulations are carried out in this paper. track conditions are conducted in the following ways : wheel damage, sinusoidal irregularities curved track and analytic irregularities, aimed at every track condition, lots of analysis are preformed to find out the main wheel - rail interaction and response of the wagon components. orso some parameters are discussed in the paper

    在第六章,本文以德國高幹擾隨機不平順線路激勵作為直線線路,對空車動力學性能進行了模擬計算,通分析發現:對于空車工況,車輛脫軌主要是由於大的輪重減的。
  11. Long lines that get wrapped in the wrong places by email clients are difficult to read and have problems loading

    行長長會有的電子郵件客戶端出現排版錯誤,以至於帶來閱讀困難,也會入文件時出現問題。
  12. In actual engineering applications, its wear resistance reduces due to the high temperature resulted from the continuous and heavy load service, which cannot fit the demand of engineering applications. based on the recent research throughout the world, in order to improve mechanical properties and wear resistance at high temperature of za27 alloy, si and mn are added to modify its microstructure. its microstructure and mechanical properties are tested and the sliding friction at ambient temperature and sliding friction at high temperature of znalsi and znaimn are studied

    本文研究了za系合金中應用最廣泛的za27合金,針對企業在工業應用程中發現za27在中低速重連續工作時,因溫升耐磨性下降,難以滿足工況要求的實際情況,為進一步提高其力學性能和高溫耐磨性,結合國內外研究現狀,在za27合金基礎上,添加si 、 mn合金元素調整合金的組織,通顯微組織分析和常溫機械性能測試,以探索znalsi及znalmn合金常溫及高溫滑動摩擦條件下的摩擦特性。
  13. Not all of the damages belong to the fatigue damage mode supposed by exist specifications. as the bearing capacity of a pavement structure is limited, excessive load may damage the pavement structure at one action

    這些破壞不完全是現行規范所假定的疲勞破壞模式,由於路面結構的承能力有限,大的軸一次作用就可能路面結構的破壞。
  14. After one power plant in ohio had shut down, elevated power loads overheated high - voltage lines, which sagged into trees and short - circuited

    俄亥俄州一座發電廠跳機后,暴增的電力負使高壓線路熱,電線垂掛在樹上短路。
  15. During aircraft take - off and landing phases, the dynamic loads and vibrations caused by landing impact and the unevenness of runway will result in airframe fatigue, discomfort of passenger and the reduction of the pilot ' s ability to control the aircraft

    在飛機起飛和著陸程中,由著陸沖擊和跑道不平引起的沖擊荷和振動,會飛機機體疲勞損傷、乘客不適及地面駕駛操縱能力的降低。因此,在設計飛機起落架緩沖器時,必須限制起落架傳遞給飛機的沖擊荷。
  16. When switching the no - load overhead lines by alternating - current high - voltage circuit breaker which is a kind of daily operations in electric power system, over - voltage is probably bringed out and insulating property of the electric devices is breakdowned sometimes, especially, when occuring re - strike. the main purposes that the tests on switching line - charging current are performed in the laboratory are assessing re - strike performance of circuit - breakers. according to the test results, the design of the circuit - breaker is optimized and re - strike performance is improved

    交流高壓斷路器是電力系統中最關鍵最重要的設備之一,斷路器開合空架空線路是電力系統中常見的操作,操作程中通常會出現電壓,對系統絕緣威脅,嚴重時會破壞系統的絕緣性能,發生事故,隨著電力系統電壓等級的提高、輸電線路不斷延長及傳輸容量的增大,由操作電壓引起的絕緣閃絡、設備破壞事故的幾率更加突出。
  17. The alternative defensive ability of structures refers to their ability to adjust the internal forces automatically to avoid the continuation of damage and maintain the whole structure stability when local members failed unexpectedly due to abnormal events or severe local overloading

    摘要結構的二次防禦能力是指結構因突發事件或局部嚴重超部分構件突然失效時,結構自行調整內力、阻止破壞程的延續、保證結構不發生整體破壞的能力。
  18. The new drive system adopts gear drive instead of the traditional rubber belt transmission, therefore realizes optimum transmission of pumping unit by overcoming the disadvantages of the belt transmission

    該系統把傳統的抽油機膠帶傳動改變為齒輪硬性傳動,徹底克服了因膠帶傳動而的抽油機傳動效率低、電動機被燒毀,以及因慣性抽油機的沖擊和振動等弊端,實現了傳動最優化。
  19. Because the status of web is not very good currently, the time delay that is caused by web transmission hampers the development of distributed virtual experiment

    由於當前網路狀況不是很理想,網路負的延時影響實驗的效果,為制約虛擬實驗發展的瓶頸。
  20. The voltage is manually regulated by non - load machine switch, which is apt to be burnt. as a result, frequent fixing is inevitable ; moreover, these methods of controlling cannot meet the needs of processing certain work pieces

    電壓調節通人工轉換無分接開關機械觸點實現,分接開關容易燒壞,維修頻繁,並且溫度波動大,有時不能滿足某些工件的加工要求。
分享友人