連接鋼筋 的英文怎麼說

中文拼音 [liánjiēgāngjīn]
連接鋼筋 英文
connecting reinforcement
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : 鋼名詞(鐵和碳的合金) steel
  • : 名詞1 (肌的舊稱) muscle2 [口語] (肌腱或骨頭的韌帶) tendon; sinew 3 [口語] (可以看見的皮下靜...
  • 連接 : connect; fit together; link; marry; mate; joint; association trail; linkage; concatenate; concate...
  • 鋼筋 : concrete iron; concrete reinforcing bars; rebar; reinforcing bar; reinforced bar; reinforcing ste...
  1. The main components of the latter are multi - rib sandwich panels, including floor slabs and wall slabs. reinforced concrete conformation columns are set where the longitudinal walls and latitudinal walls intersect and copulative beams are set where floor slabs and wall slabs intersect. they play a role of linking and transferring loads, bearing a small part of loads at the same time

    無骨架體系的主要承重構件是密肋夾芯板(包括樓板和墻板) ,縱、橫墻相交處設混凝土構造()柱,墻板和樓板相交處設系(圈)梁,系梁和柱主要起和傳遞荷載作用,也承擔少部分荷載。
  2. Supervising the quality of thread rolling bar connection

    滾軋直螺紋質量監理控制
  3. New technique for steel wire joint - rolling press straight thread conjunction

    等強度剝肋滾壓直螺紋技術的應用
  4. Quality control of steel bar rolling amp; amp; linear whorl connection

    剝肋滾壓直螺紋的質量控制
  5. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用高壓水流沖毛技術,大大提高了施工工效,減少了倉面污染;模板工程大量採用定型模板施工技術,提高了壩體混凝土成型質量和工程進度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採用永久性免拆金屬模板網作為一期混凝土模板;改進傳統的電焊方式,採用大量採用頭機械技術,有效提高了頭強度和速度,施工安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期工程持續高強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體性和耐久性。
  6. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通穿柱法」做承臺梁, 「抗彎抗剪錨法」強化柱加固效果, 「板箍法」做地基梁點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用砼護壁確保挖孔樁的安全成型,使用柔性鉤進行籠吊裝簡化施工工序;承臺梁施工採用梁主橫穿柱身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  7. Thecalculating results show that the composite action between concrete floor and steel beamsgreatly influence the bending bearing capacity and initial rotational stiffness of joints, it shouldbe considered in practical engineer. reinforcement ratio of lengthways reinforcing bar andthe stiffener of web have great influencer on the behavior of connections, while the thicknessof end - plate and degree of shear connection have a litter influence on its behavior

    分析計算結果表明:樓板與梁的組合作用對節點的抗彎承載力及初始轉動剛度的影響非常大,實際工程中節點設計應當考慮這種組合作用;樓板內縱向率與柱腹板加勁肋對節點性能影響顯著,而端板厚度及剪力程度的影響則不是太顯著。
  8. The application of cold squeeze faucet joint technology for ribbed reinforcement in hangzhou bay cross - sea bridge

    帶肋套筒冷擠壓技術在杭州灣跨海大橋中的應用
  9. In the construction of the tanghe inverted siphon on mid - roule of south - to - north water transfer project, some reliable construction processes and techniques are applied such as belt conveyor with three - rail gantry, construction with combined steel formwork, straight screw sleeve connection for reinforcement and the crushed stone - planting method etc., by which better construction effects are obtained

    摘要南水北調中線唐河倒虹吸工程項目施工中,根據工程特點,採用了三軌門架式皮帶布料機、模板聯體施工、滾壓直螺紋套筒、混凝土施工縫栽石法等可靠的施工技術和施工工藝,取得了較好的效果。
  10. The company ' s main products include : ordinary - type, forward - and - backforward - thread typeandcalibre - changed type, three series and 50 - odd varieties of steel straight thread connecting sleeve piece and steel straight thread screw rolling machine, screw rolling wheel, cutting tool, reinforced thread head special gauge, moment spanner ect., auxiliary tools which are used in construction

    公司主要產品有標準型、正反絲型、變徑型三大系列五十多個品種的建築用直螺紋套筒和直螺紋(剝肋)滾絲機及滾絲輪、切削刀具、絲頭專用量規、力矩扳手等輔具。
  11. The joining technique of reinforced roller linear threaded joint

    滾壓直螺紋技術
  12. Rolled parallel thread splicing of rebars

    滾軋直螺紋
  13. Main tower - pile cap construction - stainless rebar tt layer - couplers for walls of main pylon

    主塔樁帽-tt層及供主塔韁墻壁內之的聯
  14. Juncture application of coarse screw thread reinforcing steel bar coop of main piers in xigang viaduct

    鐓粗直螺紋頭在西港高架橋主墩中的應用
  15. With the extensive application of composite structures, the behavior of composite actionbetween concrete floor and steel beams has become an attractive area for research. consideringthis kind of combination function, the frame should be designed according to steel - concretecomposite frames, and the working behavior of its beam - column connections is the basis ofanalytic foundation of such frames

    隨著組合結構的廣泛應用,考慮混凝土樓板和梁之間的組合作用也正成為人們越來越關注的研究課題,考慮這種組合作用后,框架應該按-混凝土組合框架進行分析設計,其樑柱節點半剛性工作性能的分析是這種組合框架結構分析的基礎。
  16. Post - installing technology, based on anchor research, is discussed in details and the structure requirements and design method of glass wall connections are presented

    在錨栓研究的基礎上,對緊固技術即后植入技術的應用作了詳盡的探討,綜述了國內玻璃幕墻件的構造要求以及設計方法。
  17. Reasons : firstly, sectional dimension is so little that torsional stiffness of single - beam is n ' t enough. secondly, protective layer thickness is too thin to protect concrete reinforced bar and reduce durability. lastly, each main beam is joined by cross girder and the more rigid of cross girder the more entirety of bridge

    橋梁局部損壞較嚴重,主要原因是主梁截面尺寸過小、肋板過于薄弱,造成單梁抗扭剛度不足;保護層厚度不夠導致外露引起銹蝕,降低了橋梁的耐久性;各主梁採用橫隔梁成整體,橫隔梁的剛度越大,橋梁的整體性越好,但調查結果顯示,實際情況中並不能達到理想的整體剛度。
  18. Firstly this text studied the super thick planceer of mass concrete of high - rise building with ten characteristics comparing with the common reinforced concrete, according to the above characteristic from three aspect including the reinforcing bar project, the concretes project and the form project, elaborate the construction characteristics of super thick mass concrete planceer of high - rise building, have a detailed explanation of the big reinforcing bar link technique and the pump technique of the prepared concrete

    首先本文研究了高層建築超厚底板大體積混凝土的與普通混凝土相比具有的十個特性,根據上述特性從工程、模板工程、混凝土工程三個方面闡述了高層建築超厚底板大體積混凝土的施工特點,重點就技術、預拌混凝土泵送技術進行詳細論述。
  19. This paper approaches reinforcement fabric cover, reinforcement fabric joint, reinforcement fabric embedded inserts, wall anchorage depth and wall joint form during the design of underground continuous walls, meanwhile, some problems affecting wall quality in the various sectors during construction are also discussed, including reinforcement fabric installation, groove bottom hole cleaning and quality testing equipment

    本文對地下續墻設計過程中的網保護層、駁、網預埋件、墻體錨固深度、墻體頭形式以及施工過程中網安裝、槽底清孔、質量檢測設備等各個環節中影響墻體質量的一些問題進行了探討。
  20. The results show that the antipunching shear bearing capacity and ductility of frame column underpin system are improved by installing coupling bar at the interface of the new - to - old concrete and enlarging the reinforcing bars at the centre and upper position in the underpinning beam

    結果表明:設置新老混凝土界面連接鋼筋和增大托換梁中部和上部配可提高框架柱托換體系的抗沖剪承載力和延性。
分享友人