連續斷面 的英文怎麼說

中文拼音 [liánduànmiàn]
連續斷面 英文
consecutive intersection
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : Ⅰ形容詞(連接不斷) continuous; successive Ⅱ動詞1 (接在原有的后頭) continue; extend; join 2 (...
  • : Ⅰ動詞1 (分成段) break; snap 2 (斷絕;隔斷) break off; cut off; stop 3 (戒除) give up; abstai...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • 連續 : continuation; succession; series; continuity; continuing; running; continuous; successive; contin...
  • 斷面 : section; fracture surface; plane of fracture
  1. Its behaviour is dominated by discontinuities such as faults, joints and bedding planes.

    它的性態是由像層、節理和層等這樣一類不控制的。
  2. For electrodeposition by dc methods, the metals deposite uninterrupted and the particles were also embeded uninterrupted into the coatings ; for electrodeposition by pc method, the particles with biggish volume were desorbed from the coatings and returned to the electrolyte again owing to the presence of pulse interval ; for electrodeposition by prc method, the particles carried positive charges are much more easy to desorb from the coatings owing to the effecf of reverse pulse current combined with pulse interval, in addition, the reverse pulse current also could dissovle the metals, further accelerates the desorption of particles, thus the particles size embeded in the coatings by prc method is the least

    直流電沉積時,基質金屬的沉積進行,粒子在電極表不間嵌入鍍層;單脈沖電沉積由於脈沖間歇的存在使得具有較大體積的粒子會脫附,重新回到溶液中;採用周期換向脈沖時,反向脈沖電流使表荷正電的較大的粒子更易從電極表脫附,同時,反向脈沖電流對基質金屬的溶解作用,也會促進粒子的脫附,因此鍍層中復合粒子尺寸最小。隨著鍍層中粒子復合量的增加,三種鍍層的晶粒都明顯細化,說明al _ 2o _ 3的存在阻止了晶粒的長大,提高了電沉積過程中晶核的形成速率。
  3. Due to the requirements of complex configuration of spatial curved surfaces and of continuity of fiber laying have becoming a difficult problem in cad technology for bicycle body frame of hybrid fibered compound material with multi - branch special shaped entire - body and sections of hollowed thin wall

    摘要對于多分支整體異形空心薄壁混雜纖維復合材料自行車車架,由於復雜的空間曲構形和纖維鋪設性要求成為其cad技術難題。
  4. Gouge or infilling is the material between two faces of a structural discontinuity such as a fault.

    層泥或充填物是指一個不(如層)的兩個表之間的物質。
  5. Both the landscape and architecture components of the court ? the fountains, the ? operate at a local scale to disrupt the continuum of the ground plane, circulation, and views

    構成庭園的景觀與建築元素噴泉、植栽、柱廊在局部的尺度上中了地平、動線及視線的
  6. As the increase of domestic high - rise buildings, more and more deep foundation trench supporting constructions have come into existence. among the general geographical condition of the urban district in qingdao, most of regions, which mainly consist of strong de composed rocks, are in quite good condition. except for the sandy soil and oozy soil along sea sides. but the development of rock cracks and breaking zones and unstable lamprophyre still exist, so blasting is needed during constructions of foundation trench. blasting have bad influence on the stability of slopes. moreover. the slope - liding has happened for several times, so the engineering project of foundation trench attracts more attention of people

    隨著國內高層建築的發展,深基坑支護工程越來越多,綜合青島市區的地質狀況,除海邊有砂性土及淤泥軟土外,大部分地域巖土條件相對較好,多以強風化巖為主,但巖石裂隙發育,間或有裂帶和穩定性極差的煌斑巖穿插其中,基坑施工時需要爆破施工,對邊坡的穩定造成了不利影響,加之出現的幾次滑坡失穩事件,基坑支護工程越來越引起了各方的重視。
  7. The dynamo runs at rull speed to drive main shaft, then the main shaft makes the emulsifying wings in emulsification grove rotate, which absorbs the liquid in its brand groove into ring groove through guide vanes on upper and lower sides of the groove. the vanes spins circularly at high speed with the main shatf as center, and the blade and emulsificaton groove cut and crush it continuously. after that. it gers squeezed by the vanes highspeed centrifugal rotation. at last, it finishes isotropt emulsification tratment within extremely short time after continuous circulating mixing

    由電動機全速運轉帶動主軸,經主軸轉動乳化框槽內之乳化翼片,使其將桶槽內之液體經框槽上、下兩側之導流葉片吸入環狀框槽內,經以主軸為中心高速圓周旋轉葉片;使乳化翼端刀與乳化框間極小之間系高頻率之強力切割剪、粉碎,再借葉片高速離心旋轉排擠,持循環混合,以極短之時間即可完成均質乳化之處理。
  8. The waging of mobile warfare involves many problems, such as reconnaissance, judgement, decision, combat disposition, command, concealment, concentration, advance, deployment, attack, pursuit, surprise attack, positional attack, positional defence, encounter action, retreat, night fighting, special operations, evading the strong and attacking the weak, besieging the enemy in order to strike at his reinforcements, feint attack, defence against aircraft, operating amongst several enemy forces, by - passing operations, consecutive operations, operating without a rear, the need for rest and building up energy

    運動戰的實行方,問題是很多的,例如偵察、判、決心、戰斗部署、指揮、蔭蔽、集中、開進、展開、攻擊、追擊、襲擊、陣地攻擊、陣地防禦、遭遇戰、退卻、夜戰、特種戰斗、避強打弱、圍城打援、佯攻、防空、處在幾個敵人之間、超越敵人作戰、作戰、無後方作戰、養精蓄銳之必要等等。
  9. Grinding wheel continues with an infinite number of hard, sharp and refractory grits on edge surface at a high speed of swing operation to cut and grind over the surface of work piece, and unceasing self - sharpening grains and pore continue to grind a tool for every kind of material

    砂輪是經由高速回轉運作中,以其在外緣表植無數上千萬之硬銳耐溫之小磨粒在工作物表切削磨除,且不的自生銳利顆粒與磨屑空隙氣孔,繼對各種材料做磨削工作的一種研磨工具。
  10. To unerstand precursory process before seismic fault slip, this work focuses on earthquake nucleation process on a fault plane through numerical simulation

    摘要為了把握層上地震的前兆規律,對介質中上的地震成核過程進行了數值模擬研究。
  11. The plexiglass model test is carried out by two selective shape, the stress of each test operating loads was obtained in order to validate the correctness of the finite element modeling. in this paper, a regularity of shear lag effect of main sections in two kinds of box girder is given. as the foresight project of double - level - driveway continuous box girder, this research fully utilizes the space of box girder structure and flexural and torsional properties of high - depth box girder, which have innovative significance and applied foregroundin engineering

    對所選擇的結構形式進行縮尺有機玻璃模型試驗,得到實腹箱梁和空腹箱梁在各種試驗工況荷載下的應力,通過換算分析,驗證了本文所建立的有限元模型的準確性,由此得到兩種箱梁各主要剪力滯效應的變化規律。
  12. Continuous wire drawing machines, chamfering machines, cutters share cutters, saws

    抽伸機倒棱機切切,線切
  13. In the first place, he had by that time lost the benefit of his early education : continual hard work, begun soon and concluded late, had extinguished any curiosity he once possessed in pursuit of knowledge, and any love for books or learning

    首先,他早年所受的教育,到那時已不再對他起作用了,的苦工,早起晚睡,已經撲滅了他在追求知識方所一度有過的好奇心,以及對書本或學問的喜愛。
  14. He would hammer a nail into the wood with a series of blows that continued to down long after the head was flush with the boards

    他老是地錘擊,把釘子敲進木頭,而且釘頭與板平齊之後,還是一個勁兒地敲。
  15. The author of the dissertation pay a lot efforts to focus on designing the dual - loop control circuit based on optimized psm, include : 1 ). researched the relationship of input and output voltage and output valtage ripple, when psm operate in continuous current mode and discontinuous current mode respectively. what we have done will direct psm apply to converter

    本文在psm調制理論的基礎上,設計基於優化psm調制模式的雙環控制電路,主要包括以下幾個方內容: 1 )對psm調制模式分別在工作模式下的輸入輸出電壓關系以及輸出電壓紋波進行研究,以期指導psm調制模式在變換器中的應用。
  16. ( 2 ) a series of experiments on time scale distortion are made with real river model, inflow and outflow boundary condition, and continuous simulation. by means of analysis of the experimental data on model water level, water - surface gradient, cross velocity, outflow discharge process and the sediment transportation capacity, the main physical reasons for the above hydraulic parameters deviations caused by time scale distortion are illustrated : response delay of model channel storage capacity and rate of water level with time

    ( 2 )採用真實的河工模型和入出流邊界控制條件以及模擬的方法進行了有關時間變態率的系列試驗,通過模型水位、比降、流速、出口流量過程線和挾沙力試驗資料的分析,闡明了時間變態引起上述各種水力參數偏離的主要物理原因:模型的槽蓄響應和洪水過程時間變化率的響應滯后。
  17. After wto accession of china and coming of the new century, global ecology and environment are deteriorating severely. as economy of china continued developing, consumption of natural resources was increasing, the quality of forestry resources degraded, the functions of forest ecology were gradually weakened, disastrous floods occurred in the yangtze river, songhua river and nenjiang river. meanwhile, floods also happened in the hunhe river systems of liaoning province in the 1990s of late 20th century, and droughts in western regions of liaoning have threatened the whole province

    隨著中國加入世貿組織及新世紀的到來,對全球性生態環境的不惡化以及由於我國經濟持地高速發展,對資源消耗過快過人,使森林資源品質不下降,森林維持生態平衡的功能的作用逐漸削弱,不僅我國三江發生洪水,西北乾旱加重,黃河多次出現流,遼寧在20世紀90代的渾河水系也曾發生過水災,遼寧西部乾旱日趨加重,已經威脅到整個遼寧。
  18. The nancha suspending - gay bridge of the changjiang road - bridge in jiangshu runyang, with a main span of 1490m, ranks first in china, third in the world. the north rivets, only 250m from the main stream of changjiang, have a tight liaison with the waterpower of it. especially, in this area, the face of rocks undulates a lot and exist fault - fabric. the soil there has apparent difference with the trend of water. the base - hole of north rivets can be named a super - deep one, with a 60m length, 50m widths, and 48m depths. the fence of the base takes advantages of the rectangular underground continuous wall structure and succeeds

    江蘇潤揚長江公路大橋南汊懸索橋,主跨1490m ,居中國第一,世界第三。該橋的北錨碇距長江幹流僅250m ,與長江水力聯系密切,錨碇區水文、地質情況復雜,表層淤泥質土及松軟粘土層較厚,基巖頂起伏較大,且存在裂構造,土層具明顯的流變特性。北錨碇基坑為長60m 、寬50m 、深48m的矩形超深基坑,其基礎圍護在國內首次採用矩形地下墻結構,並獲得成功。
  19. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    地下墻是一種歷史較短的施工方法,目前,砼防滲墻的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用地下墻與樁在豎向荷載作用下的工作性能有相似性,將適用於樁基的poulos彈性理論引入對地下墻的沉降計算中;清華大學水利水電工程系濮家騮、于玉貞根據三軸試驗結果確定混凝土的參數,利用非線性e - b模型,結合黃河小浪底土石壩設計剖,採用thepd土石壩總應力程序,對深覆蓋層塑性混凝土防滲墻的應力、位移進行有限元分析,並與普通混凝土防滲墻計算結果加以對比,同時分析了不同配比塑性混凝土特性的影響,並採用應力水平和拉應力數值來判塑性混凝土防滲墻的安全程度。
  20. The main research contents are as follows. 1 ) the characteristics of semi - process industry based on make - to - order are studied, which means that the purchase tune is long while the due date is short, the working procedures are successive and discontinuous. then the general structure of production system based on make - to - order mode in semi - process industry is put forward, which includes estimate of the dynamic finite resources, evaluation of the order based on rough capability balance, material requirement planning, production plan, order tracing, collection and feedback of the local data etc. they all together form an integrated and closed loop system as a whole

    研究的內容主要包括: 1 )研究了半流程製造業向訂單生產模式具有的采購期長、交貨期短和工序但工序間可間的特點,並基於此提出了適應半流程製造業向訂單生產的系統總體結構,其主要內容包括動態有限資源能力評價、基於初能力平衡的訂單評估、物料需求計劃和生產作業計劃、以及訂單跟蹤和現場數據的採集和反饋等,它們在總體上形成了一個集成的和閉環的系統。
分享友人