過渡相試驗 的英文怎麼說
中文拼音 [guòdùxiāngshìyàn]
過渡相試驗
英文
transient assay- 過 : 過Ⅰ動詞[口語] (超越) go beyond the limit; undue; excessiveⅡ名詞(姓氏) a surname
- 渡 : Ⅰ動詞1 (由此岸到彼岸;通過) cross (a river the sea etc ) 2 (渡過) tide over; pull through 3 ...
- 相 : 相Ⅰ名詞1 (相貌; 外貌) looks; appearance 2 (坐、立等的姿態) bearing; posture 3 [物理學] (相位...
- 試 : 名詞(古代占卜用的器具) astrolabe
- 驗 : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
- 過渡 : transition; transit
- 試驗 : trial; experiment; test
-
To validate the formulated transition element for the calculation of the hot - spot stress and stress concentration factor in the welded components by experimental results, the stress concentration factor of the experimental welded specimens carried out in the research group is calculated by using the developed plane - transition element. the calculated stress concentration factor in the two types of tested welding components agrees well with that obtained from the experimental result. and the calculated result on the tendency of hot - spot stresses agrees well with that from the measured result
為了驗證文中構造的過渡單元模型用於分析焊接節點附近的應力集中問題的正確性和有效性,進一步又對過渡單元模型進行實驗結果驗證,採用平面過渡單元模型計算了本課題組進行的兩類焊接構件的應力集中系數,並與根據實測方法得到的應力集中系數進行了比較,計算結果與實驗測試得到的應力集中系數和相應的熱點應力變化趨勢比較吻合,為本文建立的過渡單元的實際應用提供了初步的基礎。Because the monitoring of electricity equipment is still in the condition of traditional prophylactic test ( monitoring off line ), wordage list and management method of handwork operation, to strengthen the real - time monitoring of the operation state of electricity equipment ( monitoring on line ), find out the anomaly of equipment, monitor and analysis the fault, then take a corresponding measures to lower the fault loss so that we can make the transition between the regulations of periodic repairing equipment and the regulations of reasonable state repair, is the work which the department of power supply and operation make much of
針對對現有電氣設備的監測大都還處于傳統的預防性試驗(離線監測) 、文字報表、手工操作的管理方式的現狀,加強對電力設備的運行狀態進行實時的監測(在線監測) ,及時發現設備的異常徵兆、對故障進行診斷分析,並採取相應措施,把故障損失降低到最低水平,進而將目前實行的設備定期檢修制過渡到更為合理的狀態檢修制,一直是供電和運行部門十分重視的工作。The system of piv is constructed suitable for measuring the particle movement and the flow pattern of particle clusters is visualized in the cfb. under the low and high solid flux, this work also study the aggregate properties such as the two - dimensional shapes, velocity and existence time of clusters on several axial / radial positions
對循環流化床冷態實驗臺兩測試段進行了流型和顆粒團可視化研究,分別獲得了較低循環流率下過渡區和在高循環流率下稀相區顆粒團的運動速度,形狀,持續時間及其動態變化情況。A novel topology of dc - rail zvt voltage source three - phase pwm inverter is advanced. the principle, design considerations, modulation index and efficiency of the proposed inverter are discussed in detail
提出了一種新型直流母線零電壓過渡電壓源三相pwm逆變器,並對該電路的工作過程、參數設計、調制系數以及工作效率等進行了詳細的分析和試驗研究。Basing on the research of the geometric continuous condoition of two patches, this paper gives a method for merging two bezier surfaces with the construction of transition band which improves the result of liu ding - yuan and hu kang - sheng
摘要在研究兩曲面片間幾何連續條件基礎上,給出了運用構造過渡曲面片來光滑地連接兩相鄰曲面片的一種方法,所得結果是對劉鼎元,胡康生等研究成果的改進,並給出了本演算法的試驗結果。In the paper the initial iocation and dimension of step are studied from which we get the conclusion tha the energy dissipation is highcr if the initial location is at the curve section of l / 2 height of the spillway top and the dimension gap of neighbor step is bigger, the energy dissipation is higher
通過對階梯溢流壩的過渡階梯的起始位置和具體尺寸的試驗研究。得出過渡階梯的最佳起始位置約在壩頂曲線段1 2高度處且相鄰階梯的尺寸相差較大時,所得的消能率較高。At the same time a method of utilizing round swing transition horn is put forward to void shock produced in the process of welding two round pipelines of the same or similar diameter by such experiments and debugging
同時通過附加圓擺動的折線軌跡曲線的實驗和調試,確定了利用圓擺動過渡尖角的方法,避免了當焊接兩圓管直徑相同或是相近時在焊接過程中產生的沖擊。By means of xrek sem, mip, bet modern testing apparatus and avenue, reinforced durability of nthpc mechanism by fd - 1 is studied. it is proved that mineral admixture can prompt pore tiny, promote interface station and decrease ch phase. ca ( no2 ) 2 can activate hydration reaction at early age, but it harasses migration mechanism of water in micro - pore,
試驗證明,礦物外加劑使水泥漿體孔徑細化、水化產物相密實、界面過渡區改善、 ch晶相總量減少; ca困02 ) 2促進和穩定了ch晶體生成,但改變了水泥石中水的遷移機制,包括遷移途徑和速度。The physical experiments and theories on thermodynamics prove that gas thermal insulation coefficient changes apparently when hydraulic transition process happens. so four appropriate processes were given - sub - process 1 of compressing, sub - process 2 of inflating, sub - process 3 of inflating, sub - process 4 of compressing
試驗與理論分析表明,在管道系統發生水力過渡過程時氣體多方指數n存在較為顯著的變化,並非單一常數,從而提出了相應的四過程:即壓縮子過程1 、膨脹子過程2 、膨脹子過程3和壓縮子過程4 。Transient layer approach was used in finite element method to simulate the temperature difference between the loading liquid and the model internal wall surface, and the results of calculation and test are accordant
採用過渡層模擬加載液體與模型內表面的溫差,進行有限元計算,計算結果與試驗結果相符。分享友人