選定整個層次 的英文怎麼說

中文拼音 [xuǎndìngzhěngcéng]
選定整個層次 英文
select entire hierarchy
  • : Ⅰ動詞1. (挑選) select; choose; pick 2. (選舉) elect Ⅱ名詞(挑選出來編在一起的作品) selections; anthology
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : Ⅰ形容詞1 (全部在內; 完整) whole; all; complete 2 (整齊) neat; tidy; orderly Ⅱ動詞1 (整理; 整...
  • : 個Ⅰ量詞1 (用於沒有專用量詞的名詞) : 一個理想 an ideal; 兩個月 two months; 三個梨 three pears2 ...
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  • : Ⅰ名詞1 (次序; 等第) order; sequence 2 [書面語] (出外遠行時停留的處所) stopping place on a jou...
  • 選定 : designate; selected
  • 整個 : whole; total; entire
  1. At the same time the study analyse the structural system of the index and it ' s weight with the ahp, and choose soil quality, soil thickness, the content of organic matter, terrain, elevation and the ration of irrigated guarantee as gradation index and choose soil quality, soil thickness, the content of organic matter, terrain, elevation, the ration of irrigated guarantee, the condition of traffic, the distance from the central city, the scatter degree of field, the neat degree of field, loss of water and erosion of soil and land contamination as classification index. at the same time the study emphasize the effect of the condition of ecological condition and environmental contamination

    採用分析法對該區域農用地分等級的指標體系及其權重進行了研究,擇表質地、土厚度、有機質含量、地形、海拔、灌溉保證率等6項指標參與分等評價,取表質地、土厚度、有機質含量、地形、海拔、灌溉保證率、對外交通狀況、距市中心距離、田間道路狀況、田塊分散度、地面平度、水土流失、土地污染等13因子分指標區進行級評價,強調了生態條件及其環境污染狀況在農用地分等級中的作用。
  2. Secondly, it probes into supplier selection methodologies by combining qualitative and quantitative methods such as linear weighted method, cost operating method, hiberarchy method etc. although xet achieved improvements following the regulations of gmp when selecting their current suppliers, xet fails to put the whole supply chain into account because it limits its perspective within itself and the employed selecting method is not comprehensive and not scientific enough

    第二:希爾特製藥公司在擇合作夥伴時,雖按gmp規進行了較大的改進,仍然局限於從企業自身角度出發,沒有綜合考慮到供應鏈的情況,擇方法仍不夠全面、科學。本文著重探討使用線性權重法、成本作業法和分析法等量相結合的方法擇供應商。
  3. The technical and economic evaluation of thin - type spunbond nonwoven project has mainly finished the following research work : ( 1 ) utilize the theory and method of < marketing > for market investigation, research and forecast, analyze the developing trend and market requirement of the nonwocen abroad and at home, conduct quantitative forecast for raw materials and product price, and explain that during the essential period when liaoyang petrochemical company regulates the structure of industries and product and remodels the main business items, selecting to build up the production device for thin - type spunbond nonwoven is suitable. ( 2 ) introduce techniques of different companies to form different schemes. after analyzing the features of various schemes in the thesis, through building up the target system of four levels and utilize technical comprehensive evaluating way to conduct technical evaluation of four schemes for the thin - type spunbond nonwoven project and get the prior sequence from schemes d, b, a to c. ( 3 ) different technical schemes have various cash circulation amounts, economic evaluation is first based on evaluating and confirming feasibility of each scheme by the single scheme finance, select and use the method of multiple schemes comparison selecting - inutual repelling type multiple schemes optimization, select introducing the scheme of d company technique as the optimum, then conduct undetermined analysis to further test and verify feasibility of schemes

    闡明了遼化公司在調產業結構和產品結構、重塑主營業務的關鍵時期擇建設8000噸年薄型紡粘非織造布生產裝置是適宜的; ( 2 )引進不同公司的技術形成了不同的方案,論文在分析了各方案的特點后,通過建立四的指標體系,運用技術綜合評價的方法,對薄型紡粘非織造布項目的四方案進行技術評價,確了丁方案、乙方案、甲方案到丙方案的優先順序; ( 3 )不同的技術方案有不同的現金流量,經濟評價首先在單方案財務評價確認各方案可行的基礎上,用多方案比? ?互斥型多方案優的方法,擇引進丁公司技術的方案最優,而後,又進行了不確性分析,進一步驗證方案的可行性。
  4. The high - level outline options are discussed between users and project team in order to decide upon a manageable number of outline options to develop into full tsos. develop full tsos

    用戶及計劃推行小組會對高的方案大綱進行討論,以決發展數方案大綱,成為完的技術系統擇。
  5. That is, on the basis of project analysis, two farmland consolidation project planning and design schemes are worked out according to the natural and economic conditions and goals chosen in jiulishisanwan project ; afterwards, according to the characteristics of jiulishisanwan and the engineering contents of farmland consolidation, the thesis exerts delphi on the acception or rejection of the indexes chosen and then establishes the synthetic appraisal index system for farmland consolidation project planning and design ; employs ahp to make sure index weights and finally establishes the synthetic appraisal model for farmland consolidation project planning and design scheme to help planners make decision, by means of which, the two schemes that has worked out are evaluated respectively

    即在對九里十三灣項目進行農地理項目分析之後,針對所研究項目區的自然經濟條件和農地理具體目標擇,編制項目規劃設計多方案;然後針對所研究的項目區的特點,從農地理的工程內容入手,運用特爾斐法對取指標進行數輪取捨,構建農地理項目規劃設計方案綜合評價指標體系,結合分析法確指標權重,最終建立農地理項目規劃設計方案綜合評價模型,並對編制的兩方案進行了評價和擇優。
  6. Five factors as the motive force for the tourist development in guizhou karst terrain were proposed. the growth pole of tourist economy in guizhou karst terrain was defined in the initial use of the shift - share analysis. in the end, a tourism economic circle of guizhou karst terrain was constructed, as guiyang, anshun and zunyi being the first - level tourist circle, high graded roads as well as national and provincial highways being the axis, and the kernel layer, hinterland layer, radiation layer and extension layer of the tourist economy being the spatial radius

    通過對區域旅遊合模式的概述,結合貴州省情,擇了適合貴州喀斯特地區旅遊業發展的「點-軸-圈」模式;提出了貴州喀斯特地區旅遊發展的五動力因子;首採用「份額?偏離分析法」確出貴州喀斯特地區旅遊經濟增長極;最後以貴陽、安順、遵義為一級旅遊中心,以高等級公路、國道、省道為軸線,以旅遊經濟的核心、腹地、輻射和擴展為空間半徑,構建出貴州喀斯特地區旅遊經濟圈。
分享友人