邊壩 的英文怎麼說

中文拼音 [biān]
邊壩 英文
banbar
  • : 邊Ⅰ名詞1 (幾何圖形上夾成角的直線或圍成多邊形的線段) side; section 2 (邊緣) edge; margin; oute...
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  1. The study includes the hole color tv imagery system for drill hole, even - pole bore - hole acoustic system and acoustic meter, bore - hole multi - point consolidation apparatus, the quick camera computer - aid image for high rocky slope, image technology for layer analysis, safety monitoring technology for the section close to the dam, software for processing and forecasting the slope monitoring data, high precision geodesy monitoring automation system, etc. all the study results are new, advanced and practical, which has applied in the project and gained the obvious benefits

    鉆孔彩色電視孔壁成像系統、直接橫波測井研究偶極子井下聲系和聲波儀、鉆孔多點滲壓儀及壓模系統、巖質高坡快速攝像微機地質素描成圖、層析成像技術、近庫段安全監測技術、坡監測數據處理預報軟體研究、高精度大地測量監測自動化系統等項目,研究成果內容新、先進、實用,已在工程中應用,效益顯著。
  2. On the other side of the atlantic, the damming of african rivers has led to the spread of human blood flukes that depend on snails as a host and cause human schistosomiasis

    在大西洋的另一,由於非洲河川建了水,導致以螺類為寄主的人類血吸蟲到處散播,引發人類的血吸蟲病。
  3. The information refers to slopes in opencast mines, quarries, dam foundation excavations and highway outs.

    這份資料提供了有關露天礦、採石場,基和公路塹的坡資料。
  4. From sedimentology symbol such as rock assembled, sediment gradus, sandstone grading analysis, protogene sedimentary structure, ichnofossile and logging facies etc and palaeoenvironment background, it is confirmed that shen84 - an12block s34 segment is braid river delta system, not fan delta system ( abrupt slope ). then it can be more partition as braid river delta plain sedimentary assembled, delta front sedimentary assembled and prodelta sedimentary assembled on core and log assembled. and delta plain sedimentary assembled can be identified four microfacies : braided distributary channel, crevasse splay, overbank deposits and interdistributary bay

    沉積微相研究是儲層非均質性研究的基礎,研究區有豐富的巖芯資料和測井資料,通過巖石組合、沉積韻律,砂巖粒度分析、沉積構造、古生物遺跡和測井相等沉積學標志,結合古環境背景,確定沈84 ?安12塊s _ 3 ~ 4段為辮狀河三角洲體系,而不是前人所認為的扇三角洲(陡坡型)體系,在巖芯和測井組合上可進一步劃分為辮狀河三角洲平原沉積組合、三角洲前緣沉積組合和前三角洲沉積組合,其中三角洲平原沉積組合又可識別出辮狀分流河道、決口扇、分流河道部和分流間灣四種微相類型;三角洲前緣沉積組合識別出水下分流河道、水下分流河道部和分流河口三種微相。
  5. Application of concrete extrusion sidewall in face rock - fill dam in shuanghekou

    混凝土擠壓墻在雙河口面板堆石中的應用
  6. The dam is but the centrepiece of a colossal endeavour to transform the cities of the yangtze along a 400 - mile stretch from the wartime capital of chongqing, in the west, to the old british treaty port of yichang, in the east, towards shanghai and the sea

    三峽水只是一項改變長江沿岸城市的宏大計劃的中心部分,整個計劃范圍涉及長江沿岸400多英里的城市,從西的重慶開始,到港口都市宜昌,最後到東的入海口上海。
  7. Protection of watercourses, dikes, and coastal dunes ; guidelines

    水道堤和海沙丘的保護.指南
  8. Stand around like you chumps and let that drooling infant wrap that willet creek dam appropriation around my neck

    像你們這群廢物一樣站在一,讓那個流著口水的小孩把我們的白鶴溪大整個毀了?
  9. The excavation on the left side of xiangjiaba hydropower plant would form the large - scale artificial slope, which refers to the main project near the source of the river and the project of intake sea - route near the mouth of the river, and its height would reach 150 meters

    向家水電站左岸開挖將形成規模較大的人工高坡,涉及上游段的主體工程和下游段的引航道工程,工程坡的高度達150m 。
  10. This paper establishes a model simulating dam actual placing process and considering the non - continuity of initial temperature on the boundary of new and old concrete, daily air temperature change, concrete - placing temperature, hydration heat, heat insulation on boundary, water - storing process, placing intermission and curing with water. the calculation of stress field considers the concrete weight, static water pressure, thermal stress, different autogenous volume change between rcc and normal concrete, change of elastic modulus of concrete with age and creep action

    考慮了乞今最為全面的初始條件和界條件,包括模擬體的實際升程過程,考慮了新老混凝土接觸面上的初始溫度不連續,逐日的氣溫變化,混凝土的入倉溫度,水化熱溫升,界保溫,水庫蓄水過程,澆築間歇以及灑水養生等因素;應力場的計算考慮了混凝土的自重,靜水壓力,溫度應力,常態混凝土與碾壓混凝土不同的自生體積變形,混凝土的彈性模量隨齡期的變化以及徐變的作用。
  11. Taken the bank spillway at yubeishan reservoir as an example, the water loads acted on the spillway, such as static water pressure, dynamic water pressure, shear stress on the surface of the step and so on, are calculated, which can provide evidence to the stability analysis of the dam slope and slope protection

    並以萬縣魚背山水庫岸溢洪道為例,計算了溢洪道上所受的水流荷載及其分佈,為土石坡和護面的穩定分析提供了依據。通過計算證實了既使在較大的單寬流量下,緩坡上的階梯仍有較高的消能率。
  12. The engineering reaction analysis is divided stability analysis of high rock slope and deformation and skidresistance of rock mass on dam abutment

    工程效應分析分成高坡穩定性分析和肩變形及抗滑穩定性分析。
  13. Relating closely to the main problem of the high sidewall and wide span underground cavities excavation stability of xiluodu hydroelectric project, the evolution characters of geo - stress field in deep - cutting gorge and the whole features of the stress field, strain field and plastic failure zone around the underground chambers after excavation are studied systematically in the dissertation, based on a great deal of data gathered in field investigation and taking the flac3d v2. 0 software as basic computation tools. meanwhile, in the course of research, the new methods of dynamic numerical simulation are summarized and applied. furthermore, the effects of rock mass qualities, initial geo - stress field and excavation procedure on surrounding rock mass stability are discussed

    本文緊密結合溪洛渡水電工程大跨度、高墻復雜地下廠房洞室群,施工開挖過程中和開挖后圍巖穩定性研究這一重大課題,在詳盡的野外地質調查工作和對大量基礎地質資料的整理與分析基礎上,以目前國際工程地質界公認的最新通用軟體flac ~ ( 3d ) 2 . 0版作為基本計算工具,從整個區地應力場的研究開始,通過動態數值模擬分析這一新的模擬思路,系統地研究了深切峽谷區地應力場多階段的特徵和演變規律,進而對左、右岸地下廠房洞室群開挖全過程中圍巖應力場、變形場和塑性破壞區的變化特徵,進行了全過程動態數值模擬研究,並詳細討論了圍巖質量、初始地應力場、施工開挖順序對大型地下洞室群圍巖穩定性的影響。
  14. And the delta genetic unit includes distributary channel, distributary bay, small lake of delta plain, swamp, distributary estuary bar, frontal delta mud and sandy density flow and so on. the fluvial system is composed of channel, channel side and flooding basin

    其成因相包括分流河道、決口扇及決口河道、分流間灣、三角洲平原小型湖、沼澤、分流河口、前三角洲泥及砂質重力流等;該區河流體系由河道、河道部及泛濫盆地等沉積組合構成。
  15. According to differences of construction process, boundary condition, temperature and stress of two schemes extending 3m deep short seam on upstream face in the middle of rcc overflow section and no short seam are calculated, what " s more, in this paper the equivalent line drawing of stable temperature field and unstable temperature field during construction and operation period and the duration curve drawing of typical points " s temperature and stress are plotted, and the results of peak and minimum on temperature in every month and maximum on tensile stress are attained

    根據施工過程和界條件,對溢流段中間上游面增設3m深短縫和不設短縫兩個方案進行了溫度和應力計算,並繪制出穩定溫度場等值線圖及施工期、運行期非穩定溫度場等值線圖,典型點溫度和應力歷時曲線圖,逐月最高、最低溫度和最大拉應力及相應位置等成果。
  16. ( 5 ) the maximum water level risen by the enclose tideland cultivation around the reservoir is 0. 66m, the responding quality is 2000mvs, which heavily effect the environment around the reservoir. the reservoir " s water level is risen because cross section and flood canal become narrow, which caused by building dam, this makes groundwater unsmooth, drainage, even flow from a lower to a higher space and soil salinized

    66m ,且為2000m 』兒的常年洪水,對庫區周環境的影響較大,因打築堤縮小過水斷面和行洪通道造成水庫水位進一步抬升,致使庫區周灌區地下水排水不暢,乃至倒灌,型成士地鹽堿化。
  17. However, along with the increasing of construction quantity of the infrastructure of irrigation works, traffic, communication etc., newer and higher requirement of geotechnical anchoring are made in slope, major dam, bridge, tunnel, deep foundation ditch engineering and the construction engineering such as anti - capsize, anti - float, anti - slippage engineering of the buildings. for example, self - intension of rock and soil is required to exploit better ; carrying capacity of anchor increase according to anchoring length ; anchor should be sufficiently lasting and should not influence the exploitation of adjoining stratum

    但另一方面,隨著我國水利、交通、通訊等基礎設施建設力度的加大,坡、大、橋梁、隧洞、深基坑以及建築結構物的抗傾倒、抗浮力、抗滑移等建設工程將對巖土錨固提出一些新的和更高的要求:如要求進一步調用巖土體的自身強度,錨桿應具有足夠的耐久性,錨桿的使用應不影響周地層的開發等。
  18. Inversion analysis of measured displacements is used extensively in geotechnical engineering, structural engineering, information construction, and trauma diagnosis, etc. in this dissertation, parameters identification of original geostress and medium physical property in cavern, slope, tunnel and dam are taken as a cut - in point. macroscale inversion analysis of displacements and numerical solutions of inverse problems of mechanics are researched profoundly. scientific theories of multiscale problems are connected with numerical inversion approaches

    本文以地下洞室、坡工程、隧道工程與大等領域的初始地應力參數和介質物性參數識別為切入點,對宏觀尺度位移反演分析和力學反演問題數值求解方法進行了比較深入的研究,並將多尺度問題科學理論和反演數值方法聯系起來,初步探討了結構性承載材料(如巖石、骨材料等)的多尺度力學模型及其反演方法。
  19. Based on the discuss of the geologic environment of the high slope of spandrel groove jinping i hydroelectric power station. and the engineering geological conditions of rock mass are carefully studied in the paper. the modified csmr are adopted to perform the classification of the slope rock mass, the results of which are combined with the macroscopic stability of the high slope. on the basis of these, the methods of geological diagnosis and the finite element analysis are applied to analyze and compute the overall stability of the high slope

    本文在闡明錦屏一級水電站區巖體的形成和演化特徵的基礎上,詳細研究了拱肩槽高坡巖體的結構特徵及岸坡巖體淺表生改造特徵,建立了岸坡巖體淺表生改造與岸坡演化模式,分析研究了巖體的物理力學性質,採用修正的csmr法對拱肩槽高坡的巖體質量進行分級研究,在此上基礎之上,採用地質分析判斷和有限元分析等方法,對高坡整體穩定性進行了系統分析、計算與評價;應用塊體理論對高坡的局部穩定性進行了分析計算,確定局部不穩定塊體的規模、出露范圍,從而對拱肩槽高坡的局部穩定性有了系統全面的認識和了解。
  20. Analysis of slope stability is one of the most important problems in geotechnical engineering. the stability of all kinds of natural slope, higeway, airport, refuse dump, dam, fill, excavation need to be analysed

    在土木工程中,坡穩定分析十分重要,如各種各樣的天然坡、高速公路、機場、填埋場、土石工程、各種填方、挖方工程等等都需要進行穩定分析。
分享友人