邊壩縣 的英文怎麼說
中文拼音 [biānbàxiàn]
邊壩縣
英文
banbar county-
Taken the bank spillway at yubeishan reservoir as an example, the water loads acted on the spillway, such as static water pressure, dynamic water pressure, shear stress on the surface of the step and so on, are calculated, which can provide evidence to the stability analysis of the dam slope and slope protection
並以萬縣魚背山水庫岸邊溢洪道為例,計算了溢洪道上所受的水流荷載及其分佈,為土石壩坡和護面的穩定分析提供了依據。通過計算證實了既使在較大的單寬流量下,緩坡上的階梯仍有較高的消能率。Abstract : xiao wan hydroelectric installation locate in the boundary between nanjian county and fengqing county of the western of yunnan province. the height of dam is 292 m, and its installed capacity is 4, 200, 000 kilowatt, so it ' s a large - scale water - power engineering. the height of excavation reach to 80 m. so it is sure, that the excavation will influence on the stability of the slop. the stability of the slop is the necessary condition to assure the trouble - free operation of the station
雲南省瀾滄江小灣水電站位於雲南省南澗縣和風慶縣的交界處,最大擬建壩高292m ,裝機容量420萬千瓦,屬特大型水電工程。左岸砂石系統邊坡位於瀾滄江左岸8 ~ #山樑,主體開挖高度達80m ,開挖對邊坡的穩定性產生很大的影響。該邊坡的穩定性對水電工程建設的順利進行。
分享友人