鄰近的工件 的英文怎麼說

中文拼音 [līnjìndegōngjiàn]
鄰近的工件 英文
angrenzender teil adjacent part
  • : Ⅰ形容詞1 (空間或時間距離短) near; close 2 (接近) approaching; approximately; close to 3 (親...
  • : 4次方是 The fourth power of 2 is direction
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ量詞(用於個體事物) piece; article; item Ⅱ名詞1. (指可以一一計算的事物) 2. (文件) letter; correspondence; paper; document
  • 鄰近 : nearclose toadjacent to
  1. Numerical simulation is carried under different conditions, including ( a ) the different distance between deep foundation excavations and the adjacent structures ; ( b ) different supports are used, such as cantilever piles, row piles with one - layer grouted soil anchor, row piles with two - layer grouted soil anchor, row piles with three - layer grouted soil anchor and soil nailings etc. this paper reveal the law of adjacent structures and bracing structures displacements and surrounding soil settlements. anchor and soil nailing ' s impact on the displacements of adjacent structures is analyzed then. further more, we find the law of displacements of bracing structures, surrounding soil settlements, differential settlement and absolute settlements of adjacent structures that may appear in the process of excavation by steps

    模擬分析了建築物在不同距離下,懸臂支護、一層錨桿與排樁聯合支護、兩層錨桿與排樁聯合支護、三層錨桿與排樁聯合支護、土釘支護等幾種支護情況下深基坑開挖過程,對深基坑程開挖過程中建築物變形、支護結構變形以及基坑外地層沉降發展變化規律進行了分析總結;對錨桿和土釘支護對建築物變形影響作了詳細地分析,找到了一些基坑開挖過程中基坑支護結構變形、周圍地層沉降、臨建築不均勻沉降及絕對沉降發展變化規律,得到了一些對深基坑程設計和施程實際意義結論。
  2. With the development of railway construction in china, more and more new multiple tracks are soon put into construction. because of topography and geology limit, nevv tunnel is close to existing tunnel, which frequently results in destruct existing tunnel structure and afifected safe run. these situations disturb safe construction of new tunnel, so it is necessary to research reliable construction technology of close - spaced tunnel

    隨著我國鐵路建設事業發展,越來越多新建復線程將投入建設,由於受地形地質條等因素限制,新建隧道與既有隧道之間設計距離較,導致既有隧道結構破壞、影響運營安全情況時有發生,也妨礙了新建隧道安全施,因此需要進行既有隧道安全施技術研究。
  3. On the basis of a full investigation and study and an integrated analysis of the geological setting and rock - mass mechanical environment of the bank slopes of the hydroelectric project area on the mainstream of the jinsha river and by combining the qualitative analysis with the quantitative evaluation, the authors calculated the instability of the sliding masses according to 1 / 8 and 1 / 11 of the total cubic capacity of the materials falling into the river and the surge wave heights at the falling sites as well as at the xiangjiaba and xiluodu dam sites and in adjacent townships according to the calculation method of the surge wave diagram given by the american society of civil engineers, made the risk evaluation of the bank slope instability with respect to the operation safety at the dam, safety of the cities and townships around the reservoir and safety of the reservoir operation, and put forward precautionary measures for bank slope instability

    摘要筆者通過調查研究和綜合分析金沙江幹流水電程區岸坡地質背景和巖體力學環境條,定性分析與定量評價相結合,採用與三峽程庫區岸坡失穩危險性評價相類比方法,針對崩滑體失穩按總體積1 / 8和1 / 11入江方量進行了計算和按美國土木程學會涌浪圖解計演算法計算了入水點及在向家壩壩址、溪洛渡壩址和城鎮涌浪高度,並圍繞大壩施安全、庫區周邊城鎮安全,水庫運營安全等方面對岸坡失穩危險性進行了評價預測,提出了岸坡失穩防治對策。
  4. According to the characteristics of foundation pit and adjacent building and surrounding circumstance, some reasonable measures are given to protect the safety of adjacent building based on displacement control, such as prestressed anchor for limitation to lateral displacement of foundation pit, as well as root pile for foundation underpinning of adjacent building to increase its stiffness

    摘要根據基坑開挖、場地地質條建築物特點,基於變形控制考慮,採用預應力錨桿限制基坑側向變形,通過微型樁對建築物基礎進行預托換加固增強其抵抗變形能力,保證程順利完和周圍建築安全使用。
  5. Two parameter estimation methods of the texture model based on the gibbs distribution and neighbor pixels are adopted to extract the features of workpiece surface texture. tool wear condition is recognized by the feature parameters of texture

    提出了基於gibbs分佈和基於像元兩種紋理模型參數估計方法以提取表面紋理特徵,並利用紋理特徵參數對刀具磨損浙江大學博士學位論文狀態進行判別。
分享友人