采礦規程 的英文怎麼說

中文拼音 [cǎikuàngguīchéng]
采礦規程 英文
mining regulations
  • : 采名詞(采地) feudal estate
  • : 名詞1. (礦床) ore [mineral] deposit 2. (礦石) ore 3. (開采礦物的場所) mine
  • : Ⅰ名詞1 (畫圓形的工具) instrument for drawing circles 2 (規則; 成例) rule; regulation 3 [機械...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 采礦 : mining; mine (for minerals)采礦船 dredger
  • 規程 : directive rules; standards; standing order; regulations; dictate; code; rules規程曲線 rule curve
  1. Katanga has been largely spared by dr congo ' s war, yet mining giants are only now considering starting large - scale mining there

    加丹加很大度上未受剛果戰爭的影響,但業巨頭們剛剛開始考慮在那裡開展大
  2. Large - scale exploration of the salt mine resources and numbers of migration were the two primary influences on its formation

    在這些市鎮的形成過中,大產資源的開發和大批前來從事的外省移民的湧入是其成因的兩大主導因素。
  3. Based on the example of south dump slope of anjialing open colliery in pingshuo, the rule of surface subsidence was studied using flac ( superscript 3d )

    摘要為研究露天煤排土場邊坡下動沉陷律,結合平朔安家嶺露天南排土場邊坡的實例,採用flac (上標3d )序進行了數值模擬計算。
  4. Taking maluping mine, kaiyang phosphate ore zone as an example, change of mine water amount, its evolution process and law of correlated factors to crush into the pit due to ground surface crack with increases in mining depth, are descryibed

    摘要以開陽磷區馬路坪為例,描述其山隨著深度的增加造成地表開裂變化及其坑水的水量變化和潰入坑的相關因素的演變過律。
  5. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰混凝土的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能混凝土成套技術研究」 ; 4 .水利部「水工混凝土抗沖磨防空蝕技術范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被納並實施,為機場如期通航作出貢獻; 6 .為三峽工抗沖磨高性能混凝土技術、上海寶鋼石碼頭鋼筋混凝土防腐蝕技術、江陰長江大橋大體積粉煤灰混凝土技術、南京長江二橋泵送混凝土技術等提供咨詢建議。
  6. The committee plans to provide the underground mining industry with industry consensus standards, recommended practices, and technical reports for the design and use of underground mining equipment

    委員會計劃為地下工業的地下設備的設計和使用提供業界一致標準、操作建議以及技術報告。
  7. At the same time, mining engineering that is a special work that digs for a tunnel relates to the body of the mountain and the mineral resources which are all irregular 3d solid. so, it is hard to use the traditional design making visualization and computer simulation for mining engineering

    同時,是一種在山體空間進行的巖土開挖工,該工涉及的山體、藏均為不則的三維實體,傳統的工設計很難實現的可視化和計算機模擬。
  8. Aiming at the abnormal strata behavior in the advance entry of 1303 fully - mechanized working face in xinglongzhuang coal mine, the movement rule, characteristic, step distance of fracturing, position and mode of fracturing of the overlying strata in mining process is analyzed by using the key strata theory

    摘要針對興隆莊煤區1303綜放工作面超前平巷發生奇異壓力的現象,採用關鍵層理論對在動過中的上覆巖層運動律進行了詳細的力學分析,研究了它們的運動特徵、破斷步距、斷裂位置、斷裂方式以及對工作面及其超前平巷的來壓律,對比分析了該工作面壓實測數據與理論研究成果。
  9. Application domains include : transportation and logistics planning, pattern classification and image processing, data mining, design of structures, scheduling in large systems, supply - chain management, financial engineering, and telecommunications systems planning

    應用領域有:交通和物流劃、模式識別、圖像處理,資料探勘(資料) 、結構設計,大系統排、供應鏈管理、金融工和電信系統劃。
  10. In conclusion, it is emphasized that the priority in controlling significant hidden perils of gas accident in coal mines contains : deepening the study on the law of unusual gas emission and the related measures of control ; banning illegal exploitation and unlawful production ; seriously checking over and removing hidden perils in coal mine with great efforts ; strengthening production technology management ; preventing production with overcapacity, super - strength and over - staff

    筆者認為,我國煤重大事故隱患治理工重點工作主要是:深入開展瓦斯異常湧出律和相關治理措施的研究;取締非法開和違法生產活動;認真抓好煤隱患排查整改工作;強化生產技術管理,防止超能力、超強度、超定員生產。
  11. Verification regulation of mine dust sampler

    用粉塵樣器檢定
  12. Article 18 prospecting, mining and various construction projects shall not occupy or occupy as little as possible woodlands ; in case of necessary occupancy or expropriation of woodlands, upon examination and approval of the competent forestry authorities under the people ' s government above the county level, the examination and approval formalities for land needed for construction shall be gone through in line with relevant land administration laws and administrative regulations ; and the land - use organization shall pay forest vegetation recovery expenses in line with the relevant provisions of the state council

    第十八條進行勘查、開藏和各項建設工,應當不佔或者少佔林地;必須佔用或者徵用林地的,經縣級以上人民政府林業主管部門審核同意后,依照有關土地管理的法律、行政法辦理建設用地審批手續,並由用地單位依照國務院有關定繳納森林植被恢復費。
  13. Based on conclusion of practical experience from polymer flooding pilot test, and in combination with theoretical calculation and analysis of numerical simulation, the varying range of main production index by polymer flooding is determined, varying mode of liquid production, comprehensive water cut, oil production and incremental oil by polymer flooding is set up by adopting reservoir engineering method, forming simplified, fast and feasible method for calculating production index by polymer flooding, which provide practical and theoretical basis for making polymer flooding programe

    本文在總結聚合物驅場試驗實踐經驗和結合數值模擬理論計算分析的基礎上,研究確定聚合物驅主要開指標的變化范圍,採用油藏工方法建立聚合物驅液量、綜合含水、採油量和增油量的變化模式,形成簡便、快速、實用的聚合物驅開指標測算方法,為編制聚合物驅劃方案提供了實踐和理論依據。
  14. Abstract : based on conclusion of practical experience from polymer flooding pilot test, and in combination with theoretical calculation and analysis of numerical simulation, the varying range of main production index by polymer flooding is determined, varying mode of liquid production, comprehensive water cut, oil production and incremental oil by polymer flooding is set up by adopting reservoir engineering method, forming simplified, fast and feasible method for calculating production index by polymer flooding, which provide practical and theoretical basis for making polymer flooding programe

    文摘:本文在總結聚合物驅場試驗實踐經驗和結合數值模擬理論計算分析的基礎上,研究確定聚合物驅主要開指標的變化范圍,採用油藏工方法建立聚合物驅液量、綜合含水、採油量和增油量的變化模式,形成簡便、快速、實用的聚合物驅開指標測算方法,為編制聚合物驅劃方案提供了實踐和理論依據。
  15. Article 29 in the exploitation of coal resources, coal mining regulations must be complied with, the rational mining sequence followed and the rate of extraction set for exploiting coal resources achieved

    第二十九條開採煤炭資源必須符合煤,遵守合理的開順序,達到定的煤炭資源回採率。
  16. In the paper problems of mine environmental geo - technology coming forth during mining and the harm to human being are analyzed in the first, then several technical and no - technical methods of mine environmental geo - technology are put forward, which is the problems must depend on the strict rule of laws, the effective supervise mechanism, progress of technology and innovation of technology to solve

    作者首先通過分析在山開中可能引起的幾種環境巖土工問題以及對人類活動帶來的嚴重危害,然後從技術和非技術兩個層面上提出了幾種解決這些山環境巖土工問題的方法和途徑,即:山環境問題的解決必須依靠嚴格的法律法和有效的監督管理機制,並以科學技術進步和技術創新為依託。
分享友人