You can fine - tune task links - and make sure you do n ' t gum up the clockwork - by using lag time and lead time
使用「前置重疊時間」和「延隔時間」調整任務鏈接,並且確保那些鐘表裝置不會粘上油漆。By using lead and lag time, you can make your schedule more accurate, and you may be able to shorten it as well
使用重疊時間和延隔時間后,日程將更加準確,同時也可能縮短日程。Other factors may include, but not be limited to, work contours, task calendars, lead and lag time, and task constraints
其他因素還包括工時分佈、任務日歷、前置重疊時間和延隔時間以及任務限制(但不局限於此) 。When studying the network performance, flow control and resource provisioning of communication networks, traffic model plays a very important role. the recent studies show that the date network traffic is self - similar, so the markovian model, which describes telephone networks accurately, is not suitable for date networks. the self - similarity of the network traffic has severe impact on flow control and queuing analysis in date networks, therefore it has received significant attention. in this paper, g m 1 queuing model is used to analyze the queuing performance of generic variable length packet networks for the first time. the self - similar traffic is generated by multiplexing a large set of independent pareto heavy - tailed interarrival on off sources. the simulation results show that the heavy - tailed traffic results in queuing performance deterioration for variable length packet networks, which is in accordance with the analytical results for atm switches
業務量的自相似特徵顯著影響網路的流量控制與排隊分析,已經引起人們的極大重視。採用g m 1排隊模型對分組長度可變的網路的排隊性能進行了分析和模擬,其中自相似業務量是通過疊加大量獨立的到達間隔為pareto重尾分佈的on off源來生成的。模擬結果表明,自相似業務量導致網路的排隊性能劣化,這與有關文獻對atm交換的分析結果一致。In blasting experiments, durations of subordinate basting seismic waves and intensity of influence among them are changed by adjusting the number of subordinate blasting, explosive weigh of subordinate blasting, total quantum of explosive, interval, hole - net parameters and wave resistance of rock, etc
摘要在爆破實驗中,通過調整段數、分段炸藥量、炸藥總量、間隔時間、孔網參數、巖石波阻等爆破相關因素,以改變各分段爆破地震波持續時間、段別間爆破地震波重疊程度來研究爆破地震強度與爆破相關因素間的相互關系。Ice cores from greenland show that warming and cooling episodes occurred every several thousand years, superimposed on the slower advances and retreats of the northern ice sheets
采自格陵蘭的冰心顯示,每隔幾千年,地球就會重復一次暖化和冷卻的事件,時間剛好和北半球冰原緩慢前進與消退的現象重疊。To add lead or lag time
如果要添加前置重疊時間或延隔時間:Use minute, hour, day, week, or month for the lead or lag time units
前置重疊時間或延隔時間的單位可以是分、小時、工作日、周或月。You can express lead or lag time as units of time or as a percentage of the predecessor task ' s duration
可以使用時間單位或前置任務工期的百分比來表示前置重疊時間或延隔時間。After you enter tasks and assign dependencies to them, analyze your schedule and look for instances where you can apply lead or lag time
輸入任務並指定相關性后,應分析日程並查找需要應用前置重疊時間和延隔時間的情況。The time gap, or delay, between tasks is called lag time
使用microsoftproject ,可以在任意兩個鏈接任務間添加前置重疊時間或延隔時間。When necessary, you can exercise even finer control by specifying overlaps and time gaps between tasks
如有必要,指定任務的重疊或間隔可以更好地進行控制。A new sequential images sub - splicing method is proposed, which based on features of markers and aimed at looking for the same markers in overlapped area of two adjacent images to finish the splicing task. no real image coalescence is done, but the redundant information is diminished, so the two adjacent images are considered well spliced. big marks are interlaced with small ones to realize accurate image sub - splicing in real situation
闡述了種子動態圖像拼接原理,提出了動態圖像亞拼接檢測方法,該方法基於標記特徵,以搜尋相鄰兩幀圖像中重疊區域內相同標記為目標,利用相同標記在前後兩幀圖像中應具有相同特徵向量的特點,通過特徵向量的匹配,實現冗餘圖像信息的去除,達到相鄰兩幀圖像的拼;提出了大小間隔的標記方案,以適應採集工況,實現準確圖像亞拼接;研究了重疊區域寬度對拼接精度的影響,給出了重替區域寬度設置方式。After you ' ve linked the tasks, however, you can change the link to a start - to - start, finish - to - finish, or start - to - finish link
不過,在鏈接任務后,可以將鏈接更改為開始-開始、結束-結束或開始-結束鏈接(也可以指定前置重疊時間和延隔時間) 。You might find that you can overlap tasks so much that they start at the same time. if that ' s the case, you should consider changing the fs link to a start - to - start ( ss ) link, instead of adding lead time
有時重疊的時間非常多,結果是它們同時開始,如果這樣,請將fs鏈接改為開始-開始( ss )鏈接,而不是添加延隔時間。C1, ., cn so that the constraints should form a set of disjointed or nonoverlapping intervals
約束,從而使約束形成一組不聯接或不重疊的間隔。Setting the overlaps and intervals under different requests