重載繩 的英文怎麼說

中文拼音 [zhòngzǎishéng]
重載繩 英文
head rope
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : Ⅰ名詞1 (繩子) rope; cord; string 2 (墨線) the line in a carpenter s ink marker 3 (姓氏) a s...
  1. Too heavy a load will strain the rope to its breaking point

    會把子拉緊到崩斷的地步。
  2. Through developing the comprehensive experiment device with large - scale drum strength and stability, the stress - measuring experiments of various wall thickness of the normal drums of the cranes were performed. the law that the stress of the drums along the circumference and along the axis changes with the load increase of the wire ropes was studies for the first time

    通過研製全比尺大型捲筒強度、穩定性綜合試驗裝置,對起機常用規格的捲筒進行了各種壁厚條件下的應力測量試驗,首次對捲筒體周向和軸向應力隨鋼絲逐步加過程變化的規律進行了研究,發現最大應力產生在鋼絲繞過后3 ~ 5圈截面處,該現象與理論分析結果也是符合的。
  3. To meet this challenge, a research project was supported by ministry of communication and bv shanghai zhenhua port machinery co. ltd. focusing on analysis of tdtcd ( traditional design theories of crane drums ) the paper has studied the impacts of features under the binding force of wire ropes, the end - plate and rope slot. this study is based not only on the thin shell theory and viscoelastic mechanics to calculate the strength and stability of drum, but also on an experiment with technology in " state of act "

    本文結合交通部點科技項目「港口起機鋼絲傳動件高性能技術研究」和上海振華港機股份有限公司委託項目「起機焊接捲筒極限壁厚研究」 ,針對起機捲筒傳統設計方法偏於保守的情況,以薄殼理論和近代力學為基礎,以現代試驗技術為研究手段,對鋼絲緊箍力作用下的外特性、端板、槽等因素對捲筒強度和穩定性的影響進行了系統的理論研究,在深入開展捲筒強度、穩定性和實驗模態分析等試驗的基礎上,提出了有別于傳統方法的捲筒強度、穩定性計算方法。
  4. This paper presents design thinking, operation and structure of a load self - locked brake type elevator which features endless stroke, single sheave and rope - groove friction

    摘要介紹1種直機械中的無限行程單卷盤回轉型槽耦合式負自鎖制動提升機的設計思想、工作原理和結構形式。
  5. Steel wire ropes - safety - part 8 : stranded hauling and carrying - hauling ropes for cableway installations designed to carry persons

    鋼絲.安全性.第8部分:人索道設備用絞股牽引和承牽引鋼絲
  6. This can be of significant benefit to cut down the cost and time limit for a project the program package gone with this paper may realizes the dynamic simulation for all of courses in hoisting, and may synchronously displays the axis force of derrick, the pull - force of the steel wire, obliquity of equipment and overloading instance

    這有利於工程實踐中方案變更、施工現場條件復雜多變等的方案驗算,節約成本和縮短工期。本論文程序為桅桿吊裝整個過程實現了動態模擬,顯示桅桿軸向壓力、鋼絲拉力、設備傾角和起提示,為安全吊裝設備提供要的數據,有利於作業過程的全程監控。
  7. Safety device include : overload protection, wirerope break protection, height limit protection

    設有過保護、斷保護、工作高度保護等多安全保護裝置。
  8. Steel wire ropes - safety - part 9 : locked coil carrying ropes for cableway installations designed to carry persons

    鋼絲.安全性.第9部分:人索道設施用保持線圈吊
  9. Consequently overloads can be reliably prevented, slack rope situations recognised and balance weights safely monitored

    因此可以可靠的預防超索鬆弛的情況和安全的監視平衡物。
分享友人